Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interstate 465
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Subsequent improvements and changes=== The first of the major post-completion rebuild and expansion projects occurred from 1999 to 2002, when the heavily traveled northern section of the east leg was modernized and expanded to as many as 13 lanes in one short portion. Concurrently, the east junction with I-70 was rebuilt and reconfigured. In 2000, the Emerson Avenue interchange on the south leg was converted from a conventional diamond to a [[single-point urban interchange]] (SPUI), becoming the first SPUI on the I-465 beltway. Between 2004 and 2005, the north extension of I-465's west leg between I-65 and I-865 was rebuilt to widen and update the freeway in this heavily traveled section located along the western edge of the massive Park 100 commercial and industrial development. This segment was rapidly becoming functionally obsolete due to continued growth of that complex as well as that of other nearby residential and commercial projects in [[Pike Township, Marion County, Indiana|Pike Township]]. Both interchanges along this stretch, 71st Street (exit 21) and 86th Street (exit 23), were totally rebuilt while remaining open to traffic and had loop ramps added for west-to-south movements. In addition, a new northbound exit ramp was added at exit 21 which bridges over 71st Street to directly deposit motorists onto eastbound 73rd Street. On the mainline, dual auxiliary lanes were added in each travel direction between these interchanges and the 79th Street grade separation over I-465 was demolished and rebuilt to allow for the widened freeway below. Distinctive decorative features were also incorporated into most of the grade separation structures within this project. Also, bicycle paths were established along the southern side of both 86th and 71st streets, which included grade separations with the east-to-south ramps at both interchanges.{{citation needed|date=July 2018}} In April 2002, the [[Indiana Department of Transportation]] (INDOT) announced the redesignation of the dogleg portion of I-465 as [[Interstate 865|I-865]]. This change eliminated the three-way intersection of I-465 where the north extension of the west leg met the original north leg (at exit 25).<ref name=INDOT20020424>{{cite press release |author = Indiana Department of Transportation |author-link = Indiana Department of Transportation |url = http://www.in.gov/serv/presscal?PF=dot&Clist=6&Elist=52862 |access-date = December 5, 2016 |publisher = Indiana Department of Transportation |title = Indiana's 'New' Interstate: I-865 |date = April 24, 2002 |archive-date = January 10, 2018 |archive-url = https://web.archive.org/web/20180110235746/http://www.in.gov/serv/presscal?PF=dot&Clist=6&Elist=52862 |url-status = live }}</ref> INDOT completed an $800-million (equivalent to ${{Formatprice|{{inflation|US-GDP|800000000|2012}}}} in {{Inflation/year|index=US-GDP}}{{Inflation/fn|index=US-GDP}}) project called Accelerate 465 to refurbish and reconfigure the original west leg of the loop between July 2007 and December 2012. This project completely rebuilt and added new travel lanes, added auxiliary lanes, rebuilt many grade separations, and reconfigured nearly all of the interchanges along I-465 from just north of the Kentucky Avenue (SR 67 south) interchange to the 56th Street partial interchange. The junction with [[Interstate 74 in Indiana|I-74]] and Crawfordsville Road ([[U.S. Route 136 in Indiana|US 136]] west) was reconfigured to allow direct access between I-465 and US 136 for the first time. Interlaced into that design is a full directional connection for I-74, which replaced the former cloverleaf interchange and removed its original stub connector east of I-465 to the intersection of Crawfordsville Road and High School Road in Speedway.<ref>{{cite web |url = http://www.in.gov/indot/3042.htm |title = INDOT: Accelerate 465 |access-date = September 9, 2012 |archive-date = October 24, 2012 |archive-url = https://web.archive.org/web/20121024114027/http://www.in.gov/indot/3042.htm |url-status = live }}</ref> Also in 2007, another undertaking was launched by INDOT to modernize the entire northeastern portion of I-465. All three interchanges along the freeway in this stretch—Keystone Avenue (exit 33), Allisonville Road (exit 35) and I-69/Binford Boulevard (exit 37)—were to be modified and rebuilt.<ref name=WISH-TV>{{cite news |url = http://www.wishtv.com/Global/story.asp?S=7262468 |title = INDOT Reveals Plans for Major Construction on I-465 & I-69 |publisher = WISH-TV |location = Indianapolis |date = October 24, 2007 |url-status = dead |archive-url = https://web.archive.org/web/20080514153630/http://www.wishtv.com/Global/story.asp?S=7262468 |archive-date = May 14, 2008 }}</ref> As this project progressed, financial constraints prompted INDOT to scale back its scope.{{citation needed|date=December 2016}} The reconstruction of I-465 between the White River bridge and Fall Creek, including the interchange with I-69, began in 2022 under a separate project announced in 2015 and formally relaunched as "Clear Path 465" in 2017.<ref name="INDOT20151229">{{cite press release |title=State to Invest $50 Million to Improve I-465/I-69 Interchange on Indy's Northeast Side |url=http://www.in.gov/activecalendar/EventList.aspx?fromdate=1/1/2013&todate=12/31/2016&display=Month&type=public&eventidn=240808&view=EventDetails&information_id=235805 |publisher=Indiana Department of Transportation |date=December 29, 2015 |access-date=December 8, 2016 |archive-date=December 21, 2016 |archive-url=https://web.archive.org/web/20161221141652/http://www.in.gov/activecalendar/EventList.aspx?fromdate=1%2F1%2F2013&todate=12%2F31%2F2016&display=Month&type=public&eventidn=240808&view=EventDetails&information_id=235805 |url-status=live}}</ref><ref name=ClearPath463>{{cite web |url = https://www.in.gov/indot/3654.htm |title = Clear Path 465 (Interstate 465 & 69 Northeast) |publisher = Indiana Department of Transportation |access-date = July 17, 2018 |archive-date = July 18, 2018 |archive-url = https://web.archive.org/web/20180718001726/https://www.in.gov/indot/3654.htm |url-status = live }}</ref> The original, scaled-back project concluded by the end of 2012. The beltway's mainline was reconstructed with additional travel and auxiliary lanes being added in two separate segments—from east of Meridian Street to Allisonville Road and from a point at the southeast end of the I-69/Binford interchange southward to Fall Creek. The Keystone Avenue [[partial cloverleaf interchange]] was reconfigured to allow [[free-flow interchange|free-flowing]] access for most of the movements between I-465 and Keystone. Although Keystone operates as a [[controlled-access highway]] both north of I-465 and up to the first junction south of the Interstate, the movements from westbound I-465 to southbound Keystone and from eastbound I-465 to northbound Keystone are not free-flowing but are left turns controlled by traffic lights. At Allisonville Road, the interchange was converted into a more efficient SPUI configuration. Finally, though the interchange itself was not rebuilt, the I-69/Binford Boulevard junction had two ramps slightly modified to facilitate better traffic flow.<ref name=WISH-TV /> As part of the major project to upgrade {{convert|13|mi|km}} of [[U.S. Route 31 in Indiana|US 31]] in [[Hamilton County, Indiana|Hamilton County]] to a full [[Interstate-standard]] freeway, the I-465 north leg interchange at [[Meridian Street (Indianapolis)|Meridian Street]] (exit 31) was reconfigured between October 2013 and December 2015 (with some additional work continuing until November 22, 2016) to the present partial directional (system interchange) design which allows for free-flow movements to or from the new US 31 freeway to the north.{{citation needed|date=December 2016}} As part of its Operation Indy Commute project, INDOT began work in 2013 to widen I-65 on both its northbound and southbound mainlines from exit 103 at Southport Road northward to the junction with I-465's south leg, which would also be modified. To reduce congestion at and near that interchange, the loop ramp from westbound I-465 to southbound I-65 was replaced by a flyover ramp. The eastbound I-465 exit to southbound I-65 was also expanded for smoother merging with the new west-to-south flyover. In addition, grade separations over I-465 were replaced on Sherman Drive and Carson Avenue to allow for longer and wider approaches to this busy junction. Most of this work was completed in late 2014.<ref name="indotindycommunute">{{cite web |title = Operation Indy Commute: I-65 & I-465 South |publisher = Indiana Department of Transportation |url = http://www.in.gov/indot/3072.htm |access-date = April 2, 2015 |archive-date = April 3, 2015 |archive-url = https://web.archive.org/web/20150403180659/http://www.in.gov/indot/3072.htm |url-status = live }}</ref> In 2022, construction began on Clear Path 465, a project involving widening I-465 between the White River and Fall Creek, as well as rebuilding the interchange of I-465 and I-69 in the northeast region of Indianapolis. As part of this project, the interchange will be reconfigured to provide a direct movement for traffic on I-69 to continue onto I-465 southbound, which will be concurrent with I-69 upon the interstate's completion.<ref>{{Cite web |title=Clear Path 465 - A Project to Improve Safety & Traffic Flow |url=https://clearpath465.com/ |access-date=2024-08-06 |website=Clear Path 465 |language=en-US}}</ref> On August 6 and 9, 2024, the interchange between I-69 and I-465 on the southwest side of Indianapolis (exit 5) officially opened to traffic, with I-69 running concurrently with I-465 on the southeast half of the beltway between exits 5 and 37.<ref name="69south">{{cite web |title=I-69/I-465 System Interchange |url=https://i69finishline.com/i69interchangeopening/ |website=I-69 Finish Line |publisher=[[Indiana Department of Transportation]] |access-date=August 8, 2024}}</ref> With the portion between exits 5 and 49 also including part of the existing concurrency of I-465 and I-74, this created another instance of a three-route concurrency within the [[Interstate Highway System]], the other two (both in Wisconsin) being in [[Milwaukee]] and between [[Madison, Wisconsin|Madison]] and [[Portage, Wisconsin|Portage]].{{Citation needed|date=August 2024}}
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)