Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Unity Temple
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==== Design changes ==== [[File:Unity Temple - Oak Park IL 16 (3224994948).jpg|thumb|The auditorium's skylights]] In December 1905, the planning committee received Wright's plans and recommended that the board of trustees approve them.<ref name="Siry p. 74" /><ref name="Sokol p. 39" /> The same month, Gale gave the congregation a {{Convert|20|ft|4=-wide|adj=mid}} strip of land on Kenilworth Avenue.<ref>{{harvnb|Siry|1996|ps=.|page=80 }}</ref> By the beginning of 1906, the site of the original building had been sold for $6,500.<ref name="Sokol p. 45" />{{Efn-ur|Equivalent to ${{inflation|start_year=1905|index=US-GDP|value=6500|r=-3|fmt=c}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP|group=lower-alpha}}}} The congregation decided to proceed with construction, even though it had received only one bid for the general contract, which exceeded the church's budget by $8β10 thousand.<ref name="Sokol p. 45">{{harvnb|Sokol|2008|ps=.|page=45 }}</ref><ref>{{harvnb|Siry|1996|ps=.|page=127 }}</ref>{{Efn-ur|Equivalent to ${{inflation|start_year=1905|index=US-GDP|value=8|r=0|fmt=c}}β{{inflation|start_year=1905|index=US-GDP|value=10|r=0|fmt=c}} thousand in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP|group=lower-alpha}}}} Thomas Skillin, who led the board of trustees, reported that the temple was to cost $40,000 but that there was only $31,000 available.<ref name="Sokol p. 47">{{harvnb|Sokol|2008|ps=.|page=47 }}</ref><ref>{{harvnb|Siry|1996|ps=.|pages=127β128 }}</ref>{{Efn-ur|The cost was equivalent to ${{inflation|start_year=1905|index=US-GDP|value=40000|r=-3|fmt=c}}, while the money on hand was equivalent to ${{inflation|start_year=1905|index=US-GDP|value=31000|r=-3|fmt=c}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP|group=lower-alpha}}}} The trustees considered modifying the plans, splitting work into two phases, or borrowing money.<ref name="Sokol p. 47" /> Wright offered to reduce the cost to $35,000{{Efn-ur|Equivalent to ${{inflation|start_year=1905|index=US-GDP|value=35000|r=-3|fmt=c}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP|group=lower-alpha}}}} by revising the plans and deferring installation of the furnishings.<ref name="Siry p. 128">{{harvnb|Siry|1996|ps=.|page=128 }}</ref><ref>{{harvnb|Sokol|2008|ps=.|page=51 }}</ref> Skillin objected that the auditorium was too small and dark.<ref name="Cypret 1975b">{{Cite news |last=Cypret |first=Randy |date=July 24, 1975 |title=Unity designed to solve problems |via=newspapers.com |url=https://www.newspapers.com/article/news-journal-unity-designed-to-solve-pro/164860702/ |access-date=February 6, 2025 |work=News Journal |pages=33 }}</ref><ref name="Siry p. 128; Sokol p. 52" /> At its meeting on January 18, 1906, the board asked Skillin and Johonnot to discuss possible modifications with Wright.<ref name="Siry p. 128; Sokol p. 52">{{harvnb|Siry|1996|ps=|page=128}}; {{harvnb|Sokol|2008|ps=.|page=52 }}</ref> Subsequently, Wright revised the auditorium's design,<ref name="Siry pp. 129β130; Sokol pp. 52β54">{{harvnb|Siry|1996|ps=|pages=129β130}}; {{harvnb|Sokol|2008|ps=.|pages=52β54 }}</ref> and he invited 75 members of the congregation to see the drawings and models for Unity Temple at his studio.<ref name="Siry p. 128" /><ref name="Oak Leaves 19910807">{{cite web |last=Guarino |first=Jean |date=August 7, 1991 |title=Wright community never materialized |url=https://riverforest.advantage-preservation.com/viewer/?i=f&d=01011991-12311992&e=unity%20temple&m=between&ord=e1&fn=forest_leaves_usa_illinois_oak_park_19910807_english_81&df=11&dt=20 |access-date=February 7, 2025 |work=Oak Leaves |page=81 }}</ref> The board approved Wright's revisions on February 7,<ref name="McCarter2 p. 10" /><ref name="Siry pp. 129β130; Sokol pp. 52β54" /> on the condition that no more than $36,200 be spent.<ref name="Siry pp. 129β130; Sokol pp. 52β54" />{{Efn-ur|Equivalent to ${{inflation|start_year=1905|index=US-GDP|value=36200|r=-3|fmt=c}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP|group=lower-alpha}}}} Details of the design were reported in the local media on February 24,<ref>{{harvnb|Siry|1996|ps=|page=130}}; {{harvnb|Sokol|2008|ps=.|page=55 }}</ref> and a brochure describing the final plan was published on March 4.<ref>{{harvnb|Sokol|2008|ps=.|page=56 }}</ref> Wright's assistant [[Charles E. White Jr.]] said the planning process had been marked by "endless fighting".<ref name="Siry p. 130">{{harvnb|Siry|1996|ps=.|page=130 }}</ref><ref name="Schrenk p. 151">{{harvnb|Schrenk|2021|ps=.|page=151 }}</ref> Wright continued refining the design details even after the final plans were accepted and (in some cases) partially completed.<ref name="Siry p. 137">{{harvnb|Siry|1996|ps=.|page=137 }}</ref> Despite initial objections to Wright's design, Oak Park residents eventually came to like it.<ref name="Oak Leaves 19910807" />
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)