Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Golden Gate Bridge
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Bridge deck replacement (1982β1986)=== The original bridge used a [[concrete]] [[Deck (building)|deck]]. [[Salt]] carried by fog or mist reached the [[rebar]], causing [[corrosion]] and concrete [[spall]]ing. From 1982 to 1986, the original bridge deck, in 747 sections, was systematically replaced with a 40% lighter, and stronger, steel [[orthotropic deck]] panels, over 401 nights without closing the roadway completely to traffic. The roadway was also widened by two feet, resulting in outside curb lane width of 11 feet, instead of 10 feet for the inside lanes. This deck replacement was the bridge's greatest engineering project since it was built and cost over $68 million.<ref>{{cite web |title=Bridge Deck Replacement (1982β1986) |url=https://www.goldengate.org/bridge/bridge-maintenance/major-bridge-improvements/ |website=goldengate.org |access-date=August 2, 2020}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)