Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Cardiff Railway
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Construction== [[File:Cardiff East Dock Locomotive Depot geograph-2558239-by-Ben-Brooksbank.jpg|thumb|left|0-6-2T, No. 155 at Cardiff East Dock Depot 1950]] The line had been expensive to construct; the ''[[Railway Magazine]]'' described the structure on the line: <blockquote>The construction of the Cardiff Railway has involved a number of heavy engineering works. There are nine skew bridges, five crossing the Merthyr river, three across the Glamorganshire Canal, and one across the River Taff. Near Nantgawr the River Taff has been diverted. The various cuttings and embankments are mostly of an extensive character. Ten retaining walls, 12 under bridges, 10 over bridges, a short tunnel and a viaduct contributed to the difficult nature of the work. The engineers were [[Charles Douglas Fox|Sir Douglas Fox]] and Mr. H. White, Mr. Herbert E. Allen, M.I.C.E., being resident engineer.<ref name = rlymag/></blockquote>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)