Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Iida Line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==History== {{Unreferenced section|date=September 2014}} The Toyokawa Railway opened the section from Toyohashi to Toyokawa in 1897, extending the line to Omi in 1900. At the northern end, the Ina Electric Railway opened the Tatsuno to Ina-Matsushima section (electrified at 1,200 V DC) in 1909, extending the line to Tenryukyo in sections between 1911 and 1927. The Horaitera Railway opened the Omi to Mikawa-Kawai section in 1923, and electrified it at 1,500 V DC in 1925 in conjunction with the electrification of the Toyohashi to Omi section the same year. The Toyohashi to Toyokawa section was double-tracked the following year. The Sanshin Railway opened the Tenryukyo to Kadoshima section as an electrified (1,500 V DC) line in 1932, the Mikawa-Kawai to Toei section (and all subsequent stages) as an electrified line in 1933, and connected the two sections (completing the line) in 1936. All four companies were nationalised in 1943. In 1955, the overhead line voltage of the Tatsuno to Tenryukyo section was increased to 1,500 V DC. CTC signalling was commissioned on the line between 1983 and 1984, and freight services ceased in 1996. ===Former connecting lines=== * Hon-Nagashino Station: A 23 km line to Mikawa-Taguchi, electrified at 1,500 V DC, opened between 1930 and 1932. Two 762mm gauge forest railways connected to this line: the Damine forest railway, which connected at the station of the same name, consisted of a 19 km 'main line' (including a tunnel) and a 7 km branch, operated between 1932 and 1960; the Taguchi forest railway connected at the terminus station, consisted of a 10 km 'main line' and a 6 km branch, operated between 1934 and 1963. Both forest railways were notable for initially employing people and "large dogs" to haul the empty wagons upgrade, which then rolled downhill when loaded. The Mikawa-Taguchi line closed following flood damage in 1968. ===Proposed connecting line=== * Chubu-Tenryu Station: Construction started on a 35 km line to Tenryu-Futamata on the [[Tenryu Hamanako Railroad Tenryu Hamanako Line|Hamanako Line]] in 1967. Proposed to involve 20 bridges and 14 tunnels, about 13 km of roadbed, and about 50% of the overall work had been completed when construction was abandoned in 1980.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)