Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Loading gauge
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====European standards==== [[File:Lademass EBO.png|thumb|Railway clearance G1 and G2 (Germany)]] In the [[European Union]], the UIC directives were supplanted by [[ERA Technical Specifications for Interoperability]] (TSI) of European Union in 2002, which has defined a number of recommendations to harmonize the train systems. The TSI Rolling Stock (2002/735/EC) has taken over the UIC Gauges definitions defining Kinematic Gauges with a reference profile such that Gauges GA and GB have a height of {{convert|4.35|m|ftin|abbr=on}} (they differ in shape) with Gauge GC rising to {{convert|4.70|m|ftin|abbr=on}} allowing for a width of {{convert|3.08|m|ftin|abbr=on}} of the flat roof.<ref>{{Cite web|url=http://data.europa.eu/eli/dec/2002/735/oj/eng|archive-url=https://web.archive.org/web/20151019001730/http://eur-lex.europa.eu/legal-content/EN/ALL/?uri=CELEX:32002D0735|url-status=dead|title=EUR-Lex - 32002D0735 - EN - EUR-Lex|archive-date=19 October 2015}}</ref> All cars must fall within an envelope of {{convert|3.15|m|ftin|abbr=on}} wide on a {{convert|250|m|ch ft|sigfig=3|lk=on|abbr=on}} radius curve. The [[TGV]]s, which are {{convert|2.9|m|ftin|abbr=on}} wide, fall within this limit. The designation of a GB+ loading gauge refers to the plan to create a pan-European freight network for [[Intermodal container|ISO containers]] and trailers with loaded ISO containers. These container trains (''[[Piggyback (transportation)#Rail|piggy-back]] trains'') fit into the B envelope with a flat top so that only minor changes are required for the widespread structures built to loading gauge B on continental Europe. A few structures on the British Isles were extended to fit with GB+ as well, where the first lines to be rebuilt start at the [[Channel Tunnel]].<ref name=MS>{{Cite web |url=http://myweb.tiscali.co.uk/gansg/2-track/02track3.htm |title=Track Gauge & Loading Gauge |author=Mike Smith |year=2003 |url-status=dead |archive-url=https://web.archive.org/web/20090812052709/http://myweb.tiscali.co.uk/gansg/2-track/02track3.htm |archive-date=12 August 2009 |access-date=18 May 2009 }}</ref> Owing to their historical legacies, many member states' railways do not conform to the TSI specification. For example, [[#Great Britain|Britain]]'s role at the forefront of railway development in the 19th century has condemned it to the small [[Structure gauge|infrastructure dimensions]] of that era. Conversely, the {{nobold|loading gauge}}s of countries that were satellites of the former Soviet Union are much larger than the TSI specification. Other than for GB+, they are not likely to be retrofitted, given the enormous cost and disruption that would be entailed.{{Citation needed|date=May 2022}} {| class="wikitable" ! colspan="2" | Loading gauge ! colspan="2" | Static reference profile ! colspan="2" | Kinematic reference profile ! rowspan="2" | Comments |- ! UIC and/or TSI<ref name='note506'>{{Cite web|url=http://www.uic.org/etf/codex/codex-detail.php?langue_fiche=E&codeFiche=506|title=Leaflet 506 – Rules governing application of the enlarged GA, GB, GB1, GB2, GC and GI3 gauges|access-date=27 May 2009|url-status=dead|archive-url=https://web.archive.org/web/20111007123000/http://www.uic.org/etf/codex/codex-detail.php?langue_fiche=E&codeFiche=506|archive-date=7 October 2011}}</ref><ref>{{Cite web | url = http://eur-lex.europa.eu/legal-content/EN/ALL/?uri=CELEX:02006D0861-20130124 | title = TSI CR WAG; 02006D0861-20130124; Annex C: Track interaction and gauging | access-date = 7 October 2015 | author = EUR-Lex | date = 28 July 2006| url-status = live | archive-url = https://web.archive.org/web/20151019001730/http://eur-lex.europa.eu/legal-content/EN/ALL/?uri=CELEX:02006D0861-20130124 | archive-date = 19 October 2015}}</ref> ! [[International Wagon Regulations|RIV]]<ref>{{Cite web | url = http://www.rail.dbschenker.de/rail-deutschland-de/products_services/additional_services/ladungssicherung/loading_guidelines_of_ss/loading_guidelines.html | title = Verladerichtlinien der DB Schenker Rail AG (UIC – Verladerichtlinien); Tafel 1 Sammlung der Lademasse | access-date = 6 October 2015 | date = 1 July 2014 | language = de | url-status = live | archive-url = https://web.archive.org/web/20151019001730/http://www.rail.dbschenker.de/rail-deutschland-de/products_services/additional_services/ladungssicherung/loading_guidelines_of_ss/loading_guidelines.html | archive-date = 19 October 2015}}</ref> ! Width ! Height ! Width ! Height |- | G1 / UIC 505-1 || T 1<sub>1</sub> | rowspan="6" align="center" | 3.150 m || align="center" | 4.280 m || rowspan="8" align="center" | 3.290 m || align="center" | 4.310 m | Static profile also known as [[Berne gauge]], PPI or OSJD 03-WM. |- | GA || T 1<sub>2</sub> | rowspan="4" align="center" | 4.320 m || rowspan="4" align="center" | 4.350 m | |- | GB || T 1<sub>3</sub> | |- | GB1 / GB+<ref>{{Cite web | url = http://www.gir-maralpin.org/TransptsDeplacemts/FerTransptCombine2S.pdf | title = Transport combiné et infrastructures ferroviaires; Compléments 1 – Terminologie – Chargements – Gabarits – Institutions | access-date = 29 September 2015 | author = Jacques Molinari | date = April 1999 | language = fr | url-status = dead | archive-url = https://web.archive.org/web/20160306163748/http://www.gir-maralpin.org/TransptsDeplacemts/FerTransptCombine2S.pdf | archive-date = 6 March 2016 }}</ref> || | |- | GB2 || | |- | G2 || T 1<sub>4</sub> | align="center" | 4.650 m || rowspan="2" align="center" | 4.680 m | Formerly UIC C; Static profile also known as OSJD 02-WM. |- | DE3 || | colspan="2" align="center" | not defined | Expansion for G2, part of [[Trans-European Rail network|TEN-T]] regulations. |- | GC || | align="center" | 3.150 m || align="center" | 4.650 m || align="center" | 4.700 m | Formerly UIC C1. |- | C || | align="center" | 3.600 m || align="center" | 4.830 m || colspan="2" align="center" | not defined | High-capacity rail corridor standard for [[Øresund Bridge]] and [[Fehmarn Belt Tunnel]]<ref>{{cite journal |last1=Boysen |first1=Hans E. |title=Øresund and Fehmarnbelt high-capacity rail corridor standards updated |journal=Journal of Rail Transport Planning & Management |date=December 2014 |volume=4 |issue=3 |pages=44–58 |doi=10.1016/j.jrtpm.2014.09.001 |doi-access=free }}</ref> |}
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)