Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
CTrain
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Downtown Transit Mall === As part of the construction of the original South leg, nine single-platform stations were built along the 7th Avenue South transit mall, which formed the 7th Avenue [[Free public transport|free fare zone]]. All nine stations opened May 25, 1981. The tracks run at grade in a semi-exclusive right of way, shared with buses, city and emergency vehicles. This is a free-fare zone intended to act as a downtown people mover. Fares are only required after trains exit the downtown core. Westbound stations used to consist of Olympic Plaza (formerly 1 Street E, renamed in 1987), 1 Street W, 4 Street W, and 7 Street W. Eastbound stations consisted of 8 Street W, 6 Street W, 3 Street W, Centre Street and City Hall (formerly 2 Street E, renamed in 1987). When the Northeast leg opened on April 27, 1985, two stations were added: 3 Street E serving Westbound Blue Line trains only and 10 Street W, a centre-loading platform, which served as the terminus of both Red and Blue lines, until the Northwest leg opened in 1987, after which it was the terminus for the Blue line only. As part of Calgary's refurbishment project,<ref>[http://www.calgary.ca/Transportation/TI/Pages/Transit-projects/7-Avenue-Refurbishment.aspx?redirect=/7avenue 7 Avenue calary.ca] {{webarchive|url=https://web.archive.org/web/20121214000405/http://www.calgary.ca/Transportation/TI/Pages/Transit-projects/7-Avenue-Refurbishment.aspx?redirect=%2F7avenue |date=December 14, 2012 }}</ref> 3 Street E and Olympic Plaza stations have been decommissioned and replaced by the new gateway<ref>[http://www.calgary.ca/CSPS/Recreation/Pages/Public-Art/Downtown-Gateway-LRT-Stations.aspx calgary.ca]</ref> City Hall station in 2011. 10 Street W was decommissioned and replaced with the Downtown West–Kerby (formerly called 11 Street W) station in 2012.<ref name="construction">{{cite web| url=http://www.calgary.ca/Transportation/TI/Documents/7-ave-lrt-refurbishment/7-ave-lrt-10st-closure.pdf| title=Closure of 10 Street west downtown station| work=[[Calgary City Council|The City of Calgary (website)]]| access-date=2012-08-28}}{{Dead link|date=June 2022 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> ==== Downtown station refurbishment ==== In June 2007, the City of Calgary released information on the schedule for the refurbishment of the remaining original downtown stations.<ref>{{cite web |last= Calgary Transportation Infrastructure |title= 7 Avenue Refurbishment |publisher= City of Calgary |year= 2007 |url= http://www.calgary.ca/portal/server.pt/gateway/PTARGS_0_2_395_203_0_47/http;/content.calgary.ca/CCA/City%20Hall/Business%20Units/Transportation%20Infrastructure/Construction%20Projects/LRT/7%20Avenue%20Refurbishment/7%20Avenue%20Refurbishment.htm |access-date= 2007-12-22 |url-status= dead |archive-url= https://web.archive.org/web/20070824010101/http://www.calgary.ca/portal/server.pt/gateway/PTARGS_0_2_395_203_0_47/http%3B/content.calgary.ca/CCA/City%2BHall/Business%2BUnits/Transportation%2BInfrastructure/Construction%2BProjects/LRT/7%2BAvenue%2BRefurbishment/7%2BAvenue%2BRefurbishment.htm |archive-date= August 24, 2007 |df= mdy-all }}</ref> The plan involved replacing and relocating most stations, and expanding Centre Street station which was relocated one block east (adjacent to the Telus Convention Centre) in 2000, to board four-car trains. The new stations have retained their existing names (with the exception of 10 Street W becoming Downtown West–Kerby in 2012); however, they may be shifted one block east or west, or to the opposite side of 7th Avenue. The refurbishment project was completed on December 8, 2012, when the [[Downtown West–Kerby station]] was opened to the public in conjunction with the West LRT opening event.<ref>[http://www.westlrt.ca/contentabout/openingevent.cfm West LRT Opening Event] {{webarchive|url=https://web.archive.org/web/20121116021108/http://www.westlrt.ca/contentabout/openingevent.cfm |date=November 16, 2012 }}</ref> *1 Street SW – new platform relocated one block east opened October 28, 2005. *7 Street SW – new platform relocated one block east opened February 27, 2009. *6 Street SW – reconstructed in original location. Original platform closed April 7, 2008 and new platform opened March 27, 2009. *8 Street SW – new platform relocated one block east opened December 18, 2009. *3 Street SW – reconstructed in original location. Original platform closed April 20, 2009 and new platform opened March 12, 2010. *[[3 Street Southeast station|3 Street SE]] – permanently closed May 3, 2010. Replaced by new dual-platform City Hall Station opening July 6, 2011. *4 Street SW – reconstructed in original location. Original platform closed January 7, 2010 and new platform opened January 21, 2011. *City Hall – original Eastbound platform rebuilt with new Westbound platform to replace 3 Street E and Olympic Plaza. Original platform closed May 3, 2010 and new dual-platform station opened July 6, 2011. Olympic Plaza was closed permanently at this time. Eastbound platform re-closed following the [[Calgary Stampede|2011 Stampede]] to finish construction and officially opened September 19, 2011. *Olympic Plaza – permanently closed July 6, 2011. Replaced by new dual-platform City Hall Station. *{{stl|CTrain|10 Street}} – permanently closed and removed on September 15, 2012.<ref name="construction" /><ref>{{cite web|url=http://www.calgarytransit.com/html/10_station_closure.html|title=10 Street CTrain Station Closure|access-date=2012-09-01|url-status=dead|archive-url=https://web.archive.org/web/20120904094828/http://www.calgarytransit.com/html/10_station_closure.html|archive-date=September 4, 2012|df=mdy-all}}</ref> The new station replacing it, which opened on December 8, 2012, has dual side-loading platforms and is located one block west. This project was initially proposed to be undertaken in 2006, following the opening of the new 1 Street W station. However, the City of Calgary decided to defer the project to coincide with the opening of the West Line and continue on with refurbishment of the other stations. This new station was initially called "11 Street W" up until the Summer of 2012 when it was renamed to Downtown West–Kerby.<ref>{{cite web| url=http://www.calgary.ca/Transportation/TI/Documents/7-ave-lrt-refurbishment/7-ave-phase2-project-update.pdf| title=7 AVENUE REFURBISHMENT PROJECT UPDATE: DOWNTOWN WEST-KERBY STATION| work=[[Calgary City Council|The City of Calgary (website)]]| access-date=2012-04-04}}{{dead link|date=June 2022 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> This required that the stations be closed during demolition and reconstruction. The new stations feature longer platforms for longer trains, better integration of the platforms into the sidewalk system, better lighting, and more attractive landscaping and street furniture. This project was shortlisted<ref>{{cite web|url=http://www.worldbuildingsdirectory.com/project.cfm?id=4289 |title=Transit Corridor Renewal (World Buildings Directory) |archive-url=https://archive.today/20130209134311/http://www.worldbuildingsdirectory.com/project.cfm?id=4289 |archive-date=February 9, 2013 }}</ref> for the New/Old category in the 2012 [[World Architecture Festival]] in [[Singapore]].<ref>[http://www.worldarchitecturefestival.com/ World Architecture Festival Website]</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)