Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interstate 265
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==History== [[File:Junction 31E I265.JPG|thumb|Junction of [[U.S. Route 31E in Kentucky|US 31E]] and KY 841]] === Kentucky portion === Originally signed as KY 841, the Jefferson Freeway was initially constructed in the 1960s in two sections—one between [[Kentucky Route 155|KY 155]] (Taylorsville Road) and [[U.S. Route 60 in Kentucky|US 60]] (Shelbyville Road) and a second section between [[Kentucky Route 1447|KY 1447]] (Westport Road) and [[U.S. Route 42 in Kentucky|US 42]]—as short connectors to the eastern suburban expansion as well as a [[Kentucky Truck Assembly|new Ford plant]]. By 1970, [[Interstate 264 (Kentucky)|I-264]] had become very congested and was in need of reconstruction and other improvements. I-265 was proposed as an outer beltway to provide pass-through motorists relief from the congestion of I-264. Construction started in the early 1980s and was finished later that decade and signed in 1987. {{Infobox road small |state=IN |type=IN |route=265 |location=[[Clarksville, Indiana|Clarksville]]—[[Utica, Indiana]] |length_mi=6.2 |length_ref= |length_round= |formed=1977 |deleted=2023 }} === Indiana portion === Originally signed as '''State Road 265''' ('''SR 265'''), the segment of the highway stretched from I-64 to I-65. It was later extended to [[Indiana State Road 60|SR 60]], today's exit 10. The freeway was legally rechristened in June 2019 to I-265 after a new {{convert|7.7|mi|km|adj=on}} section of highway that includes the Lewis and Clark Bridge (known as the East End Bridge during planning and construction) fully opened to traffic on December 18, 2016, however the SR 265 signs along the road and the exits still remain and have not been updated to I-265 signage, while the Kentucky portion of the new roadway likewise has not had I-265 signage added as of yet. In early 2023, Indiana DOT announced plans to redesignate as well as renumber the exits of the freeway beginning in the fall of 2023 and with completion expected over the {{Update after|2025|12|text=next two years|reason=See INDOT reference}}.<ref name=INrenumbering>{{Cite web |last=INDOT |date=February 16, 2023 |title=I 265 Resigning |url=https://www.in.gov/indot/about-indot/central-office/welcome-to-the-seymour-district/i-265-resigning/ |access-date=March 9, 2023 |website=INDOT |language=en |archive-date=March 9, 2023 |archive-url=https://web.archive.org/web/20230309003453/https://www.in.gov/indot/about-indot/central-office/welcome-to-the-seymour-district/i-265-resigning/ |url-status=live }}</ref> As of February 2025, I-265 signage exists from the western terminus at I-64 to Charlestown Pike, about a mile west of the IN 62 interchange. === East End Bridge === Negotiations between Indiana and Kentucky to build the bridge had taken place over the preceding 30 years. In late 2005, members of the [[Louisville Metro Council]] proposed a committee to begin planning a western bridge over the Ohio River to link the southwestern end of the highway in Kentucky to Indiana. On December 18, 2016, SR 265 was extended east of SR 62, which crosses the Ohio River connecting with KY 841, and north of US 42 in Kentucky as part of the [[Ohio River Bridges Project]], creating a bypass around the eastern side of the city of Louisville. The I-265/I-64 interchange, previously a cloverleaf with no [[collector–distributor lane]]s,<ref>{{Cite web |title=Interstate 64 at Interstate 265 Interchange Reconstruction {{!}} KYTC |url=https://transportation.ky.gov/DistrictFive/Pages/Interstate-64-at-Interstate-265-Interchange-Reconstruction.aspx |access-date=March 23, 2022 |website=transportation.ky.gov |archive-date=February 23, 2022 |archive-url=https://web.archive.org/web/20220223172235/https://transportation.ky.gov/DistrictFive/Pages/Interstate-64-at-Interstate-265-Interchange-Reconstruction.aspx |url-status=live }}</ref> was reconstructed as part of the I-Move Kentucky project, with estimated completion originally set for fall 2023 but delayed to fall 2024.<ref>{{Cite web |title=About – I-Move Kentucky |url=https://i-moveky.com/about/ |access-date=March 23, 2022 |website=i-moveky.com |archive-date=February 23, 2022 |archive-url=https://web.archive.org/web/20220223172234/https://i-moveky.com/about/ |url-status=live }}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)