Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Sandringham line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Future == === Network reconfiguration === When the new cross-city rail corridor being built by the [[Metro Tunnel]] opens in 2025 there will be a reorganisation of the Melbourne rail network.<ref name=":42">{{Cite web |title=PTV Network Development Plan Metropolitan Rail Overview |url=https://www.ptv.vic.gov.au/assets/PTV-default-site/footer/legal-and-policies/growing-our-rail-network-2018-2025/PTV_Network-Development-Plan_Metropolitan-Rail_Overview_2016update.pdf |access-date=18 December 2012 |website=Public Transport Victoria |archive-date=19 September 2021 |archive-url=https://web.archive.org/web/20210919131436/https://www.ptv.vic.gov.au/assets/PTV-default-site/footer/legal-and-policies/growing-our-rail-network-2018-2025/PTV_Network-Development-Plan_Metropolitan-Rail_Overview_2016update.pdf |url-status=live }}</ref> The [[Department of Transport and Planning|Victorian Department of Transport and Planning]] plans to return the [[Frankston railway line|Frankston line]] to the [[City Loop]], with dedicated use of the Caulfield group tunnel track.<ref name=":6">{{Cite web |last=Planning |first=Department of Transport and Planning |title=Transport strategies and plans |url=https://dtp.vic.gov.au/about/planning/transport-strategies-and-plans |access-date=7 February 2023 |website=dtp.vic.gov.au |language=en-au |archive-date=12 February 2023 |archive-url=https://web.archive.org/web/20230212093612/https://dtp.vic.gov.au/about/planning/transport-strategies-and-plans |url-status=live }}</ref> This will mean Frankston line trains will no longer through-run with Werribee and Williamstown line trains, and will again stop at City Loop stations [[Flagstaff railway station|Flagstaff]], [[Melbourne Central railway station|Melbourne Central]] and [[Parliament railway station|Parliament]].<ref name=":6" /> As part of the reconfiguration, the Sandringham line would instead begin through-running services to [[Werribee line|Werribee]] and [[Williamstown line|Williamstown]] lines for the first time.<ref name=":6" /> Stage 4 of the [[Network Development Plan β Metropolitan Rail]] proposed that the [[Upfield railway line|Upfield]] and Sandringham lines be joined via a reconfigured City Loop sometime in the 2030s.<ref>{{Cite web |title=Growing Our Rail Network 2018β2025 |url=https://www.ptv.vic.gov.au/footer/legal-and-policies/growing-our-rail-network-2018-2025/ |access-date=8 February 2023 |website=Public Transport Victoria |language=en-GB |archive-date=12 August 2019 |archive-url=https://web.archive.org/web/20190812025052/https://www.ptv.vic.gov.au/footer/legal-and-policies/growing-our-rail-network-2018-2025/ |url-status=live }}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)