Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Alarm management
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==The seven steps to alarm management== <ref>{{cite book |title=The Alarm Management Handbook |last1=Hollifield |first1=Bill R. |last2=Habibi |first2=Eddie |year=2010 |publisher=PAS, Inc |location=Houston, TX |isbn=978-0-9778969-2-9 |pages=35–182 | edition=2 | name-list-style=amp }}</ref> '''Step 1: Create and adopt an alarm philosophy''' A comprehensive design and guideline document is produced which defines a plant standard employing a best-practise alarm management methodology. '''Step 2: Alarm performance benchmarking''' Analyze the alarm system to determine its strengths and deficiencies, and effectively map out a practical solution to improve it. '''Step 3: “Bad actor” alarm resolution''' From experience, it is known that around half of the entire alarm load usually comes from a relatively few alarms. The methods for making them work properly are documented, and can be applied with minimum effort and maximum performance improvement. '''Step 4: Alarm documentation and rationalisation (D&R)''' A full overhaul of the alarm system to ensure that each alarm complies with the alarm philosophy and the principles of good alarm management. '''Step 5: Alarm system audit and enforcement''' DCS alarm systems are notoriously easy to change and generally lack proper security. Methods are needed to ensure that the alarm system does not drift from its rationalised state. '''Step 6: Real-time alarm management''' More advanced alarm management techniques are often needed to ensure that the alarm system properly supports, rather than hinders, the operator in all operating scenarios. These include Alarm Shelving, State-Based Alarming, and Alarm Flood Suppression technologies. '''Step 7: Control and maintain alarm system performance''' Proper management of change and longer term analysis and KPI monitoring are needed, to ensure that the gains that have been achieved from performing the steps above do not dwindle away over time. Otherwise they will; the principle of “entropy” definitely applies to an alarm system.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)