Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Red Line (CTA)
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==History== {{Howard-Englewood-Jackson Park}} {{maplink |frame=y |frame-width=250 |frame-height=200 |from=Howard–Englewood–Jackson Park Line.map |text=The Howard–Englewood–Jackson Park Line highlighted in gray}} The oldest section of the line opened on May 31, 1900, running from the Loop to Wilson.<ref>{{cite news |title=Room For All to Ride |newspaper=Chicago Daily Tribune |date=May 30, 1900 |page=12}}</ref> It was constructed by the [[Northwestern Elevated Railroad]]. The route was extended to [[Central station (CTA Purple Line)|Central Street]] in [[Evanston, Illinois|Evanston]] on May 16, 1908, via leased and electrified trackage belonging to the [[Chicago, Milwaukee and St. Paul Railway]]. In November 1913, the North Side "L" was through routed with the South Side "L" lines through the Loop. The ground-level section between Leland Avenue and Howard Street was elevated on a concrete embankment structure and widened to four tracks in 1922. The State Street subway opened on October 17, 1943, providing two new tracks bypassing the Loop tracks and the portion of the North and South Side "L" lines not equipped with express tracks. By providing an express route free of the most restrictive curves on the [[Chicago "L"]] and shorter than the old line it supplemented, the subway reduced running time by as much as eleven minutes for a one-way trip. The route was placed in operation on October 17, 1943,<ref>{{cite news |title=Chicago Underground – A Subway at Last! |first=William |last=Shinnick |newspaper=Chicago Daily Tribune |date=October 17, 1943 |page=C1 }}</ref> for a portion of the through north–south trains, although other trains continued to use the "L" both on through trips and on services circling the Loop and returning to the point of origin. In August 1949, the North–South route was revised to create a more efficient routing through the [[Central Business District]] and handle the heavy volumes of passenger traffic using it.<ref>{{cite news |title=Close 24 Elevated Stations; Skip-Stop Will Start Monday |newspaper=Chicago Daily Tribune |date=July 31, 1949 |page=1}}</ref><ref>{{cite news |title=Begins Skip-Stop Runs Monday on North, South "L" |newspaper=Chicago Daily Tribune |date=July 29, 1949 |page=A9 }}</ref> The Howard branch was paired with the Englewood and Jackson Park branches through the State Street subway, using the 13th Street portal and the other lines routed to the Loop "L". The [[Dan Ryan branch (CTA)|Dan Ryan Branch]] opened in September 1969, and was paired with the Lake Street branch to form the [[Lake–Dan Ryan Line|West-South route]], almost universally referred to as the Lake–Dan Ryan route.<ref>{{cite news |title=Ryan Rail Service Starts Today |first=Thomas |last=Buck |newspaper=Chicago Daily Tribune |date=September 28, 1969 |page=22}}</ref> It operated over the Lake Street and Wabash Avenue sides of the Union Loop. This "interim" service was created mainly for the purpose of providing through service between the west side and the south side in anticipation of the 1968 [[Chicago Central Area Transit Plan|Loop Subway Project]]. When the controversial [[rapid transit|subway]] project was cancelled in 1979, the Lake-Dan Ryan service remained and lasted for 24 years. For much of the 20th century, the '''Howard–Englewood/Jackson Park route''' was equally compatible in terms of passenger service until the late 1960s through the 1970s. However, passenger traffic volumes began to shift on the south side lines, with more riders using the newer Dan Ryan line (which runs four miles (6 km) further south) and fewer riders on the older "L" lines. This level of ridership allowed the CTA to develop a more efficient system by combining the more heavily used rail lines together and combining the other lines together, providing increased service capacity for the routes that need it. The Red Line was created in 1993, when the [[Chicago Transit Authority|CTA]] adopted color-coded system for all of its "L" routes. In February 1993, a new connection opened from the State Street subway south of Roosevelt to Cermak–Chinatown. The Howard branch was paired with the Dan Ryan branch creating the current '''Red Line''' and the Lake Street branch was paired with the Englewood and Jackson Park branches to form the '''Green Line'''. A further operational benefit of this switch was that this freed up capacity in the Loop needed for the addition of the [[Orange Line (CTA)|Orange Line]] to [[Midway International Airport|Midway Airport]]. The former tracks used to move West-South trains from the Loop to the Dan Ryan line are still retained for non-revenue moves and service disruptions. The [[Dan Ryan branch (CTA)|Dan Ryan Branch]] of the Red Line underwent a rehabilitation period to improve its aging infrastructure which ended in early 2007.<ref>{{Cite web |date=March 14, 2006 |title=Dan Ryan Red Line Rehabilitation Project |url=http://www.transitchicago.com/news/motion/red/danryan/index.html |archive-url=https://web.archive.org/web/20060314083240/http://www.transitchicago.com/news/motion/red/danryan/index.html |archive-date=March 14, 2006 |website=Chicago Transit Authority}}</ref> This work included upgrading the power and signal systems, and rehabilitating the stations with improved lighting, a cleaner appearance, and new escalators and elevators. The CTA has plans to expand Red Line service to ten car trains from the current eight-car trains.<ref>{{Citation |title=Chicago Transit Authority Ravenswood (Brown) Line Expansion Environmental Assessment and Section 4(f) Analysis |url=http://www.yourcta.com/news/newspostdescs/123139env.pdf |archive-url=https://web.archive.org/web/20060318112140/http://www.yourcta.com/news/newspostdescs/123139env.pdf |publisher=Chicago Transit Authority |archive-date=March 18, 2006}}</ref> ===Red Ahead rehabilitation=== {{main|Red Ahead}} In spring 2012, the CTA started a station and track rehabilitation program dubbed "Red Ahead",<ref name=" redahead">{{Cite web |title=CTA Red Ahead Program |url=http://www.transitchicago.com/redahead/ |access-date=August 18, 2012 |website=Chicago Transit Authority}}</ref> beginning on the North Side Main Line, which is called the "Red North" project.<ref>{{Cite web |title=Red Ahead: CTA Red North |url=http://www.transitchicago.com/rednorth/ |access-date=August 18, 2012 |website=Chicago Transit Authority}}</ref> The program monitors the full route of the Red Line, excluding the Loyola, Bryn Mawr, Sheridan, or Wilson station.<ref>{{cite web|title=Red North – Section 2|url=http://www.transitchicago.com/rednorth/#sheridan-brynmawr-loyola|publisher=Chicago Transit Authority|access-date=August 18, 2012}}</ref> This also does not include stations between Wilson through Fullerton, nor the State Street subway. In May 2012, the CTA started to work on the North Side Main Line stations of the Red Line which includes Jarvis, Morse, Granville, Thorndale, Berwyn, Argyle and Lawrence. The stations are listed in order, starting at Granville, then Morse, Thorndale, Argyle, Berwyn, Lawrence and finally Jarvis. This project started in June 2012 and was completed in December 2012. This project is also part of the Red Ahead's "Red & Purple Modernization" Project.<ref>{{Cite web |title=CTA Red & Purple Modernization project |url=http://www.transitchicago.com/rpmproject/ |access-date=August 18, 2012 |website=Chicago Transit Authority}}</ref> The Red & Purple Modernization Project will include a redesign of a [[level junction|diamond junction]] north of Belmont Station into a [[flying junction|flyover]] for Brown Line trains. This project will decrease train backups and increase the number of trains that can cross the junction per hour.<ref>{{Citation |title=Red and Purple Modernization: Rebuilding Vital Infrastructure For Chicago's Future |date=April 23, 2015 |url=http://www.transitchicago.com/assets/1/rpmproject/2015-04-23_15sw036_RPM_One_Sheet.pdf |df=mdy-all |archive-url=https://web.archive.org/web/20180124163242/http://www.transitchicago.com/assets/1/rpmproject/2015-04-23_15sw036_RPM_One_Sheet.pdf |publisher=Chicago Transit Authority |access-date=January 19, 2018 |archive-date=January 24, 2018 |url-status=dead}}</ref> The project was criticized by 2015 mayoral candidate [[Chuy García]] and local residents in the [[Lakeview, Chicago|Lakeview]] neighborhood who organized a referendum to stop it.<ref>{{Cite news |last=Swartz |first=Tracy |date=March 2, 2015 |title=Chicago Mayoral Candidates Sound off on Transit Priorities |work=Chicago Tribune |url=http://www.chicagotribune.com/news/columnists/redeye-chicago-mayoral-candidates-on-transit-20150302-story.html |access-date=January 19, 2018}}</ref><ref>{{Cite news |last=Swartz |first=Tracy |date=November 6, 2014 |title=Lakeview Residents Vote: CTA Hasn't 'Sufficiently Justified' Belmont Flyover |work=Chicago Tribune |url=http://www.chicagotribune.com/news/local/breaking/redeye-chicagoans-vote-on-cta-belmont-flyover-referendum-20141104-story.html |access-date=January 19, 2018}}</ref> The [[Federal Transit Administration]] passed the CTA's environmental review on the flyover in January 2016 and received a $1.1 billion federal grant the following year.<ref>{{Cite news |last=Greenfield |first=John |date=January 26, 2016 |title=The Controversial Belmont Flyover Has Federal Approval—But Still Faces Other Hurdles |work=Chicago Reader |url=https://www.chicagoreader.com/chicago/belmont-flyover-controversy-cta-modernization/Content?oid=21007763 |access-date=January 19, 2018}}</ref><ref>{{Cite news |last=Dudek |first=Mitch |date=January 9, 2017 |title=Obama Sends CTA $1.1 Billion for Red Line Improvements |work=Chicago Sun-Times |url=https://chicago.suntimes.com/chicago-politics/obama-sends-cta-1-1-billion-for-red-line-improvements/ |access-date=January 19, 2018 |archive-date=January 20, 2018 |archive-url=https://web.archive.org/web/20180120070914/https://chicago.suntimes.com/chicago-politics/obama-sends-cta-1-1-billion-for-red-line-improvements/ |url-status=dead }}</ref> 16 properties affected by the flyover were demolished. Construction began on October 2, 2019,<ref>{{Cite web |date=August 1, 2019 |title=Chicago Transit Authority Announces Construction of Red and Purple Modernization Project Begins This Fall |url=https://www.masstransitmag.com/rail/infracture/press-release/21091009/chicago-transit-authority-cta-chicago-transit-authority-announces-construction-of-red-and-purple-modernization-project-begins-this-fall/ |website=www.masstransitmag.com}}</ref><ref>{{Cite news |date=October 2, 2019 |title=Work Begins On CTA's $2 Billion Red & Purple Modernization Project |work=CBS Chicago |url=https://chicago.cbslocal.com/2019/10/02/cta-red-purple-line-modernization-brown-line-bypass-flyover/}}</ref><ref>{{Cite news |last=McAdams |first=Alexis |date=October 2, 2019 |title=Officials Break Ground on CTA Red, Purple Modernization Project |work=ABC7 Chicago |url=https://abc7chicago.com/5584601/}}</ref> and the flyover entered service on November 19, 2021.<ref>{{cite web |title=CTA's new Brown Line flyover near Belmont to open to the public |work=Chicago Tribune |date=November 19, 2021 |url=https://www.chicagotribune.com/business/ct-biz-red-purple-belmont-bypass-flyover-20211118-wlpv6jniobctnjjpmet7hwobdi-story.html}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)