Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Cluj-Napoca
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====Trams==== The local transportation company, CTP, manages a tram line that runs through the city. Planned modernisation will involve the installation of new rail tracks and the separation of the tram route from road traffic. This will bring a number of advantages, including vibration and shock reduction, a substantial noise decrease, long use expectancy and higher [[Mass transit|transit]] speed – {{convert|60|to|80|km/h|mph|abbr=on}}.<ref>{{Cite web |date=18 January 2007 |title=Tramvaiul clujean circulă expirat |url=http://www.ftr.ro/index.php?cmd=d&id=1589 |url-status=dead |archive-url=https://web.archive.org/web/20080212002628/http://www.ftr.ro/index.php?cmd=d&id=1589 |archive-date=12 February 2008 |access-date=2008-03-12 |publisher=Foaia Transilvană |language=ro}}</ref> The route will undergo major alteration on Horea Street, between the [[Chamber of Commerce]] and the central rail station, a rather problematic area. This dilemma should be solved either with the relocation of the track next to the sidewalk, or through the construction of a suspended tunnel.<ref>{{Cite web |date=22 November 2007 |title=Vor tunel suspendat pe strada Horea |url=http://www.ziuadecj.ro/action/article?ID=5568 |url-status=dead |archive-url=https://web.archive.org/web/20080203124534/http://www.ziuadecj.ro/action/article?ID=5568 |archive-date=3 February 2008 |access-date=2008-03-12 |publisher=Ziua de Cluj |language=ro}}</ref> Another area that will benefit from large-scale changes is "Splaiul Independenței", where the tracks will be pulled back to the [[Cluj-Napoca Central Park|Central Park]], so that the roadway can host two lanes. In the Mănăștur area, under the bridge, the tracks will be brought closer, while other major works will executed on the traffic circle on Primăverii Street. Given the development of the [[Cluj-Napoca metropolitan area|metropolitan area]], further plans feature the creation of a [[light rail]] track between [[Gilău, Cluj|Gilău]] and [[Jucu]] that will use these modernised tracks in the city.<ref>{{Cite web |date=21 November 2007 |title=Aviz pentru tramvai nou în Cluj |url=http://old.clujeanul.ro/cotidian/nocache/articol/Cluj/Aviz_pentru_tramvai_nou_in_Cluj.html |url-status=dead |archive-url=https://web.archive.org/web/20080214162106/http://old.clujeanul.ro/cotidian/nocache/articol/Cluj/Aviz_pentru_tramvai_nou_in_Cluj.html |archive-date=14 February 2008 |access-date=2008-03-12 |publisher=Clujeanul |language=ro}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)