Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Rate Field
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====Phase III (2003 season)==== [[File:DCP 1059 (51010002397).jpg|thumb|right|U.S. Cellular Field in 2003 with the new video board and fan deck]] * Scoreboard and video boards were upgraded. * Full-color, high resolution 28 Γ {{convert|53|ft|m|adj=on}} video screen added to center field scoreboard. * Two {{convert|300|ft|m|adj=on}}-long, {{convert|5|foot|adj=on}}-high video LED "ribbon" boards added along the upper deck facade. * Design upgrades consistent with the lower deck finished on outfield and upper deck concourses. * Fan Deck, featuring food and beverage service in an elevated patio-like atmosphere, built on center field concourse. * Outfield steel framework and underside of canopy roof painted dark gray; concrete in seating areas and on pedestrian ramps stained gray. * A life size bronze statue of [[Charles Comiskey]] was placed on the center field concourse behind section 100. * Capacity is increased from 45,936 to 47,098. * Phase III renovations cost approximately $20 million.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)