Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interlocking
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Complete and incomplete interlockings (U.S. terminology) == Interlockings allow trains to cross from one track to another using a [[Railroad switch|turnout]] and a series of switches. Railroad terminology defines the following types of interlockings as either ''complete'' or ''incomplete'' depending on the movements available. Although timetables generally do not identify an interlocking as one or the other, and rule books do not define the terms, the terms below are generally agreed upon by system crews and rules officials. ; Complete interlockings : allow continuous movements from any track on one side of the interlocking to any track on the opposite side without the use of a reverse move within the limits of the interlocking. This is true even if there are differing numbers of tracks on opposing sides, or if the interlocking has multiple sides. ; Incomplete interlockings : do not allow such movements as described above. Movements in an incomplete interlocking may be limited and may even require reverse movements to achieve the desired route.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)