Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Sutton Bridge
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Port Sutton Bridge== {{Infobox UK legislation | short_title = Sutton Bridge Dock Act 1875 | type = Act | parliament = Parliament of the United Kingdom | long_title = | year = 1875 | citation = [[38 & 39 Vict.]] c. ccvii | introduced_commons = | introduced_lords = | territorial_extent = | royal_assent = | commencement = | expiry_date = | repeal_date = | amends = | replaces = | amendments = | repealing_legislation = | related_legislation = | status = | legislation_history = | theyworkforyou = | millbankhansard = | original_text = | revised_text = | use_new_UK-LEG = | UK-LEG_title = | collapsed = yes }} [[File:Port Sutton Bridge - geograph.org.uk - 75579.jpg|thumb|right|Port Sutton Bridge]] The '''{{visible anchor|Sutton Bridge Dock Act 1875}}''' ([[38 & 39 Vict.]] c. ccvii) authorised the construction of the dock and other necessary works, including connecting the dock to the existing railway. The wet dock was to be some {{convert|475|yd}} by {{convert|140|yd}} with a lock from the river of {{convert|200|by|50|ft|m}}. The length of the quayside was to be {{convert|1250|yd}} with a long timber jetty on the east side. On the west side was to be a coal jetty, equipped with a hydraulic lift to raise coal trucks to tip their loads into ships waiting beneath. The dock gates weighed 35 tons each and 1.5 million bricks were used in constructing the dock entrance. An area of {{convert|13|acre|ha}} was taken up by the dock itself and {{convert|600000|cuyd|m3}} of soil were excavated. The first sod was cut on 1 January 1878 and 100 men, 50 horses and carts, 1 steam dredger and several barges were involved in the work. The work was completed and the first ship to enter the dock (SS ''Garland'') did so on 14 May 1881, carrying 1200 tons of cargo destined for Messrs English of Wisbech. The excitement was spoilt somewhat as the dock entrance had not been dredged to a sufficient depth and the ship had to unload some of her cargo before entering the dock. However, towed by the tugs, ''Pendennis'' and ''the Isle of Ely'', she floated into the dock. In the following week, four other ships used the dock. The official opening was planned for 29 June with great public festivities, however on 9 June part of the ground at the south west corner of the lock sank {{convert|10|ft|m}}, leaving the concrete facing unsupported. At the same time, a strip of earth at the back of the lock on the north side sank, carrying with it, two steam [[traction engine]]s which had been used for pumping. They were buried {{convert|10|ft|m}} deep in the silt. Frantic efforts were made to repair the damage. Trainloads of sand, silt, rubble, clay and limestone were poured into the gaps to no avail. On the following Tuesday {{convert|500|ft|m}} of concrete facing on the opposite, west side of the dock itself were dislodged because the footings had been scoured away. On Wednesday, many more yards of the concrete cracked and subsided. All three ships which had been in the dock had got away safely with some difficulty. The great weight of concrete laid on shifting silt, together with inadequate [[timber piling]] would appear to have led to the collapse. Efforts to save the dock were soon seen to be futile and the plan was abandoned. The railway company lost a fortune and Sutton Bridge's growth as a port was halted for over 100 years. Sutton Bridge Golf Club, established in 1914, is a nine-hole golf course in and around the abandoned dock basin.<ref>{{cite web |title=Sutton Bridge Golf Club |url=http://www.club-noticeboard.co.uk/suttonbridge/ |access-date=5 June 2018}}</ref> The concrete walls of the dock, some 15 feet high, form part of the course. The modern Port Sutton Bridge opened in 1987.<ref>{{Cite web | url=http://www.maib.gov.uk/cms_resources.cfm?file=/lagik.pdf | title=Report on the investigation of the grounding of Lagik at Port Sutton Bridge | website=www.maib.gov.uk | date=2000-12-13}}</ref> It is a 62-acre dry cargo port and warehouse complex. The port provides a 350 metre long wharf accommodating between four and five vessels, with a maximum vessel length of 120 metres and 17 metre beam. Vessels up to 5,000 DWT, with a draught of 6 metres can be accommodated at spring tide.<ref>{{Cite web|url=http://ports.org.uk/port.asp?id=54|title=Ports.org.uk / Sutton Bridge|website=ports.org.uk}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)