Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Batong line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==History== ===Phase 1=== Construction of the Batong Line began on December 28, 2001, and the line opened on December 27, 2003. In 2012, traffic on Batong Line was relieved by the opening of the parallel [[Line 6, Beijing Subway|Line 6]], with a 12.14% decrease in daily ridership and a 10–20% reduction in flow during rush hour.<ref name="ridership">{{cite news|url=http://www.bjjtw.gov.cn/gzdt/ywsds/201302/t20130207_71407.htm |script-title=zh:我市轨道交通网络化运营效果凸显|date=2013-02-07|access-date=2013-09-15|publisher=北京市交通委员会 [Beijing Municipal Transportation Committee] |url-status=dead|archive-url=https://web.archive.org/web/20140109144501/http://www.bjjtw.gov.cn/gzdt/ywsds/201302/t20130207_71407.htm|archive-date=2014-01-09}}</ref> However, during peak hours sections the line still operates above 100% capacity.<ref name = "ridership"/> ===Southern extension (Phase 2)=== There are 2 stations on the southern extension: {{stl|BJS|Huazhuang}} station and {{stl|BJS|Universal Resort}} station (both are transfer stations with the eastern extension of [[Line 7 (Beijing Subway)|Line 7]]).<ref>{{cite web |url=http://www.xinhuanet.com/local/2018-12/15/c_1123856864.htm |archive-url=https://web.archive.org/web/20181215133330/http://www.xinhuanet.com/local/2018-12/15/c_1123856864.htm |url-status=dead |archive-date=December 15, 2018 |title = 北京地铁八通线南延、7号线东延2019年年底通车试运营-新华网}}</ref> The extension is 4.5 km in length,<ref name=bj2019length>{{cite web|url=http://www.bjnews.com.cn/feature/2019/09/10/624954.html|title=地铁7号线东延、八通线南延今日试运行 年底开通|date=2019-09-10}}</ref> including 3.8 km underground section.<ref name=bj20181215>{{cite web |url=http://bj.people.com.cn/n2/2018/1215/c82840-32413471.html |url-status=dead |archive-url=https://web.archive.org/web/20190424000342/http://bj.people.com.cn/n2/2018/1215/c82840-32413471.html |archive-date=2019-04-24 |title=ͨ ʩվ ⶥ ͨ 7 ߶ ͨ-- Ƶ -- }}</ref> {{stl|BJS|Huazhuang}} station was opened on December 28, 2019.<ref name=bjd-1/> {{stl|BJS|Universal Resort}} station opened on August 26, 2021.<ref name=U>{{cite web|url=http://www.nbd.com.cn/articles/2021-08-25/1888609.html|date=2021-08-25|title=定了!北京环球度假区各交通站口明天同步开通|archive-url=https://archive.today/20210825101845/http://www.nbd.com.cn/articles/2021-08-25/1888609.html|archive-date=2021-08-25|access-date=2021-08-25|url-status=live}}</ref> ===Opening timeline=== {| class="wikitable" style="border-collapse: collapse; text-align: right;" !Segment!!Commencement!!Length!!Station(s)!!Name |- |style="text-align: left;"| Sihui — Tuqiao | 27 December 2003 | {{convert|18.964|km|mi|1|abbr=on}}<ref>{{cite web|url=http://news.sina.com.cn/o/2003-05-29/2023169473s.shtml|date=2003-05-29|title=北京地铁八通线轨道全线贯通 仍将确保年底通车}}</ref> | 13 |style="text-align: left;"| Phase 1 |- |style="text-align: left;"| Tuqiao — Huazhuang | 28 December 2019<ref name=bjd-1>{{cite web|url=http://bjwb.bjd.com.cn/html/2019-12/25/content_12438029.htm|title=7号线东延八通线南延本周六开通试运营 运营时间保持不变 环球度假区站暂不开通|date=2019-12-25|access-date=2019-12-25|archive-date=2019-12-25|archive-url=https://web.archive.org/web/20191225161944/http://bjwb.bjd.com.cn/html/2019-12/25/content_12438029.htm|url-status=dead}}</ref> |rowspan="2"|{{convert|4.5|km|mi|abbr=on}}<ref name=bj2019length /> | 1 |rowspan="2" style="text-align: left;"| Phase 2<br>(Southern extension) |- |style="text-align: left;"| Huazhuang — Universal Resort | 26 August 2021<ref name=U /> | 1 |} ===Through operations with Line 1=== [[File:01 024 at Chajiafen (20210523031941).jpg|thumb|A DKZ4 train of Line 1 near Communication Univ. of China station during the stress testing on 23 May 2021]] In 2010, a CPPCC member Chen Dingwang, proposed that services on [[Line 1 (Beijing Subway)|Line 1]] and the Batong Line should directly link, with [[Through train|through operations]], reducing travel times and removing the unnecessary forced transfers at {{stl|BJS|Si Hui Dong(E)}} or {{stl|BJS|Si Hui}}.<ref>{{cite web |url=http://www.china.com.cn/economic/txt/2011-09/16/content_23426447.htm |script-title=zh:北京地铁八通线一号线有望贯通 |publisher=中国网 |date=2011-09-16}}</ref> However, the [[Beijing Subway]] responded that Line 1's and Batong's [[Railway signalling|signal]] systems are completely different, so through-operation will be more difficult to achieve from an engineering standpoint. As of 2016, preliminary design and feasibility studies are underway to allow for through operations between Line 1 and Batong.<ref>{{Cite web|url=http://finance.qianlong.com/2016/1114/1109977.shtml |script-title=zh:北京八通线南延工程初步设计顺利通过评审-千龙网·中国首都网|website=finance.qianlong.com|access-date=2016-11-17}}</ref> On June 12, 2020, the project of the through operation of Line 1 and Batong line was approved by Beijing Development and Reform Commission.<ref>{{cite web|url=http://fgw.beijing.gov.cn/fgwzwgk/ysqzzdgk/202006/t20200612_1923647.htm|title=关于轨道交通1号线与八通线贯通运营工程项目建议书(代可行性研究报告)的批复|work=Beijing Development and Reform Commission|date=2020-06-12|access-date=2020-06-19}}</ref> [[Through operation]] with [[Line 1 (Beijing Subway)|Line 1]] started on 29 August 2021.<ref name=bjd20210825>{{cite news|url=https://news.bjd.com.cn/2021/08/25/159146t100.html|title=四惠四惠东站无须换乘了!北京地铁1号线、八通线本周日跨线运营|work=[[Beijing Daily]]|date=2021-08-25|accessdate=2021-08-25|archive-url=https://web.archive.org/web/20210825092946/https://news.bjd.com.cn/2021/08/25/159146t100.html|archive-date=2021-08-25}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)