Heathrow Express

Revision as of 18:54, 17 December 2024 by imported>10mmsocket (Replaced VE ref names using RefRenamer, script-assisted date audit and style fixes per MOS:NUM)
(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Template:Short description Template:Use British English Template:Infobox rail company Template:Heathrow rail services Heathrow Express is a high-frequency airport rail link operating between London Heathrow Airport and Template:Stn. Opened in 1998, trains run non-stop, with a journey time of 15 minutes. The service is operated jointly by Great Western Railway and Heathrow Express Operating Company, a wholly owned subsidiary of Heathrow Airport Holdings. Around 16,000 passengers use the service each day.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

HistoryEdit

BackgroundEdit

Heathrow Airport, the main international airport serving London, was connected to the London Underground network in the late 1970s.<ref>Template:Cite news</ref> However the journey to central London on the Piccadilly line takes around 40 to 50 minutes, the same time as a black taxi.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In the early 1980s, the quality of public transport to the airport was criticised at public inquiries regarding expansion of the airport, with the inspector noting that "a direct and dedicated ... rail link should be provided".<ref>Template:Cite Hansard</ref>

During 1986, the Heathrow Surface Access Study recommended a non-stop airport rail link between London and Heathrow Airport.<ref name="Green-2014a">Template:Cite book</ref> In July 1988, Secretary of State for Transport Paul Channon approved a joint venture between the British Airports Authority (BAA) and British Rail to work on the project, with an opening date of 1993.<ref name="Green-2014a" /><ref name="Railway Technology">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite Hansard</ref>

In November 1988, a Parliamentary bill was introduced, seeking approval to build the project.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Heathrow Express Railway Act received royal assent in May 1991.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In March 1993, government expenditure for the project was approved in the spring budget.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> BAA would fund 80% of the cost, with British Rail contributing 20%.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In August 1993, British Rail and BAA signed the contract to build the line, with an opening date of December 1997.<ref name="Green-2014a"/> Following the privatisation of British Rail from November 1993, the project was taken over by BAA in 1996.<ref>Template:Cite magazine</ref><ref>Template:Cite book</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

ConstructionEdit

Construction began in 1993, with an estimated cost of £350 million.<ref name="Railway Technology" /> The principal works were two Template:Convert single-bore tunnels (including eight escape shafts) and underground stations at Template:Rws and Terminal 4. Electrification of the Great Western Main Line (GWML) between Paddington and Airport Junction, where the new line diverged from the GWML, was also required to achieve a 15-minute journey time.<ref name="Green-2014a" /> A flying junction known as the Stockley Flyover was constructed to connect the tunnel to the GWML fast lines. As part of the construction of the project, steps were taken to reduce the environmental and visual impact of the railway, including disguising ventilation shafts as barns.<ref name="BBC News-1998">Template:Cite news</ref>

In October 1994, a tunnel collapse occurred during construction that led to the subsidence of a surface building and three large surface craters.<ref name="Harper-2000">Template:Cite news</ref><ref>Template:Cite news</ref> The investigation into the collapse led to a six-month delay in opening and additional costs of around £150 million.<ref>Template:Cite news</ref><ref name="Harper-2000" />

OpeningEdit

Beginning in January 1998, an interim service called Heathrow FastTrain ran to a temporary station called Heathrow Junction, where a coach took passengers the rest of the way.<ref>Template:Cite news</ref> Full service between London Paddington, Heathrow Central and Terminal 4 opened on 23 June 1998, with an opening by Prime Minister Tony Blair.<ref name="BBC News-1998" /> The Heathrow Express brand, as well as staff uniforms, train design and station architecture were designed by Wolff Olins.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

From 1999 to 2003, a check-in service was provided at Paddington, allowing Heathrow Express passengers to check in and drop off their luggage prior to flights, which was similar to the service currently provided on Hong Kong's Airport Express. Checked baggage was transported to the airport by using the luggage space in the westbound first carriage. This service was withdrawn due to low usage and high cost of operation.<ref>Template:Cite news</ref><ref>Template:Cite magazine</ref>

In the late 1990s, BAA proposed an extension of the line to St Pancras, proposing use of the Dudding Hill line to access the Midland Main Line to access St Pancras.<ref name="Harper-1999" /> Railtrack proposed a stopping service from Heathrow to St Pancras, by using London Underground tracks.<ref name="Harper-1999">Template:Cite news</ref> This was part of Railtrack's bid to win the public-private partnership (PPP) contract to upgrade and maintain the sub-surface lines of the Underground.<ref>Template:Cite news</ref><ref name="Harper-1999" /> Neither proposal took place, following Railtrack's financial issues in the early 2000s.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In March 2008, the service was extended to the Heathrow Terminal 5 station with the opening of the new Terminal 5.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2010, a dedicated shuttle between Heathrow Central and Terminal 4 was introduced, timed to connect with the main Heathrow Express service to/from Terminal 5 to improve connections between the terminals.<ref>Template:Cite news</ref>

During 2009, flight information display screens were introduced at London Paddington.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2017, Heathrow Express announced that over 100 million passengers had used the service since opening in 1998.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In March 2018, the Department for Transport and Heathrow Airport Holdings announced that the contract allowing Heathrow Express to operate had been extended to 2028.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> During August 2018, Great Western Railway (GWR) took over the operation of Heathrow Express as part of a new management contract.<ref>Template:Cite magazine</ref> Heathrow Airport continues to be responsible for commercial aspects of the service, including marketing, ticket pricing and revenue management, while GWR are now responsible for operations.<ref name="heathrowexpress.com">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite magazine</ref> In December 2020, new trains were introduced, replacing the trains used since the service began in 1998.<ref name="Heathrow Express" />

Heathrow Connect to Elizabeth lineEdit

In June 2005, Heathrow Express began jointly providing a new Heathrow Connect service, which saw a new twice-hourly stopping service on the same route between Paddington and Heathrow using Template:Brc EMUs from the Siemens Desiro family. Heathrow Airport Holdings had provided the on-board staff through Heathrow Express as part of the contract.<ref>Template:Cite magazine</ref> This continued until May 2018, when Heathrow Connect was absorbed into TfL Rail ahead of the new Crossrail project.<ref>Template:Cite press release</ref> In May 2022, TfL Rail services were rebranded as the Elizabeth line, with through trains running through central London from November 2022.<ref name="Caswell-2022">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Heathrow Express services will continue to terminate at London Paddington.<ref name="Caswell-2022" />

ServiceEdit

Route Template:Abbr Intermediate stops
Template:StnTemplate:Stn 4 Heathrow Terminals 2 & 3

Trains depart Paddington every 15Template:Nbspminutes from 05:10 (06:10 on Sunday) until 23:25,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and there is a similar quarter-hourly service in the return direction. At Paddington they use dedicated platforms 6 and 7, although on occasions other platforms are used. There are two stops at Heathrow: Heathrow Terminals 2 & 3 (journey time from Paddington 15Template:Nbspminutes) and Heathrow Terminal 5 (journey time 21Template:Nbspminutes), platforms 3 and 4. Passengers travelling between terminals can do so for free, with passengers for Heathrow Terminal 4 having to change to an Elizabeth line train at Heathrow Terminals 2 & 3 station.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

On boardEdit

Trains offer a choice of two classes of travel: express class which corresponds to standard class, and "business first" class which corresponds to first class. Both classes are fully accessible, with large luggage storage spaces and complimentary Wi-Fi.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> First class offers wider seats and a table at every seat, as well as 'Fast Track' security at the airport terminals.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Children under 16 travel free of charge with a fare-paying adult; unaccompanied children may travel free of charge in express class only with proof of a same-day flight to or from Heathrow.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

RouteEdit

The service runs along Network Rail's Great Western Main Line from Paddington to Airport Junction. The line from Airport Junction to the airport terminals is owned by Heathrow Airport Holdings but maintained by Network Rail. The line is electrified at Template:Nowrap overhead and uses Automatic Train Protection (ATP) and European Train Control System (ETCS). The controlling signal centre for the entire route is the Thames Valley Signalling Centre (TVSC) in Didcot.

StationsEdit

Station Image Time
London Paddington File:Paddington station MMB 46 332002.jpg Start
Heathrow Terminals 2 & 3 File:Heathrow Express P1180327.jpg 15 minutes
Heathrow Terminal 5 File:Heathrow T5 station AB.JPG 21 minutes

Rolling stockEdit

Current fleetEdit

On 29 December 2020, the first of twelve Class 387 units from the Bombardier Electrostar family began service with Heathrow Express, having replaced the Class 332 fleet.<ref name="Heathrow Express">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The units transferred from Great Western Railway who are also responsible for their maintenance and operation within Heathrow Express.<ref name="heathrowexpress.com" /> The units underwent modifications prior to their introduction on Heathrow Express which included the fitting of USB power sockets, extra luggage space, work tables, on-board Wi-Fi and HD TVs. A new Business First cabin was also included in a 2+1 configuration with reclining seats.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Class Image Type Top speed Number Carriages Routes Built
 mph   km/h 
387 Electrostar File:Railways of Great Britain 198.jpg EMU 110 177 12 4 London PaddingtonHeathrow Terminal 5 2016–2017
File:Heathrow Express Class 387-1.png

Past fleetEdit

The initial BAA/BR joint venture initially proposed use of Networker trains, similar to those purchased elsewhere by Network SouthEast in the late 1980s and early 1990s.<ref name="Green-2014b">Template:Cite book</ref> Instead, 14 Class 332 trainsets were ordered from Siemens Transportation Systems in July 1994.<ref>Template:Cite magazine</ref><ref name="Green-2014b" /> These were built by CAF with traction equipment supplied by Siemens, and first entered service in 1998.<ref name="BBC News-1998" /><ref>Template:Cite magazine</ref> Additional carriages were ordered in 1998 to extend the trains firstly to four carriages, then in 2001 to extend 5 of the trains to five carriages in length.<ref name="Rail929">Template:Cite magazine</ref><ref>Template:Cite magazine</ref>

File:332002 TSO Internal.jpg
Refurbished standard class interior on a Class 332
File:332002 DMFO Interior.jpg
Refurbished first class interior on a Class 332

Until May 2018, Heathrow Express leased a singular Class 360 unit which operated the shuttle service between Heathrow Central and Heathrow Terminal 4.<ref>Template:Cite magazine</ref> Following the withdrawal of the Class 360 unit, all Heathrow Express services were operated by Class 332 units. In 2019, it was announced that all the Class 332 units would be replaced by a fleet of twelve Class 387 units from Great Western Railway with GWR also managing their introduction and arrival.<ref name="heathrowexpress.com" /> The first Class 332 unit was withdrawn and scrapped in November 2020 and by 28 December 2020, all of the units were withdrawn.<ref>Template:Cite magazine</ref><ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

Class Image Type Top speed Number Carriages Built
 mph   km/h 
332 File:Heathrow Express 332007 at Paddington.jpg EMU 100 161 9 4 1997–1998
5 5
360/2 Desiro File:Southall - Heathrow Express 360205 (Hugh Llewellyn 26907836519).jpg EMU 100 161 1 5 2002–2005

See alsoEdit

ReferencesEdit

Template:Reflist

Further readingEdit

External linksEdit

Template:Sister project

Template:Portal bar Template:UK TOCs Template:Transport in London Template:London Heathrow Airport Template:Airport rail links in the United Kingdom Template:Use dmy dates