Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Golden Gate Bridge
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Torsional bracing retrofit=== On December 1, 1951, a windstorm revealed swaying and rolling instabilities of the bridge, resulting in its closure.<ref>{{cite news |last1=Van Niekerken |first1=Bill |title=When the Golden Gate Bridge was closed by a violent storm |url=https://www.sfchronicle.com/thetake/article/When-the-Golden-Gate-Bridge-was-closed-by-a-7971512.php |access-date=August 2, 2020 |date=June 13, 2016}}</ref> In 1953 and 1954, the bridge was retrofitted with lateral and diagonal bracing that connected the lower chords of the two side trusses. This bracing stiffened the bridge deck in torsion so that it would better resist the types of twisting that had destroyed the [[Tacoma Narrows Bridge (1940)|Tacoma Narrows Bridge]] in 1940.<ref>{{Cite web|url=https://goldengate.org/exhibits/bridge-deck-torsional-resistance-retrofit.php|title=Resisting the Twisting|website=Golden Gate Bridge Highway and Transportation District|access-date=July 29, 2019}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)