Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Variable cost
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
{{Short description|Sum of marginal costs over all units produced}} [[Image:CVP-TC-FC-VC.svg|thumb|right|240px|[[Total Costs]] disaggregated as [[Fixed Costs]] plus '''Variable Costs'''. The quantity of output is measured on the horizontal axis.]] '''Variable costs''' are costs that change as the quantity of the good or service that a business produces changes.<ref name="GNB pp 48">Garrison, Noreen, Brewer. Ch 2 - Managerial Accounting and Costs Concepts, pp 48</ref> Variable costs are the sum of [[marginal cost]]s over all units produced. They can also be considered normal costs. [[Fixed cost]]s and variable costs make up the two components of [[total cost]]. '''Direct costs''' are costs that can easily be associated with a particular [[cost object]].<ref name="GNB pp 51">Garrison, Noreen, Brewer. Ch 2 - Managerial Accounting and Costs Concepts, pp 51</ref> However, not all variable costs are direct costs. For example, variable manufacturing [[Overhead (business)|overhead]] costs are variable costs that are [[indirect costs]], not direct costs. Variable costs are sometimes called unit-level costs as they vary with the number of units produced. Direct labor and overhead are often called '''conversion cost''',<ref name="GNB pp 39">Garrison, Noreen, Brewer. Ch 2 - Managerial Accounting and Costs Concepts, pp 39</ref> while direct material and direct labor are often referred to as '''prime cost'''.<ref name="GNB pp 39" /> In [[marketing]], it is necessary to know how costs divide between variable and fixed. This distinction is crucial in forecasting the earnings generated by various changes in unit sales and thus the financial impact of proposed marketing campaigns. In a survey of nearly 200 senior marketing managers, 60 percent responded that they found the "variable and fixed costs" metric very useful.<ref name=Marketing_Metrics>Farris, Paul W.; Neil T. Bendle; Phillip E. Pfeifer; David J. Reibstein (2010). ''Marketing Metrics: The Definitive Guide to Measuring Marketing Performance'', Upper Saddle River, New Jersey: Pearson Education, Inc. {{ISBN|0-13-705829-2}}. Content used from this source has been licensed under CC-By-SA and GFDL and may be reproduced verbatim. The [[Marketing Accountability Standards Board (MASB)]] endorses the definitions, purposes, and constructs of classes of measures that appear in ''Marketing Metrics'' as part of its ongoing [http://www.commonlanguage.wikispaces.net/ Common Language in Marketing Project].</ref> The level of variable cost is influenced by many factors, such as [[fixed cost]], duration of project, [[uncertainty]] and [[Interest rate|discount rate]]. An analytical formula of variable cost as a function of these factors has been derived. It can be used to assess how different factors impact variable cost and total return in an investment.<ref>{{Cite book|title=The Unity of Science and Economics: A New Foundation of Economic Theory|last=Chen|first=Jing|publisher=Springer|year=2016|doi=10.1007/978-1-4939-3466-9|isbn=978-1-4939-3464-5|url=https://www.springer.com/us/book/9781493934645}}</ref> ==Examples== Some common examples include sales commission, labor costs, and the costs of [[raw material]]s. For a [[clothing industry|business which produces clothing]], variable cost would include the direct material, i.e., cloth, and the direct labor. If the business uses a room, a [[sewing machine]], and 8 hours of a laborer's time with 6 yards of cloth to make a shirt, then the cost of labor and cloth increases if two shirts are produced, and those are the variable costs. The facility and equipment are fixed costs, incurred regardless of whether even one shirt is made. {| class="wikitable" |- ! !! 0 shirts !! 1 shirt !! 2 shirts !! 3 shirts |- | Cloth (Direct Materials)|| 0yds || 6yds || 12yds || 18yds |- | Labor (Direct Labor) || 0hrs || 8hrs || 16hrs || 24hrs |- | Equipment || 1 machine|| 1 machine || 1 machine || 1 machine |- | Facility (overhead)||1 room || 1 room || 1 room || 1 room |} The amount of materials and labor that goes into each shirt increases with the number of shirts produced. In this sense, the cost "varies" as production varies. In the long run, if the business planned to make 0 shirts, it would choose to have 0 machines and 0 rooms, but in the short run, even if it produces no shirts it has incurred those costs. Similarly, even if the total cost of producing 1 shirt is greater than the revenue from selling the shirt, the business would produce the shirt anyway if the revenue were greater than the variable cost. If the revenue that it is receiving is greater than its variable cost but less than its total cost, it will continue to operate while accruing an economic loss. If its total revenue is less than its variable cost in the short run, the business should shut down. If revenue is greater than total cost, this firm will have positive economic profit.{{cn|date=November 2023}} ==Variable costs over time== {{norefs|section|date=November 2023}} Over a one-day horizon, a factory's costs might largely consist of fixed costs, not variable. The company must pay for the building, the employee benefits, and the machinery regardless of whether anything is produced that day. The main variable cost will be materials and any energy costs actually used in production. However, over a six-month horizon, the factory will be better able to change the amount of labor to fit the desired output, either by using overtime hours, laying off employees, or hiring new employees. Thus, much of their labor becomes a variable cost - though not the cost of the managers, whose salaries are paid regardless of output. Over a five-year horizon, all costs can become variable costs. The business can decide to shut down and sell off its buildings and equipment if long-run total cost exceeds their long-run total revenue, or to expand and increase the amount of both of them if their long-run total revenue exceeds their long-run total cost, which would include their variable costs. It can change its entire labor force, managerial as well as line workers. Thus, which costs are classified as variable and which as fixed depends on the time horizon, most simply classified into short run and long run, but really with an entire range of time horizons. ==See also== {{colbegin}} * [[Cost]] * [[Fixed cost]] * [[Cost accounting]] * [[Cost curve]] * [[Cost driver]] * [[Semi variable cost]] * [[Total cost]] * [[Total revenue share]] * [[Contribution margin]] {{colend}} ==Notes== {{Reflist|2}} ==References== *<cite name="Garrison, Noreen, Brewer">{{cite book|last=Garrison|first=Ray H|author2=Eric W. Noreen |author3=Peter C. Brewer |title=Managerial Accounting|publisher=McGraw-Hill Irwin|edition=13e|isbn=978-0-07-337961-6|url=http://www.mhhe.com/garrison13e|year=2009}}</cite> *[https://www.playaccounting.com/explanation/exp-ma/prime-cost/ Prime Cost Explanation and Examples] by Play Accounting. {{Authority control}} [[Category:Costs]] [[Category:Management accounting]] [[Category:Production economics]] [[Category:Corporate development]] [[Category:Management cybernetics]]
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)
Pages transcluded onto the current version of this page
(
help
)
:
Template:Authority control
(
edit
)
Template:Cite book
(
edit
)
Template:Cn
(
edit
)
Template:Colbegin
(
edit
)
Template:Colend
(
edit
)
Template:ISBN
(
edit
)
Template:Norefs
(
edit
)
Template:Reflist
(
edit
)
Template:Short description
(
edit
)