Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Batong line
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
{{Short description|Railway line of the Beijing Subway}} {{Infobox rail line | name = | other_name = M1 East (planned name)<br>Line 1 East<br>Line BT | logo = BJS Batong Line icon.svg | logo_width = 100px | color = {{rcr|BJS|b}} | image = 01 101 at Chajiafen (20210530182755).jpg | image_width = 300px | image_alt = | caption = Batong line train between [[Communication University of China station|Communication University of China]] and [[Shuang Qiao station|Shuang Qiao]] in May 2021 | type = [[Rapid transit]] | system = [[Beijing Subway]] | status = Operational | locale = [[Tongzhou District, Beijing|Tongzhou]] and [[Chaoyang District, Beijing|Chaoyang]] districts<br/>[[Beijing]] | start = {{stl|BJS|Si Hui}} | end = {{stl|BJS|Universal Resort}} | stations = 15 | routes = | daily_ridership = | ridership2 = 300,600 (2014 Avg.)<ref>{{cite web|url=http://www.bjsubway.com/node/3194|title=Official Ridership|publisher=Beijing Subway|access-date=2013-03-10|url-status=dead|archive-url=https://web.archive.org/web/20130322011003/http://www.bjsubway.com/node/3194|archive-date=2013-03-22}}</ref> <br> 364,800 (2014 Peak) | open = {{start date and age|2003|12|27}} | close = | owner = | operator = [[Beijing Mass Transit Railway Operation Corporation Limited]] | character = Elevated, at-grade, underground | depot = Sihui, Tuqiao<ref>{{cite book |script-title=zh:北京地铁八通线勘察设计·施工监理·建设管理 |author1=Liu Hongtao (刘洪涛) |editor=Song Minhua ({{lang|zh-hans|宋敏华}}) |location=Beijing |publisher=中国建筑工业出版社 |year=2008|pages=314–325|isbn=978-7-112-09808-8}}</ref> | stock = 6-car Type B (SFM01, SFM02, SFM07, BDK06) | linelength = {{convert|23.4|km|abbr=on}}<ref name=qianlong20191218>{{cite web|url=http://beijing.qianlong.com/2019/1218/3467046.shtml|title=北京地铁7号线东延和八通线南延今年底开通试运营}}</ref> | tracklength = | tracks = | gauge = {{track gauge|sg|allk=on}} | electrification = [[Third rail]] 750 V DC | speed = | elevation = | website = | map = {{Beijing Subway/Batong}} | map_state = collapsed }} [[File:01 026 at Yangzha Middle School (20210829123311).jpg|thumb|From 29 August 2021, Line 1 trains began to run Batong Line]] [[File:Guoyuan station platform.jpg|thumb|Two Batong line trains at [[Guoyuan station]] before renovation]] The '''Batong Line'''<ref>{{cite web |title=JPG格式线路图下载 {{!}} 北京地铁官方网站 |url=https://www.bjsubway.com/jpg.html |website=Beijing Subway |access-date=2021-01-01}}</ref> of the [[Beijing Subway]] ({{zh|s=北京地铁八通线|p=Běijīng dìtiě Bātōng xiàn}}) is an east–west [[rapid transit]] line in eastern [[Beijing]]. It extends [[Line 1 (Beijing Subway)|Line 1]] further east from {{stl|BJS|Sihui}} in [[Chaoyang District, Beijing|Chaoyang District]] to {{stl|BJS|Universal Resort}} in [[Tongzhou District, Beijing|Tongzhou District]]. [[Through operation]] with [[Line 1 (Beijing Subway)|Line 1]] started on August 29, 2021.<ref name=bjd20210825 /> The Batong Line derives its name by combining the first character of Bawangfen ({{lang|zh-hans|八王坟}}), another name for Sihui, and Tongzhou ({{lang|zh|通州}}), the eastern suburban district of Beijing which the line serves. The Batong Line is mainly above ground with only {{Cvt|3.8|km}} section is underground<ref name=bj2018-12-15>{{cite web|url=http://bj.people.com.cn/n2/2018/1215/c82840-32413471.html|date=2018-12-15|title=通州三线换乘施园站封顶 八通线南延7号线东延明年底开通}}</ref> and runs {{convert|23.4|km|abbr=on}}<ref name=qianlong20191218 /> from {{stl|BJS|Sihui}} in the west to {{stl|BJS|Universal Resort}} in the east. The color of the Batong Line that is shown on maps, like that of [[Line 1 (Beijing Subway)|Line 1]], is dark red. The line tends to be very crowded during rush hour. To alleviate this headways were reduced and [[Express train|express]] services were introduced during rush hour in early 2020. However, these express services were removed with the start of through operation with Line 1 in mid 2021. ==Hours of operation== The first east-bound train departs [[Sihui Station|Sihui]] at 6:00{{nbsp}}am. The first west-bound train departs Huazhuang at 5:16{{nbsp}}am. The last east-bound train leaves Sihui at 11:40{{nbsp}}pm. The last west-bound train leaves Huazhuang at 10:56{{nbsp}}pm.<ref>{{cite web |title=八通线 {{!}} 北京地铁官方网站 |url=https://www.bjsubway.com/station/xltcx/linebt/2019-12-26/560.html?sk=1 |website=Beijing Subway |access-date=2021-01-01}}</ref><ref>{{cite web |title=八通线 {{!}} 北京地铁官方网站 |url=https://www.bjsubway.com/station/xltcx/linebt/2013-08-20/36.html?sk=1 |website=Beijing Subway |access-date=2021-01-01}}</ref> ==Route== The Batong Line follows the [[Jingtong Expressway|Beijing-Tongzhou Expressway]] eastward from [[Sihui station|Sihui]] to [[Guǎnzhuang station|Guǎnzhuang]]. Between [[Gaobeidian station|Gaobeidian]] and [[Guǎnzhuang station|Guǎnzhuang]], the Batong Line and its stations are built into the highway's median. At [[Bali Qiao station|Bali Qiao]], the Batong Line turns to the southeast and follows the Jingtang Road to [[Tu Qiao station|Tu Qiao]], which is located just inside the Tuqiao Bridge exit on the eastern [[6th Ring Road]]. From there, the line turns and follows the 6th Ring Road south and west to {{stl|BJS|Huazhuang}} and {{stl|BJS|Universal Resort}}. ==Stations (from West to East)== Station list for Line 1 and Batong line of Beijing Subway, after the through operation started on August 29, 2021.<ref name=bjd20210825 /><br> {{Line 1 and Batong line of Beijing Subway}} ==Rolling stock== {{main|Beijing Subway rolling stock}} The line uses 6-car Type B rolling stock. ===Current=== {| class="wikitable" style="border-collapse: collapse; text-align: center;" !Model!!Image!!Manufacturer!!Year Built!!Year Refurbished!!Amount in Service!!Fleet Numbers!!Depot |- | [[:zh:北京地铁SFM01型电动车组|SFM01]] | [[File:01 074 at Chajiafen (20210601140114).jpg|150px]] | [[CRRC Qingdao Sifang]]<br/>[[Beijing Subway Rolling Stock Equipment]] | rowspan=3|2003 | 2015–2019 | 18 | TQ401–TQ408 (01 071–01 078), <br />TQ415–TQ424 (01 085–01 094) | rowspan=4|[[:zh:土桥车辆段|Tuqiao]] |- | [[:zh:北京地铁SFM02型电动车组|SFM02]] | [[File:TQ411_entering_Guoyuan_(20210331171512).jpg|150px]] | [[CRRC Qingdao Sifang]] | 2018 | 6 | TQ409–TQ414 (01 079–01 084) |- | [[:zh:北京地铁SFM01型电动车组|SFM07]] | [[File:TQ427_entering_Sihui_East.jpg|150px]] | [[Beijing Subway Rolling Stock Equipment]] | 2019 | 6 | TQ425–TQ430 (01 095–01 100) |- | [[:zh:北京地铁BDK06型电动车组|BDK06]] | [[File:TQ431_entering_Guoyuan_(20210331170745).jpg|150px]] | [[Beijing Subway Rolling Stock Equipment]] | 2019 | Never | 12 | TQ431–TQ437 (01 101–01 107), <br />01 108–01 112 |} ===Former=== {| class="wikitable" style="border-collapse: collapse; text-align: center;" !Model!!Manufacturer!!Year Built!!Year Retired!!Number Made!!Fleet Numbers!!Depot |- | [[:zh:北京地铁DK3型电动车组|DK3]] | rowspan=2|[[CRRC Changchun Railway Vehicles]] | 1971 | 2005 | 14 | TQ101–TQ114 | rowspan=2|[[:zh:土桥车辆段|Tuqiao]] |- | [[:zh:北京地铁DK16型电动车组|DK16]] | 1986 | 2003 | 4 | TQ115–TQ118 |} ==History== ===Phase 1=== Construction of the Batong Line began on December 28, 2001, and the line opened on December 27, 2003. In 2012, traffic on Batong Line was relieved by the opening of the parallel [[Line 6, Beijing Subway|Line 6]], with a 12.14% decrease in daily ridership and a 10–20% reduction in flow during rush hour.<ref name="ridership">{{cite news|url=http://www.bjjtw.gov.cn/gzdt/ywsds/201302/t20130207_71407.htm |script-title=zh:我市轨道交通网络化运营效果凸显|date=2013-02-07|access-date=2013-09-15|publisher=北京市交通委员会 [Beijing Municipal Transportation Committee] |url-status=dead|archive-url=https://web.archive.org/web/20140109144501/http://www.bjjtw.gov.cn/gzdt/ywsds/201302/t20130207_71407.htm|archive-date=2014-01-09}}</ref> However, during peak hours sections the line still operates above 100% capacity.<ref name = "ridership"/> ===Southern extension (Phase 2)=== There are 2 stations on the southern extension: {{stl|BJS|Huazhuang}} station and {{stl|BJS|Universal Resort}} station (both are transfer stations with the eastern extension of [[Line 7 (Beijing Subway)|Line 7]]).<ref>{{cite web |url=http://www.xinhuanet.com/local/2018-12/15/c_1123856864.htm |archive-url=https://web.archive.org/web/20181215133330/http://www.xinhuanet.com/local/2018-12/15/c_1123856864.htm |url-status=dead |archive-date=December 15, 2018 |title = 北京地铁八通线南延、7号线东延2019年年底通车试运营-新华网}}</ref> The extension is 4.5 km in length,<ref name=bj2019length>{{cite web|url=http://www.bjnews.com.cn/feature/2019/09/10/624954.html|title=地铁7号线东延、八通线南延今日试运行 年底开通|date=2019-09-10}}</ref> including 3.8 km underground section.<ref name=bj20181215>{{cite web |url=http://bj.people.com.cn/n2/2018/1215/c82840-32413471.html |url-status=dead |archive-url=https://web.archive.org/web/20190424000342/http://bj.people.com.cn/n2/2018/1215/c82840-32413471.html |archive-date=2019-04-24 |title=ͨ ʩվ ⶥ ͨ 7 ߶ ͨ-- Ƶ -- }}</ref> {{stl|BJS|Huazhuang}} station was opened on December 28, 2019.<ref name=bjd-1/> {{stl|BJS|Universal Resort}} station opened on August 26, 2021.<ref name=U>{{cite web|url=http://www.nbd.com.cn/articles/2021-08-25/1888609.html|date=2021-08-25|title=定了!北京环球度假区各交通站口明天同步开通|archive-url=https://archive.today/20210825101845/http://www.nbd.com.cn/articles/2021-08-25/1888609.html|archive-date=2021-08-25|access-date=2021-08-25|url-status=live}}</ref> ===Opening timeline=== {| class="wikitable" style="border-collapse: collapse; text-align: right;" !Segment!!Commencement!!Length!!Station(s)!!Name |- |style="text-align: left;"| Sihui — Tuqiao | 27 December 2003 | {{convert|18.964|km|mi|1|abbr=on}}<ref>{{cite web|url=http://news.sina.com.cn/o/2003-05-29/2023169473s.shtml|date=2003-05-29|title=北京地铁八通线轨道全线贯通 仍将确保年底通车}}</ref> | 13 |style="text-align: left;"| Phase 1 |- |style="text-align: left;"| Tuqiao — Huazhuang | 28 December 2019<ref name=bjd-1>{{cite web|url=http://bjwb.bjd.com.cn/html/2019-12/25/content_12438029.htm|title=7号线东延八通线南延本周六开通试运营 运营时间保持不变 环球度假区站暂不开通|date=2019-12-25|access-date=2019-12-25|archive-date=2019-12-25|archive-url=https://web.archive.org/web/20191225161944/http://bjwb.bjd.com.cn/html/2019-12/25/content_12438029.htm|url-status=dead}}</ref> |rowspan="2"|{{convert|4.5|km|mi|abbr=on}}<ref name=bj2019length /> | 1 |rowspan="2" style="text-align: left;"| Phase 2<br>(Southern extension) |- |style="text-align: left;"| Huazhuang — Universal Resort | 26 August 2021<ref name=U /> | 1 |} ===Through operations with Line 1=== [[File:01 024 at Chajiafen (20210523031941).jpg|thumb|A DKZ4 train of Line 1 near Communication Univ. of China station during the stress testing on 23 May 2021]] In 2010, a CPPCC member Chen Dingwang, proposed that services on [[Line 1 (Beijing Subway)|Line 1]] and the Batong Line should directly link, with [[Through train|through operations]], reducing travel times and removing the unnecessary forced transfers at {{stl|BJS|Si Hui Dong(E)}} or {{stl|BJS|Si Hui}}.<ref>{{cite web |url=http://www.china.com.cn/economic/txt/2011-09/16/content_23426447.htm |script-title=zh:北京地铁八通线一号线有望贯通 |publisher=中国网 |date=2011-09-16}}</ref> However, the [[Beijing Subway]] responded that Line 1's and Batong's [[Railway signalling|signal]] systems are completely different, so through-operation will be more difficult to achieve from an engineering standpoint. As of 2016, preliminary design and feasibility studies are underway to allow for through operations between Line 1 and Batong.<ref>{{Cite web|url=http://finance.qianlong.com/2016/1114/1109977.shtml |script-title=zh:北京八通线南延工程初步设计顺利通过评审-千龙网·中国首都网|website=finance.qianlong.com|access-date=2016-11-17}}</ref> On June 12, 2020, the project of the through operation of Line 1 and Batong line was approved by Beijing Development and Reform Commission.<ref>{{cite web|url=http://fgw.beijing.gov.cn/fgwzwgk/ysqzzdgk/202006/t20200612_1923647.htm|title=关于轨道交通1号线与八通线贯通运营工程项目建议书(代可行性研究报告)的批复|work=Beijing Development and Reform Commission|date=2020-06-12|access-date=2020-06-19}}</ref> [[Through operation]] with [[Line 1 (Beijing Subway)|Line 1]] started on 29 August 2021.<ref name=bjd20210825>{{cite news|url=https://news.bjd.com.cn/2021/08/25/159146t100.html|title=四惠四惠东站无须换乘了!北京地铁1号线、八通线本周日跨线运营|work=[[Beijing Daily]]|date=2021-08-25|accessdate=2021-08-25|archive-url=https://web.archive.org/web/20210825092946/https://news.bjd.com.cn/2021/08/25/159146t100.html|archive-date=2021-08-25}}</ref> ==References== {{Reflist}} ==External links== * {{Commons category-inline|Batong Line, Beijing Subway}} {{Clear}} {{Beijing transit}} {{Beijing Subway Station |Batong = yes }} {{DEFAULTSORT:Batong Line}} [[Category:Beijing Subway lines]] [[Category:Railway lines opened in 2003]] [[Category:2003 establishments in China]] [[Category:750 V DC railway electrification]]
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)
Pages transcluded onto the current version of this page
(
help
)
:
Template:Beijing Subway Station
(
edit
)
Template:Beijing transit
(
edit
)
Template:Cite news
(
edit
)
Template:Cite web
(
edit
)
Template:Clear
(
edit
)
Template:Commons category-inline
(
edit
)
Template:Convert
(
edit
)
Template:Cvt
(
edit
)
Template:Infobox rail line
(
edit
)
Template:Lang
(
edit
)
Template:Line 1 and Batong line of Beijing Subway
(
edit
)
Template:Main
(
edit
)
Template:Nbsp
(
edit
)
Template:Reflist
(
edit
)
Template:Short description
(
edit
)
Template:Stl
(
edit
)
Template:Zh
(
edit
)