Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Red Line (MBTA)
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Station renovations=== [[File:Wollaston station construction from Beale Street, August 2018.JPG|thumb|left|Reconstruction of {{bts|Wollaston}} in 2018]] A 1979 renovation of {{bts|Park Street}} added two elevators, making it the first [[accessible]] station on the Red Line.<ref>{{cite book |url=https://archive.org/details/annualreportmas1979mass_0 |title=1979 Annual Report |year=1979 |publisher=Massachusetts Bay Transportation Authority |page=[https://archive.org/details/annualreportmas1979mass_0/page/27 27] |via=Internet Archive}}</ref> In the early 1980s, the MBTA began extending platforms for six-car trains: {{bts|Ashmont}} and {{bts|Shawmut}} in 1981, {{bts|Charles/MGH}} in 1982, and {{bts|Fields Corner}} and {{bts|Savin Hill}} in the mid-1980s.<ref name=netransit /><ref>{{cite web |url=https://cdn.mbta.com/sites/default/files/fmcb-meeting-docs/2019/04-april/2019-04-29-fmcb-P-longfellow-contract.pdf |title=MBTA Contract No. B43PS02: Longfellow Approach Architecture and Engineering Services |date=April 29, 2019 |publisher=Massachusetts Bay Transportation Authority}}</ref> (The Northwest and South Shore extensions had been built for longer trains, while {{bts|JFK/UMass}} had been modified in 1970.)<ref name=netransit /> In the mid-1980s, the MBTA spent $80 million to extend the platforms of seven underground Red Line stations ({{bts|Central}}, {{bts|Kendall/MIT}}, Park Street, [[Downtown Crossing station|Washington]], {{bts|South Station Under}}, {{bts|Broadway}}, and {{bts|Andrew}}) and three Orange Line stations.<ref>{{cite book |url=https://archive.org/details/annualreportmas1985mass_0 |title=1985 Annual Report |year=1985 |publisher=Massachusetts Bay Transportation Authority |page=[https://archive.org/details/annualreportmas1985mass_0/page/13 13] |via=Internet Archive}}</ref> Six-car trains entered service on January 21, 1988.<ref name=netransit /> Central, Kendall/MIT, Park Street, and Downtown Crossing (renamed from Washington in 1987) were completed in 1988.<ref>{{cite book |url=https://archive.org/details/annualreportmas1987mass_0 |title=1985 Annual Report |year=1987 |publisher=Massachusetts Bay Transportation Authority |page=[https://archive.org/details/annualreportmas1987mass_0/page/19 19] |via=Internet Archive}}</ref> A major reconstruction of JFK/UMass added a platform for the Braintree branch, which opened on December 14, 1988.<ref name=chronicle /><ref name=netransit /> Renovations to Broadway were completed in October 1989.<ref name=chronicle/> {{bts|Quincy Adams}} and {{bts|Braintree}} were accessible by 1989, if not from their original construction.<ref name=2007doc>{{cite web |url=https://old.mbta.com/uploadedFiles/Accessibility/final%20report%20082407%20on%20CD.pdf |title=Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services: Final Report |publisher=Massachusetts Bay Transportation Authority |author=Tran Systems and Planners Collaborative |date=August 24, 2007}}</ref><ref name=bluebook1990>{{cite web |url=https://archive.org/details/ridershipservice990mass |edition=3 |title=Ridership and Service Statistics |date=November 1990 |pages=1β4 |publisher=Massachusetts Bay Transportation Authority |author=Operations Directorate Planning Division |via=Internet Archive}}</ref><ref name="netransit" /> South Station was completed around 1992, followed by Andrew in 1994.<ref>{{cite book |url=https://archive.org/stream/mbtaaccessguidet00mass#page/14/mode/2up |title=MBTA : ACCESS; The Guide to Accessible Services and Facilities |page=15 |date=June 1992 |publisher=Massachusetts Bay Transportation Authority |via=Internet Archive}}</ref><ref name=2007doc /><ref name=netransit /> The 1990 passage of the [[Americans with Disabilities Act]] spurred the renovation of additional stations. {{bts|Quincy Center}} was modified in 1991, followed by {{bts|North Quincy}} in 1998.<ref name=2007doc /><ref name=chronicle /> Charles/MGH was rebuilt from 2003 to 2007.<ref name=mbtaproject>{{cite web |archive-url=https://web.archive.org/web/20080406022956/http://www.mbta.com/about_the_mbta/t_projects/?id=982 |archive-date=April 6, 2008 |title=Charles MGH Renovation |publisher=Massachusetts Bay Transportation Authority |url=http://www.mbta.com/about_the_mbta/t_projects/?id=982}}</ref><ref name=opens>{{cite press release |url=https://www.mbta.com/news/2007-03-27/new-charlesmgh-station-opens |title=New Charles/MGH Station Opens |date=March 27, 2007 |publisher=Massachusetts Bay Transportation Authority}}</ref> The agency began design for the four Ashmont branch stations in 2001.<ref name=audit>{{cite report |title=Official Audit Report β Issued June 16, 2014: Massachusetts Bay Transportation Authority, For the period January 1, 2005 through December 31, 2012 |date=June 16, 2014 |url=https://www.mass.gov/files/documents/2016/08/ww/201305833a.pdf |publisher=Auditor of the Commonwealth}}</ref>{{rp|33}} Savin Hill was closed from May 2004 to July 31, 2005 for reconstruction.<ref name=netransit /> It was followed by the completion of the rebuilt Fields Corner station in 2008, the modified Shawmut in 2009, and the rebuilt Ashmont in 2011.<ref>{{cite web |url=https://blog.mass.gov/transportation/mbta/governor-patrick-celebrates-ashmont-station-completion/ |title=Governor Patrick Celebrates Ashmont Station Completion |date=October 21, 2011 |publisher=Massachusetts Department of Transportation |access-date=October 19, 2015 |archive-date=October 25, 2015 |archive-url=https://web.archive.org/web/20151025022129/http://blog.mass.gov/transportation/mbta/governor-patrick-celebrates-ashmont-station-completion/ |url-status=dead }}</ref><ref>{{cite press release |url=https://mbta.com/news/2008-09-23/governor-patrick-mayor-menino-celebrate-completion-fields-corner-station |title=Governor Patrick, Mayor Menino Celebrate Completion of Fields Corner Station |date=September 23, 2008 |publisher=Massachusetts Bay Transportation Authority}}</ref> The final Red Line station to be modified for accessibility was {{bts|Wollaston}}, which was closed from January 2018 to August 2019 for a complete reconstruction.<ref name=netransit /> {{clear left}}
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)