Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Public Land Survey System
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Measurement=== Distances were always measured in chains and links, based on [[Edmund Gunter]]'s [[Chain (unit)|66-foot measuring chain]]. The chain β an actual metal chain β was made up of 100 links, each being {{convert|7.92|in}} long. Eighty chains constitute one U.S. survey mile (which differs from the international mile by a few millimeters). There were two chainmen, one at each end, who physically made the measurements, one of them typically also acting as "compassman" to establish the correct bearing at each chain placement. In forested areas, it was essential for rapid progress and accuracy that the lead chainman follow the correct bearing at all times, since no straightening of the chain was possible without backtracking around trees and re-measuring. It was also necessary to keep the chain level, since all surveying distances are based on the horizontal, not slope, distance. In steep terrain, this meant shortening the chain, raising one end of the chain relative to the other, or both. In areas where measuring by chain was not possible, such as extremely steep terrain or water obstructions, distances were calculated by [[triangulation]].
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)