Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Material requirements planning
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Outputs=== There are two outputs and a variety of messages/reports: * Output 1 is the "Recommended Production Schedule." This lays out a detailed schedule of the required minimum start and completion dates, with quantities, for each step of the Routing and Bill Of Material required to satisfy the demand from the [[master production schedule]] (MPS). * Output 2 is the "Recommended Purchasing Schedule." This lays out both the dates on which the purchased items should be received into the facility ''and'' the dates on which the [[purchase order]]s or blanket order release should occur in order to match the production schedules. Messages and reports: * [[Purchase order]]s. An order to a supplier to provide materials. * Reschedule notices. These ''recommend'' cancelling, increasing, delaying or speeding up existing orders.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)