Evergreen Point Floating Bridge (1963)

Revision as of 23:57, 24 January 2025 by imported>Panamitsu (add {{Use American English}} template)
(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Template:Short description Template:For Template:Use American English Template:Use mdy dates Template:Main other{{#invoke:Infobox|infobox}}Template:Template other{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Infobox bridge with unknown parameter "_VALUE_"|ignoreblank = 1| also_known_as | alt | aqueduct_name | architect | begin | below | bridge_name | builder | built | capacity | caption | carries | child | clearance | clearance_above | clearance_below | closed | collapsed | demolished | complete | contracted_designer | coord_format | coordinates | cost | crosses | dedicated | depth | design | designer | destroyed | diameter | downstream | electrification | embed | embedded | ends | engineering | extra | fabricator | fetchwikidata |first_length | first_diameter | followed | gauge | height | heritage | id | id_type | image | image_caption | image_size | image_upright | inaugurated | lanes | length | life | load | locale | location | mainspan | maint | maintained | mapframe | mapframe-caption | mapframe-custom | mapframe-id | mapframe-coord | mapframe-wikidata | mapframe-point | mapframe-shape | mapframe-frame-width | mapframe-frame-height | mapframe-shape-fill | mapframe-shape-fill-opacity | mapframe-stroke-color | mapframe-stroke-colour | mapframe-stroke-width | mapframe-marker | mapframe-marker-color | mapframe-marker-colour | mapframe-geomask | mapframe-geomask-stroke-color | mapframe-geomask-stroke-colour | mapframe-geomask-stroke-width | mapframe-geomask-fill | mapframe-geomask-fill-opacity | mapframe-zoom | mapframe-length_km | mapframe-length_mi | mapframe-area_km2 | mapframe-area_mi2 | mapframe-frame-coordinates | mapframe-frame-coord | mapframe-switcher | material | material1 | material2 | name | named_for | native_name | native_name_lang | notrack | num_track | number_spans | official_name | onlysourced | open | opened | opening | os_grid_reference | other_name | owner | passable | piers_in_water | pierswater | preceded | qid | rebuilt | references | refs | replaced_by | replaces | second_length | second_diameter | spans | starts | structure_gauge | third_length | third_diameter | toll | towpath | track_gauge | traffic | traversable | upstream | website | width | winner }}Template:Main other

The Evergreen Point Floating Bridge, officially the Governor Albert D. Rosellini Bridge, and commonly called the SR 520 Bridge or 520 Bridge, was a floating bridge in the U.S. state of Washington that carried State Route 520 across Lake Washington, connecting Medina with the Montlake neighborhood of Seattle.

The bridge's total length was approximately Template:Convert.<ref>USGS map</ref> Its Template:Convert<ref>WSDOT - SR 520 Bridge Facts Template:Webarchive. Washington State Department of Transportation. Accessed May 22, 2011.</ref> floating section was the longest floating bridge in the world until April 11, 2016, when its replacement exceeded it by Template:Convert.

The bridge was named for Evergreen Point, the westernmost of the three small Eastside peninsulas that SR 520 crosses. (The other two are Hunts Point and Yarrow Point.) In 1988, it was renamed for the state's 15th governor, Albert D. Rosellini, who had advocated its construction.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Although there were plans to replace the bridge several years following its completion,<ref>Template:Cite news</ref> it was not until much later that investigations revealed the aging bridge to be in poor condition and unable to withstand the major hazards for which it was originally designed.<ref name="GeoEngineers">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> This finding may have accelerated plans to finally replace it. In response to these hazards and the need to expand the current infrastructure, construction on a replacement began in 2012; the new bridge opened in April 2016. The original bridge was closed to traffic on April 22, 2016, and was disassembled over the following months.

HistoryEdit

File:Washington SR-520 bridge under construction - 1962.jpg
Aerial view of the Evergreen Point Floating Bridge under construction, 1962. This shows the causeway extending from Foster Island in the Washington Park Arboretum roughly east to where Union Bay opens up into Lake Washington. Evergreen Point is across the lake.

The bridge was opened for commuter traffic on August 28, 1963, after three years of construction.<ref name="Times-2003">Template:Cite news</ref> It was built as a four-lane toll bridge to provide easy access from Seattle to Eastside communities such as Bellevue, Kirkland, and Redmond. The total cost of the bridge, in 1961 dollars, was $21 million (at least $127 million in 2011 dollars<ref>{{#invoke:citation/CS1|citation |CitationClass=web }} Using the "Project" costs.</ref>).<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> To make up for this cost, commuters paid a 35-cent toll in each direction until June 22, 1979.<ref>Template:Cite news</ref> The tollbooths were removed and the plaza space was converted into a flyer stop for Metro Transit buses.Template:Citation needed

The bridge affected many communities on the Eastside. Redmond's population saw a dramatic increase, jumping from less than 1,500 in 1960 to 11,000 in 1970.<ref>City of Redmond, {{#invoke:citation/CS1|citation |CitationClass=web }}, 2005</ref> It was the second floating bridge to cross Lake Washington; the first was the Lake Washington Floating Bridge, built in 1940 as part of U.S. Route 10, later part of Interstate 90,<ref name="Times-2003"/> which at its construction was the largest floating structure ever built.Template:Citation needed

On November 4, 1972, two people drowned after their boat drifted and collided with the bridge's windward side during a winter storm. The remaining four people on the boat were later rescued.<ref>Template:Cite news</ref> The incident prompted the Department of Highways to install 88 safety ladders along the bridge.<ref name="Times-2003"/><ref>Template:Cite news</ref>

On August 28, 1988, the bridge was officially renamed for governor Albert D. Rosellini; the Washington State Transportation Commission approved of the renaming three days earlier ahead of the bridge's 25th anniversary celebration.<ref>Template:Cite news</ref> At the time, 109,000 vehicles used the bridge on an average day and 529 million vehicles were estimated to have crossed it since it opened.<ref>Template:Cite news</ref>

DescriptionEdit

Drawspan openingEdit

The bridge was built with a drawspan in the center that could open for boats too tall to go under the bridge.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The bridge opened by raising two Template:Convert steel grids about Template:Convert and moving an adjacent pontoon beneath them.<ref name="New York Times">Template:Cite news</ref>

In 1989, an electrical fault caused the drawspan to open during rush hour, causing one death and five injuries.<ref name="New York Times"/> In 2000, a gravel barge struck the bridge.<ref>Template:Cite news</ref>

Replacement bridgeEdit

Template:Main article Just five years after the bridge opened, a study commissioned by the state legislature was completed to figure out how to provide for the great demand for cross-lake transportation. That study evaluated bridge and tunnel crossings north and south of the bridge.<ref>Tudor Engineering Company for Washington State Highway Commission Department of Highways. Legislative Reconnaissance and Feasibility Report "Lake Washington Bridge Crossings, Parallel Evergreen Point Bridge, North Lake Bridge. December 1968.</ref> Other plans considered in the late 1980s proposed the addition of rail transit or bus lanes to add capacity.<ref>Template:Cite news</ref> To prepare a case for the state legislature, the Trans-Lake Study was commissioned to study various alternatives.<ref>Template:Cite news</ref> The study brought together 47 representatives of public agencies, neighborhoods, businesses, and advocacy interests.<ref>Template:Citation </ref>

In 1997, Myint Lwin, WSDOT's chief bridge engineer, said that even with repairs, the bridge could be expected to last only about twenty more years (until 2017).<ref>Whitely, Peyton. "New bridge first faces political, fiscal tests." {{#invoke:citation/CS1|citation |CitationClass=web }} February 19, 1997.</ref> The bridge needed to be closed to traffic in high winds, and even after a seismic retrofit in 1999, it was at risk of collapse during an earthquake. Due to the weight of various reinforcements over the years, the bridge deck ultimately sat about Template:Convert lower over the water than it did originally.Template:Citation needed

Since the bridge was built in the early 1960s, prior to the implementation of modern earthquake standards, its hollow support structures would have likely failed during a major earthquake. Additionally, vibrations induced by storm surges and strong winds could have compromised the drawspan, anchor cables, and pontoons, subjecting them to structural failure.<ref name="American Infrastructure">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Even for storms below the maximum threshold for failure to occur, Washington State Department of Transportation (WSDOT) still closed the floating bridge to traffic. The original bridge carried two lanes of traffic in each direction, but did not include emergency shoulders or pedestrian and bicycle crossings. This posed traffic problems since any obstruction caused by car breakdown, wreck or maintenance would result in traffic backups.<ref name="Shannon & Wilson">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In 2011, WSDOT broke ground on the replacement bridge.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> On April 2, 2016, WSDOT held a grand opening ceremony, allowing the public to explore the top deck of the new bridge on the westbound side.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The replacement bridge opened to westbound traffic on April 11, 2016, and opened to eastbound traffic on April 25, 2016.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The old bridge was permanently closed at 23:00 PDT on April 22, 2016, with demolition completed by the end of 2016.Template:Citation needed The bridge was removed by spring 2017.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

ConstructionEdit

File:SR 520 Floating Bridge and its replacement from Evergreen Point.jpg
Replacement bridge, to the north of the Rosellini Bridge, under construction in May 2015
File:Underside of Evergreen Point Floating Bridge west highrise.jpg
Photo of the south side of the bridge in 2015, with construction visible in the background.
File:Evergreen Point Floating Bridge west approach, looking eastbound (2019).jpg
The new Evergreen Point Floating Bridge, which opened in 2016 and initially reused the west approach of the old bridge

The cost of all improvements to SR-520 between I-5 and I-405, including the new bridge, is forecast to be $4.65 billion.<ref name="costs">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The first of 21 longitudinal pontoons were positioned on August 11, 2012. Each pontoon is Template:Convert long and Template:Convert wide.<ref>Template:Cite news</ref> The pontoons were constructed in Aberdeen by Kiewit Construction. Pontoon construction was plagued by errors and shoddy construction. Reports included workers installing incorrectly sized rebar, installing it in the wrong location, and even having it missing altogether. Workers also poured concrete in weather that was too wet or too cold. Several of the new pontoons have had problems with cracking, which has been blamed on Kiewit's poor work. An independent auditor stated that there had been a long-running pattern of poor-quality work and that WSDOT failed to force Kiewit to take corrective actions. An inspector for the construction called it a disaster waiting to happen, adding "I won't drive across that bridge when they have it built."<ref>Template:Cite news</ref>

By the end of February 2015, enough of the new bridge was in place to block tall ships that used to pass through a drawspan in the Rosellini Bridge.<ref>Template:Citation</ref> In early July 2015, the westernmost floating pontoon was moved to make room for the installation of the west end of the bridge; on July 8, 2015, all longitudinal pontoons for the new bridge were in place.<ref>Template:Cite press release</ref>

TollingEdit

When the bridge opened in 1963, a 35 cent toll was collected to pay off a construction bond. The sole toll plaza was located at the east end of the bridge in Medina and had nine booths.<ref>Template:Cite news</ref> The state government offered discounts to commuters using a ticket book, as well as carpools of two or more people.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref> The toll was retired on June 22, 1979, after the $35 million bond had been paid off 20 years ahead of schedule.<ref>Template:Cite news</ref> More than 213 million vehicles had used the toll bridge and generated $59.6 million in revenue.<ref>Template:Cite news</ref> One of the former tollbooths was reused for a drive-through espresso stand in Juanita.<ref>Template:Cite news</ref>

Tolls were reinstated on December 29, 2011, to fund the original bridge's replacement. Within the first year, traffic levels declined by 30 percent and tolls generated $50 million in gross revenue.<ref>Template:Cite news</ref> ESHB 2211, which authorized tolling on the SR 520 bridge beginning in 2010 to fund the new bridge, was signed into law in May 2009 by governor Christine Gregoire.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The State Transportation Commission has proposed a toll of US$3.59 each way during peak periods. The proposed rates during other hours were to range from $0 to $2.87.<ref>Comments sought on proposed SR 520 toll rates. KPBJ.com (December 5, 2010). Retrieved on 2011-08-29.</ref>

All tolling was done automatically with no tollbooths. Tolling for people without "Good to Go" passes is done by license plates.<ref name=costs /> Toll readers were located on gantries at the east highrise,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> but additional gantries on the east mainland were added to facilitate tolling on the new bridge once opened.

Tim Eyman promoted Initiative 1125, which among other measures, would have banned the time-of-day tolling proposed for the bridge, required funding to be used on the road that collected the toll, and required tolls to be set by elected officials.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The initiative was defeated by Washington voters.<ref>Template:Cite news</ref>

See alsoEdit

ReferencesEdit

Template:Reflist

External linksEdit

Template:Sister project

Template:Bridges of Seattle Template:Authority control