Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Belgrave line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Future == === Level Crossing Removals === [[File:New Bayswater Railway Station under construction, Melbourne.jpg|alt=A train station in the distance|thumb|The rebuilt [[Bayswater railway station, Melbourne|Bayswater station]] viewed from the removed level crossing.]] The [[Level Crossing Removal Project]] has announced the removal of seven level crossings between the city and [[Ferntree Gully railway station|Ferntree Gully station]], to be completed in stages from 2016 to 2025. In 2016, two level crossings were removed at [[Mountain Highway]] and Scoresby Road, [[Bayswater, Victoria|Bayswater]], through lowering the rail line under the road.<ref name=":4">{{Cite web |last=Victoria’s Big Build |date=13 June 2022 |title=Goodbye Scoresby Road level crossing |url=https://bigbuild.vic.gov.au/news/level-crossing-removal-project/goodbye-scoresby-road-level-crossing |access-date=24 February 2023 |website=Victoria’s Big Build |language=en |archive-date=24 February 2023 |archive-url=https://web.archive.org/web/20230224100153/https://bigbuild.vic.gov.au/news/level-crossing-removal-project/goodbye-scoresby-road-level-crossing |url-status=live }}</ref> These two removals also included a rebuilt Bayswater station and upgraded stabling facilities.<ref>{{Cite web |last=Victoria’s Big Build |date=21 June 2022 |title=Mountain Highway, Bayswater |url=https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mountain-highway-bayswater |access-date=24 February 2023 |website=Victoria’s Big Build |language=en |archive-date=24 February 2023 |archive-url=https://web.archive.org/web/20230224100144/https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/mountain-highway-bayswater |url-status=live }}</ref> A further two crossings were removed at Blackburn Road, [[Blackburn, Victoria|Blackburn]], and Heatherdale Road, [[Ringwood, Victoria|Ringwood]] in January 2017.<ref name=":0">{{Cite web |title=The level crossings at Blackburn Road and Heatherdale Road are now gone. {{!}} Premier of Victoria |url=http://www.premier.vic.gov.au/site-4/level-crossings-blackburn-road-and-heatherdale-road-are-now-gone |access-date=24 February 2023 |website=www.premier.vic.gov.au |language=en |archive-date=24 February 2023 |archive-url=https://web.archive.org/web/20230224094833/https://www.premier.vic.gov.au/site-4/level-crossings-blackburn-road-and-heatherdale-road-are-now-gone |url-status=live }}</ref> Both of these removals also involved lowering the rail line under the road, with a rebuilt [[Heatherdale railway station|Heatherdale station]] built as part of the project.<ref name=":0" /> Union and Mont Albert Roads were also been removed by lowering the rail line in May 2023.<ref>{{Cite web |last=Victoria’s Big Build |date=2 February 2023 |title=Union Road, Surrey Hills |url=https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/union-road-surrey-hills |access-date=24 February 2023 |website=Victoria’s Big Build |language=en |archive-date=18 February 2023 |archive-url=https://web.archive.org/web/20230218044632/https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/union-road-surrey-hills |url-status=live }}</ref> The removals also included closing [[Mont Albert railway station|Mont Albert]] and [[Surrey Hills railway station|Surrey Hills]] stations, with a new station built in-between called "[[Union railway station, Melbourne|Union]]."<ref>{{Cite web |last=Victoria’s Big Build |date=22 June 2022 |title=Final designs for the new Union Station and precinct |url=https://bigbuild.vic.gov.au/news/level-crossing-removal-project/final-designs-for-the-new-union-station-and-precinct |access-date=24 February 2023 |website=Victoria’s Big Build |language=en |archive-date=24 February 2023 |archive-url=https://web.archive.org/web/20230224100143/https://bigbuild.vic.gov.au/news/level-crossing-removal-project/final-designs-for-the-new-union-station-and-precinct |url-status=live }}</ref> The final crossing to be removed on the corridor was at Bedford Road in Ringwood by also lowering the rail line, completed in March 2024.<ref>{{Cite web |last=Victoria’s Big Build |first= |date=2024-03-25 |title=Bedford Road level crossing chalks up big milestone |url=https://bigbuild.vic.gov.au/news/level-crossing-removal-project/bedford-road-level-crossing-chalks-up-big-milestone |url-status=live |archive-url=https://web.archive.org/web/20240326224110/https://bigbuild.vic.gov.au/news/level-crossing-removal-project/bedford-road-level-crossing-chalks-up-big-milestone |archive-date=2024-03-26 |access-date=2024-04-15 |website=Victoria’s Big Build |language=en}}</ref> At the conclusion of these removals, only two crossings remain: Alpine St and Railway Ave, both between Ferntree Gully and Upper Ferntree Gully.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)