Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Difference engine
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Timing === In the Babbage design, one iteration (i.e. one full set of addition and [[Carry (arithmetic)|carry]] operations) happens for each rotation of the main shaft. Odd and even columns alternately perform an addition in one cycle. The sequence of operations for column <math>n</math> is thus:<ref name="edinburgh1834" /> # Count up, receiving the value from column <math>n+1</math> (Addition step) # Perform [[carry propagation]] on the counted up value # Count down to zero, adding to column <math>n-1</math> # Reset the counted-down value to its original value Steps 1,2,3,4 occur for every odd column, while steps 3,4,1,2 occur for every even column. While Babbage's original design placed the crank directly on the main shaft, it was later realized that the force required to crank the machine would have been too great for a human to handle comfortably. Therefore, the two models that were built incorporate a 4:1 reduction gear at the crank, and four revolutions of the crank are required to perform one full cycle.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)