Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interstate 97
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Reconstruction of existing highway=== Reconstruction of the MD 3 divided highway and the Glen Burnie Bypass was a complex operation that involved many temporary openings, lane shifts, construction of new roadways, and reconstruction of existing roadways over several phases over several years.<ref name="Milestones"/> The first improvement was the reconstruction of the I-695 interchange between 1987 and 1991.<ref name="logbook 3p13"/><ref name="1991 map"/> The modern ramps from I-97 to westbound I-695 and from eastbound I-695 to I-97 were built, eastbound I-695's ramp over these two ramps was constructed, and the loop ramp from I-97 to westbound I-695 was removed.<ref name="1991 map"/> I-97 from its interchange with MD 648 to the new beltway ramps was reconstructed to [[Interstate Highway standards]] and expanded to six lanes between May 1993 and August 1995.<ref name="logbook 3p15"/><ref name="Baltimore Sun 16 to 17 Widening Start"/><ref name="Baltimore Sun 16 to 17 Widening Finish"/> Part of the functionality of the loop ramp to westbound I-695 was restored in October 1995 when another ramp from the Harbor Tunnel Thruway approach to westbound I-695 was added to allow access from I-97 to MD 648.<ref name="Baltimore Sun MD 648"/> [[File:2016-08-12 14 48 04 View north along Interstate 97 (Robert Crain Highway) just north of Exit 10 in Severna Park, Anne Arundel County, Maryland.jpg|thumb|left|I-97 northbound in Severna Park]] Reconstruction of the MD 3 divided highway from Millersville to MD 3 Bus. began in 1987 over two sections. The first section, from north of MD 3 Bus. to north of Benfield Boulevard, began in 1987.<ref name="logbook 3p13"/> The work included the construction of the flyover ramp from northbound I-97 to Veterans Highway just south of MD 3 Bus.<ref name="1989 map"/><ref name="1991 map"/> The section from north of Benfield Boulevard to MD 178 at Dorrs Corner was reconstructed starting in 1989.<ref name="logbook 3p13"/> The second section included construction of the Benfield Boulevard interchange.<ref name="1989 map"/><ref name="1991 map"/> The southbound MD 3 roadway was rebuilt in place as the southbound lanes of I-97. New northbound lanes were built immediately to the east of the southbound lanes.<ref name="1989 map"/><ref name="1991 map"/> In February 1991, the new northbound lanes opened and access from I-97 to Veterans Highway was removed at Dorrs Corner.<ref name="Baltimore Sun 7 to 12 Reconstruction"/> The old northbound lanes were reconstructed and repurposed as a two-lane road, Veterans Highway, later that year.<ref name="1991 map"/><ref name="Baltimore Sun 7 to 12 Reconstruction"/> Anne Arundel County agreed to accept Veterans Highway for maintenance after the I-97–related construction concluded in a road transfer agreement on July 21, 1988.<ref name="Memo 1991-11-15"/> MD 3 was truncated at Millersville after I-97 opened in October 1991; signage for MD 3 on I-695 was removed by 1993.<ref name="1991 map"/><ref name="Memo 1991-11-15"/><ref name="Baltimore Sun MD 3 Signage"/> Before reconstruction of the Glen Burnie Bypass from MD 3 Bus. to MD 648 began in November 1993, the Stewart Avenue bridge across the Interstate just south of the MD 100 interchange was replaced and ramps from northbound I-97 to eastbound MD 100 and from westbound MD 100 to southbound I-97 were added between 1990 and 1992.<ref name="Baltimore Sun 12 to 16 Widening Start"/> The freeway was reconstructed to Interstate standards in three sections.<ref name="logbook 3p15"/> The middle section from MD 174 to MD 176 was reconstructed concurrently with the segment of MD 100 west from I-97 to MD 295 starting in 1993.<ref name="logbook 3p15"/> That segment of MD 100, including the MD 100–I-97 interchange, opened in November 1996, and the reconstruction of the middle section of I-97 was finished in July 1997.<ref name="Baltimore Sun MD 100"/><ref name="Baltimore Sun 13 to 15 Widening Finish"/> The sections of I-97 from MD 3 Bus. to MD 174 and from MD 176 to MD 648 and were reconstructed starting in January 1994.<ref name="logbook 3p15"/> The MD 176–MD 648 roadway sectional was completed in March 1996. <ref name="Baltimore Sun 15 to 16 Finish"/> The northern half of the MD 176 interchange was reconstructed as part of the latter project. The new loop ramp from northbound I-97 to westbound MD 176 and the new ramp from MD 176 to northbound I-97 were completed in 1995.<ref name="1995 map"/> The ramp from southbound I-97 to MD 176 was removed during the widening project.<ref name="Baltimore Sun 13 to 15 Widening Finish"/> The pair of ramps between southbound I-97 and MD 162 to replace the removed ramp were constructed between 1996 and 1998.<ref name="logbook 3p15"/><ref name="Baltimore Sun 13 to 15 Widening Finish"/><ref name="1999 map"/> The final piece of construction on I-97 was the reconstruction of its interchange with MD 174, which began in 2002 and concluded in 2005.<ref name="logbook 3p15"/><ref name="Baltimore Sun MD 174"/><ref name="Maryland HLR 2005"/>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)