Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Lucent Technologies
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Notable buildings === During its expansion in the late 1990s, Lucent commissioned several large office buildings.<ref>{{cite news |last1=Bigness |first1=Jon |title=Lucent Expansion Plans Bright |url=https://www.chicagotribune.com/news/ct-xpm-1997-10-14-9710140099-story.html |access-date=21 October 2023 |work=Chicago Tribune |agency=Tribune Staff Writer |date=14 October 1997 |language=En}}</ref> The architectural firm, Kevin Roche, John Dinkeloo, and Associates (KRJDA) designed five structures clad in energy-efficient, tinted, low-E glass. * '''Westminster''' – built between 1997 and 2001, the [[Westminster, Colorado]] building was a 480,000 ft² research and development facility for 1,350 employees. Its design is similar to the Lisle, Illinois building, with two four-story wings arranged with an entrance resembling a glass satellite dish. The building was an expansion to the existing Westminster building via pedestrian bridge.<ref>{{cite web |title=Lucent Technologies Westminster |url=https://www.krjda.com/projects/lucent-westminster |website=www.krjda.com/ |access-date=20 October 2023}}</ref> * '''Naperville''' – in 2000, the 600,000 ft² [[Naperville, Illinois]] five-story structure was completed for 2000 employees. It had a pedestrian bridge to the existing Indian Hill research and development building.<ref>{{cite web |title=Lucent Naperville |url=https://www.krjda.com/projects/lucent-naperville |website=www.krjda.com/projects |access-date=20 October 2023}}</ref> In April 2023, the building was sold for $4.8 million by Nokia to a developer and the new ownership began demolition in August 2023 of those structures formerly called 'Indian Hill New' by Lucent and Alcatel-Lucent.<ref>{{cite news |last1=Ecker |first1=Danny |title=Could these massive Naperville office campuses be turned into warehouses? |url=https://www.chicagobusiness.com/commercial-real-estate/developers-mull-warehouses-naperville-office-campuses |access-date=20 October 2023 |work=Crains Chicago Business |date=3 May 2023}}</ref> * '''Lisle''' – in 2001, the Network Software Center in [[Lisle, Illinois]] was also completed in a similar design of a five-story three building with wings and two parking garages. This research and development building was a 600,000 ft² glass building for 2,000 employees. A pedestrian bridge over an existing lake linked it to the Network Software Center, built in the 1970s.<ref>{{Cite web |title=Lucent Lisle |url=https://www.krjda.com/projects/lucent-lisle |access-date=21 October 2023 |website=Kevin Roche John Dinkeloo and Associates}}</ref> [[File:Nürnberg Nordostpark Alcatel-Lucent.jpg|thumb|right|Lucent Technologies Nuremberg building was an expansion to two existing buildings in Germany previously owned by Philips Kommunikations Industrie and acquired by AT&T Network Systems.]] * '''Nuremberg''' – completed in 2002, the [[Nuremberg]], Germany "serpentine" five-story building was a 215,000 ft² expansion for two existing buildings, with the same aesthetic design as the United States projects. It included a customer center and training area.<ref>{{Cite web |title=Lucent Nuremberg |url=https://www.krjda.com/projects/lucent-nuremberg |access-date=21 October 2023 |website=Kevin Roche John Dinkeloo and Associates}}</ref> * '''Agere Hanover''' – the last project was completed in 2002 in [[Hanover Township, Lehigh County, Pennsylvania|Hanover Township, Allentown, Pennsylvania]]. The project was called the Agere Systems Expansion, which was a three-story administration, research and development building for 2,000 employees with 560,000 ft² of space. These buildings also included parking garages with about 2,000 parking spaces.<ref>{{Cite web |title=Agere Systems Expansion |url=https://www.krjda.com/projects/agere-systems-expansion |access-date=21 October 2023 |website=Kevin Roche John Dinkeloo and Associates}}</ref> The new structures were planned in 1998 by Lucent Technologies, before [[Agere Systems|Agere]] was incorporated on August 1, 2000, and Agere was spun off by Lucent Technologies on June 1, 2002.<ref>{{cite web |date=October 10, 1998 |title=Lucent Announces Plans For $165 Million Complex |url=https://www.mcall.com/1998/10/10/lucent-announces-plans-for-165-million-complex-campus-in-hanover-twp-lehigh-county-to-attract-1625-jobs-the-most-in-recent-memory/ |access-date=21 October 2023 |website=mcall.com |publisher=The Morning Call}}</ref> Built at a cost of $165 million, it became the Agere world headquarters in 2003 with consolidation of offices, research and development operations from former AT&T/Lucent Technologies locations at Allentown, Breinigsville, and Muhlenberg.<ref>{{cite web |last1=Hsu |first1=Jin-Hsiao |title=The Highest and Best Use Assessment of an Adaptive Reuse Development A Former Agere Systems Campus Redevelopment Plan |url=https://dspace.mit.edu/bitstream/handle/1721.1/42039/228657371-MIT.pdf;sequence=2 |website=DSpace@MIT |publisher=Massachusetts Institute of Technology |access-date=20 October 2023 |page=13 |language=English}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)