Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Reliance Infrastructure
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Metro projects=== *[[Line 1 (Mumbai Metro)|Line-1 of Phase-1 of Mumbai Metro]]: One of the three metro lines in this phase was awarded to a consortium led by R-Infra. The other two lines were awarded to other parties. [[Mumbai Metro One Pvt Ltd]], which is a consortium of R-Infra, [[Veolia Transport]], and [[Mumbai Metropolitan Region Development Authority]] (MMRDA) secured the contract for the {{INRConvert|23.56|b}} [[Versova (Mumbai)|Versova]]-[[Andheri]]-[[Ghatkopar]] section. Mumbai Metro I is operational.<ref>{{Cite web |url=http://www.dnaindia.com/mumbai/report_mumbais-first-metro-may-chug-in-march-2013_1685026 |title= "Mumbai's first metro may chug in 2013". DNA India| access-date=8 May 2012}}</ref> The project will be implemented on a [[Build-Operate-Transfer]] basis, where the consortium will collect revenue for 35 years and then hand over the infrastructure to the government.<ref>{{Cite web |url=http://www.dnaindia.com/mumbai/interview_metro-worli-haji-ali-sea-link-work-on-schedule_1424454-all |title='Metro, Worli-Haji Ali sea link work on schedule' β Mumbai β DNA |work=Daily News and Analysis |date=17 August 2010 |access-date=2 September 2010}}</ref> *[[Line 4 (Mumbai Metro)|Line 4 of Phase 2 of Mumbai Metro]]: The contracts for three "packages" (18 stations) have been awarded to a consortium led by R-Infra, but apparently, the contract does not include the laying of any tracks. The total length of Line-4 is 32.32 km (20.08 mi) with 32 stations, and the line will connect [[Wadala]] to [[Kasarvadavali]] via [[Ghatkopar]] and [[Mulund]]. Out of this, the contract for constructing three "packages" (18 stations) has been awarded to the "Reliance-[[Astaldi]] Joint Venture." Construction began in June 2018 and is expected to be completed by 2021. *[[Delhi Airport Metro Express|Airport Express (Orange Line)]]: The Airport Express line of [[Delhi Metro]] connecting New Delhi railway station to Dwarka Sector-21 metro station, through the [[Indira Gandhi International Airport]]. It was opened to the public on 23 February 2011. It has 6 stations covering a length of 22.7 km. All six metro stations on the Orange line are called City Airport Terminals (CATs).
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)