Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Cambrian Line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===<span class="anchor" id="2018 Track Upgrades"></span>2018 track upgrades=== In 2018, [[Network Rail]] began upgrading {{Convert|3.7|mi}} of track at a cost of Β£7.5 million.<ref>{{cite web|title=Β£7.25m rail upgrade works begin on Cambrian line|url=https://www.bbc.com/news/uk-wales-mid-wales-42951691|website=BBC News|publisher=BBC|access-date=29 March 2018|date=5 February 2018}}</ref> As well as improving reliability by replacing track, [[Network Rail]] and [[Powys County Council]] installed over a mile of new road and two road over rail bridges at [[Ystrad Fawr]] and [[Rallt]]. This has closed eight level crossings and improved safety for local residents.<ref>{{Cite web |url=https://www.networkrail.co.uk/feeds/completion-of-7-5m-scheme-creates-a-safer-railway-for-mid-wales/ |archive-url=https://web.archive.org/web/20180625213906/https://www.networkrail.co.uk/feeds/completion-of-7-5m-scheme-creates-a-safer-railway-for-mid-wales/ |url-status=dead |title=Completion of Β£7.5m scheme creates a safer railway for mid Wales|website=Network Rail|access-date=30 January 2020 |archive-date=25 June 2018}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)