Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interstate 985
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===1950sβ1970s=== Between 1955 and 1957, a freeway (presumably I-85) was under construction from northeast Atlanta northeast to Suwannee, paralleling US 23/SR 13.<ref name="GDOT 1955">{{Cite GDOT map |year=1955 |access-date=October 30, 2013 }}</ref><ref name="GDOT 1957">{{Cite GDOT map |year=1957 |access-date=October 30, 2013 }}</ref> Between 1957 and 1960, I-85 was completed as far north as what is now known as [[Georgia State Route 317|SR 317]], which is located just southwest of what is now the southern terminus of I-985/SR 365,<ref name="GDOT 1957"/><ref name="GDOT 1960">{{Cite GDOT map |year=1960 |access-date=October 30, 2013 }}</ref> and, by 1966, it was completed northeast of Atlanta within the state.<ref name="GDOT 1963">{{Cite GDOT map |year=1963 |access-date=October 30, 2013 }}</ref><ref name="GDOT 1966">{{Cite GDOT map |year=1966 |access-date=October 30, 2013 }}</ref> In 1966, SR 365 was being projected as a freeway from its current southern terminus northeast and curving around the southeastern side of Gainesville.<ref name="GDOT 1966"/><ref name="GDOT 1967">{{Cite GDOT map |year=1967 |access-date=October 30, 2013 }}</ref> In 1969, the whole freeway section, with the exception of the southernmost portion from I-85 to US 23/SR 20, was completed. Also, the entire completed section was designated as SR 365.<ref name="GDOT 1969">{{Cite GDOT map |year=1969 |access-date=October 30, 2013 }}</ref><ref name="GDOT 1970">{{Cite GDOT map |year=1970 |access-date=October 30, 2013 }}</ref> The next year, the southernmost segment was completed.<ref name="GDOT 1970"/><ref name="GDOT 1971">{{Cite GDOT map |year=1971 |access-date=October 30, 2013 }}</ref> By 1979, the SR 365 freeway was listed as "under construction" from the northern terminus of the freeway northeast to US 23/[[U.S. Route 441 in Georgia|US 441]]/[[Georgia State Route 15|SR 15]] near Cornelia.<ref name="GDOT 1977-1978">{{Cite GDOT map |year=1977 |access-date=October 30, 2013 }}</ref><ref name="GDOT 1979">{{Cite GDOT map |year=1979 |access-date=October 30, 2013 }}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)