Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Energy development
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==== Costs ==== Costs are likely to go up for currently operating and new nuclear power plants, due to increased requirements for on-site spent fuel management and elevated design basis threats.<ref name="Massachusetts Institute of Technology 2011 xv">{{cite web |url=http://web.mit.edu/mitei/research/studies/documents/nuclear-fuel-cycle/The_Nuclear_Fuel_Cycle-all.pdf |title=The Future of the Nuclear Fuel Cycle |author=Massachusetts Institute of Technology |year=2011 |page=xv |url-status=live |archive-url=https://web.archive.org/web/20110601120150/http://web.mit.edu/mitei/research/studies/documents/nuclear-fuel-cycle/The_Nuclear_Fuel_Cycle-all.pdf |archive-date=2011-06-01 }}</ref> While first of their kind designs, such as the EPRs under construction are behind schedule and over-budget, of the seven South Korean [[APR-1400]]s presently under construction worldwide, two are in S.Korea at the [[Hanul Nuclear Power Plant]] and four are at the largest nuclear station construction project in the world as of 2016, in the [[United Arab Emirates]] at the planned [[Barakah nuclear power plant]]. The first reactor, Barakah-1 is 85% completed and on schedule for grid-connection during 2017.<ref>{{cite web|url=http://www.world-nuclear-news.org/NN-UAEs-fourth-power-reactor-under-construction-0209155.html|title=UAE's fourth power reactor under construction|website=www.world-nuclear-news.org|access-date=4 May 2018|url-status=live|archive-url=https://web.archive.org/web/20170916153535/http://www.world-nuclear-news.org/NN-UAEs-fourth-power-reactor-under-construction-0209155.html|archive-date=16 September 2017}}</ref><ref>{{cite web|url=http://www.fananews.com/en/uae/307075/|title=The Emirates Nuclear Energy Corporation ( ENEC ) provided a project update on the status of the UAE peaceful nuclear energy program|website=www.fananews.com|access-date=4 May 2018|url-status=dead|archive-url=https://web.archive.org/web/20161006125335/http://www.fananews.com/en/uae/307075/|archive-date=6 October 2016}}</ref> Two of the four [[European Pressurized Reactor|EPR]]s under construction (in [[Finland]] and France) are significantly behind schedule and substantially over cost.<ref name="Patel">{{cite news | url= https://www.bloomberg.com/news/2010-11-24/china-builds-french-designed-nuclear-reactor-for-40-less-areva-ceo-says.html | title= China Builds Nuclear Reactor for 40% Less Than Cost in France, Areva Says | first= Tara | last= Patel | author2= Francois de Beaupuy | date= 24 November 2010 | publisher= [[Bloomberg L.P.|Bloomberg]] | access-date= 2011-03-08 | url-status= live | archive-url= https://web.archive.org/web/20101128111033/http://www.bloomberg.com/news/2010-11-24/china-builds-french-designed-nuclear-reactor-for-40-less-areva-ceo-says.html | archive-date= 28 November 2010 }}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)