Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
U.S. Route 8
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Future == WisDOT has completed the environmental studies of bypasses of Barron and Cameron in Barron County. These bypasses would form a continuous expressway through the area. No funding has been identified to complete the projects.<ref name=US8FEIS>{{cite web |url = http://www.dot.wisconsin.gov/projects/d8/eis/ |title = US 8 Environmental Impact Statement |date = March 5, 2010 |publisher = Wisconsin Department of Transportation |author = Northwest Transportation Region |location = Superior |access-date = November 14, 2010 |archive-url = https://web.archive.org/web/20080511192205/http://www.dot.wisconsin.gov/projects/d8/eis/ |archive-date = May 11, 2008 }}</ref> The entire length of US 8 in the state has been classified as a North Country Corridor in the Connections 2030 Plan by the department.<ref name=C2030A1>{{cite book |author = Wisconsin Department of Transportation |chapter = Appendix A: Finding Your Way with the Connections 2030 Statewide System-Level Priority Corridors |chapter-url = http://wisconsindot.gov/Documents/projects/multimodal/conn2030/2030-a.pdf |title = Connections 2030: Statewide Long-Range Transportation Plan |location = Madison |publisher = Wisconsin Department of Transportation |page = A-2 |date = October 2009 |access-date = November 7, 2017 |archive-url = https://web.archive.org/web/20171031045002/http://wisconsindot.gov/Documents/projects/multimodal/conn2030/2030-a.pdf |archive-date = October 31, 2017 |url-status = live }}</ref> This designation marks the highway as a priority in "continued safety, enhanced mobility and efficiency" as well as "modernization to correct outdated infrastructure design".<ref name=C2030C1>{{cite book |author = Wisconsin Department of Transportation |chapter = Chapter 1: Introduction |chapter-url = http://wisconsindot.gov/Documents/projects/multimodal/conn2030/2030-1.pdf |title = Connections 2030: Statewide Long-Range Transportation Plan |location = Madison |publisher = Wisconsin Department of Transportation |pages = ((1-1, 1-2)) |date = October 2009 |access-date = November 7, 2017 |archive-url = https://web.archive.org/web/20171031051816/http://wisconsindot.gov/Documents/projects/multimodal/conn2030/2030-1.pdf |archive-date = October 31, 2017 |url-status = live }}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)