The Amtrak Cascades is a passenger train route in the Pacific Northwest, operated by Amtrak in partnership with the U.S. states of Washington and Oregon. It is named after the Cascade mountain range that the route parallels. The Template:Convert corridor runs from Vancouver, British Columbia, through Seattle, Washington, and Portland, Oregon, to Eugene, Oregon.

Template:As of, seven round trips operate along the corridor each day: one Vancouver–Seattle, one Vancouver–Seattle–Portland, three Seattle–Portland, and two Seattle–Portland–Eugene. No train travels the entire length of the corridor. For trains that do not travel directly to Vancouver or Eugene, connections are available on Amtrak Thruway bus services.<ref name="Timetable">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Additionally, Amtrak Thruway services offer connections to other destinations in British Columbia, Idaho, Oregon, and Washington not on the rail corridor.

In the fiscal year 2017, Cascades was Amtrak's eighth-busiest route with a total annual ridership of over 810,000.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In fiscal year 2018, farebox recovery ratio for the train was 63%.<ref name="FY2015">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> On-time performance in FY2021 was 58.7%.<ref name=":0">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

HistoryEdit

Prior serviceEdit

Passenger train service between Seattle and Portland—the core of what became the Cascades corridor—was operated as a joint partnership by the Northern Pacific, Great Northern, and Union Pacific from 1925 to 1970, with the three railroads cross-honoring tickets on their Seattle-Portland routes. When Great Northern and Northern Pacific were folded into the Burlington Northern in 1970, the reconfigured partnership continued to operate the Seattle-Portland service until the creation of Amtrak in 1971.<ref>The official guide of the Railways and Steam Navigation Lines of the U.S., Rand McNally & Company, May 1966. The guide shows that the service was operated jointly, some trains using Seattle's King Street Station and the rest Seattle's Union Station.</ref> Service between Vancouver, British Columbia, and Seattle was provided via the Great Northern / Burlington Northern International, and between Portland and Eugene by Southern Pacific.

Amtrak eraEdit

File:Arrival and departure board at King Street Station Seattle 1981.jpg
Departure board at Seattle's King Street Station in 1981, listing the Mount Rainier, the Pacific International, and other since-discontinued trains

Amtrak took over intercity passenger rail operations from the private railroads on May 1, 1971. Initial service on the Seattle–Portland portion of the corridor consisted of three daily round trips–one long-distance train running all the way to San Diego, along with two corridor trains inherited from Burlington Northern. There was no corridor service south to Eugene, and no service to the Canadian border at all. The trains were unnamed until November 1971, when the two corridor trains were named the Mount Rainier and Puget Sound and the long-distance train became the Coast Starlight.<ref name="AllAboard">Template:All Aboard Amtrak</ref>

Passenger rail service to Vancouver, British Columbia, was restarted on July 17, 1972, with the inauguration of the Seattle–Vancouver Pacific International, which operated with a dome car (unusual for short runs).<ref>Zimmermann, Karl. Amtrak at Milepost 10. Park Forest IL: PTJ Publishing, 1981.</ref><ref name=":3">Template:Cite book</ref> The train was Amtrak's first international service.<ref name=":3" />

The next major change to service in the corridor came on June 7, 1977, when Amtrak introduced the long-distance Pioneer between Seattle, Portland and Salt Lake City, Utah. To maintain the same level of service between Seattle and Portland, the Puget Sound was eliminated, and the schedule of the Mount Rainier was shifted.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>Template:Rp

The corridor expanded south of Portland to Eugene on August 3, 1980, with the addition of the Willamette Valley, which operated with two daily round trips, financially subsidized by the State of Oregon.<ref name="AllAboard" /> The Pacific International and Willamette Valley struggled to attract riders and were discontinued in September 1981 and December 1981, respectively.<ref name="rg19811231">Template:Cite news</ref>

This left three trains on the Seattle–Portland corridor: the regional Mount Rainier and the long-distance Pioneer and Coast Starlight. This level of service would remain unchanged for 13 years.

Expansion in the 1990sEdit

File:Northwest Talgo at Portland Union Station, August 1994.jpg
The Northwest Talgo at Portland in August 1994
File:Amtrakcascades.jpg
Amtrak Cascades consist in Portland, Oregon, with NPCU at the head of the train.

In 1994, Amtrak began a six-month trial run of modern Talgo equipment over the Seattle–Portland corridor. Amtrak named this service Northwest Talgo, and announced that it would institute a second, conventional train on the corridor (supplementing the Mount Rainier) once the trial concluded.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> Regular service began on April 1, 1994.<ref>Template:Cite press release</ref>

Looking toward the future, Amtrak did an exhibition trip from Vancouver through to Eugene. Amtrak replaced the Northwest Talgo with the Mount Adams on October 30.<ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> At the same time, the state of Oregon and Amtrak agreed to extend the Mount Rainier to Eugene through June 1995, with Oregon paying two-thirds of the $1.5 million subsidy.<ref>Template:Cite news</ref>

Service to Canada returned on May 26, 1995, when the Mount Baker International began running between Vancouver and Seattle. The state of Washington leased Talgo equipment similar to the demonstrator from 1994.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> The Mount Rainier was renamed the Cascadia in October 1995; the new name reflected the joint Oregon–Washington operations of the train.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> A temporary commuter rail service using Amtrak trains was deployed in September 1997 between Union Station in Portland and Vancouver station during a full closure of the Interstate Bridge for repairs.<ref>Template:Cite news</ref> The free trains had ten round trips and drew an average of 1,335 passengers per day; the low ridership was attributed to the isolated location of Vancouver's station.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>

A third Seattle–Portland corridor train began in the spring of 1998 with leased Talgo equipment, replacing the discontinued long-distance Pioneer. The other Seattle–Portland/Eugene trains began using Talgo trainsets as well, while the Seattle-Vancouver train used conventional equipment. In preparation for the Vancouver route receiving Talgo equipment as well, Amtrak introduced the temporary Pacific Northwest brand for all four trains, dropping individual names, effective with the spring 1998 timetable.

Amtrak CascadesEdit

File:Amtrak Cascades in Vancouver, BC.jpg
Amtrak Cascades travels by Commercial–Broadway station in Vancouver, British Columbia

Amtrak announced the new Amtrak Cascades brand in the fall 1998 timetable; the new equipment began operation in December.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> The full Cascades brand was rolled out on January 12, 1999, following a six-week delay due to an issue with the seat designs on the Talgo trainsets.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> Amtrak extended a second train to Eugene in late 2000.

From the mid-1990s to the May 12, 2008, Amtrak system timetable, full service dining was available on trains going north out of Seattle's King Street Station to Vancouver. The southern trains to Portland briefly had full dining services until the May 16, 1999, system timetable.

In 2004, the Rail Plus program began, allowing cross-ticketing between Sound Transit's Sounder commuter rail and Amtrak between Seattle and Everett on some Cascades trains.<ref>Template:Cite press release</ref>

The corridor continued to grow, with another Portland–Seattle train arriving in 2006, and the long-awaited through service between Vancouver, British Columbia, and Portland, eliminating the need to transfer in Seattle, beginning on August 19, 2009<ref>Template:Cite press release</ref> as a pilot project to determine whether a train permanently operating on the route would be feasible. With the Canadian federal government requesting Amtrak to pay for border control costs for the second daily train, the train was scheduled to be discontinued on October 31, 2010. However, Washington State and Canadian officials held discussions in an attempt to continue the service,<ref>Template:Cite magazine</ref> which resulted in the Canadian government permanently waiving the fee.<ref>Template:Cite news</ref>

Two additional round trips between Seattle and Portland were added on December 18, 2017; an early morning departure from each city and a late evening return, enabling same-day business travel between the two cities.<ref name=":4">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite newsTemplate:Dead link</ref> On the first day of service of the new timetable, a train derailed outside of DuPont, Washington, south of Tacoma.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Service resumed using the old timetable without the additional round trips.

Pandemic cuts and restorationEdit

In March 2020, Amtrak Cascades service north of Seattle was suspended indefinitely after all non-essential travel across the Canada–United States border was restricted in response to the COVID-19 pandemic.<ref>Template:Cite press release</ref><ref>Template:Cite news</ref> Amtrak crews ran practice trips between Seattle and Vancouver, British Columbia, in February 2022, and service between those two cities resumed on September 26, 2022.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The round trip between Portland and Vancouver resumed on March 7, 2023, restoring the second Seattle–Vancouver trip that existed prior to the COVID-19 pandemic.<ref>Template:Cite news</ref> Seattle–Portland service expanded to six round trips on December 11, 2023, adding the two additional round trips between Seattle and Portland originally intended to start in 2017.<ref>Template:Cite news</ref><ref>Template:Cite press release</ref><ref>Template:Cite news</ref>

In 2025, the completion of a new customs inspection area at Vancouver's Pacific Central Station will allow Cascades trains to eliminate a secondary inspection stop in Blaine that is performed by U.S. Customs and Border Protection officers.<ref>Template:Cite news</ref> The modified customs procedure is expected to save 10 minutes on southbound trips.<ref>Template:Cite news</ref> A new maintenance facility at the Seattle Yard is scheduled to open in late 2026.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

RouteEdit

File:Amtrak Cascades.svg
Amtrak Cascades route map

Stations and ConnectionsEdit

Amtrak Cascades stations
State/Province City Station Connections
British Columbia Vancouver Pacific Central Station Template:Unbulleted list
Washington Bellingham Fairhaven Station Template:Unbulleted list
Mount Vernon Skagit Station Template:Unbulleted list
Stanwood Stanwood Template:Bus icon Local Bus: Community Transit, Island Transit
Everett Everett Template:Unbulleted list
Edmonds Edmonds Template:Unbulleted list
Seattle King Street Station Template:Unbulleted list
Tukwila Tukwila Template:Unbulleted list
Tacoma Tacoma Dome Station Template:Unbulleted list
Olympia/Lacey Centennial Station Template:Unbulleted list
Centralia Centralia Template:Unbulleted list
Kelso/Longview Kelso/Longview Template:Unbulleted list
Vancouver, WA Vancouver, WA Template:Rint Amtrak: Coast Starlight, Empire Builder
Oregon Portland Portland Union Station Template:Unbulleted list
Oregon City Oregon City
Salem Salem Template:Unbulleted list
Albany Albany Template:Unbulleted list
Eugene Eugene–Springfield Template:Unbulleted list

OperationsEdit

The Cascades primarily uses freight tracks that are owned by BNSF Railway in Washington and British Columbia, and the Union Pacific Railroad in Oregon.<ref name="BH-Ridership2024"/> In British Columbia, Canadian National Railway operates the tracks between the Vancouver terminus and the New Westminster Bridge for BNSF,<ref name="FW20060120">Template:Cite news</ref> and it operates the bridge itself for the Canadian federal government.<ref name="PC202306">Template:Cite magazine</ref> Sound Transit owns a short section of tracks in Washington on the Point Defiance Bypass.<ref name="BH-Ridership2024">Template:Cite news</ref> In fiscal year 2023, the trains had an on-time percentage of 64Template:Nbsppercent, among the worst rates for state-supported Amtrak routes.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

RidershipEdit

File:Amtrak cascades ridership 1993-2024.png
Amtrak Cascades ridership 1993-2024.

Total ridership for 2008 was 774,421, the highest annual ridership since inception of the service in 1993.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Ridership declined in 2009 to 740,154<ref name="FY2010">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> but rose 13% in fiscal year 2010 to 836,499 riders,<ref name="FY2010" /> and to 847,709 riders in 2011.

Ridership declined steadily between 2011 and 2015, attributed in part to competition from low-cost bus carrier BoltBus, which opened a non-stop Seattle–Portland route in May 2012.<ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="Balk-2013">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Low gasoline prices and schedule changes due to track construction also contributed to the decline. Ridership rose again in 2016, and was expected to continue rising in 2017 and beyond, after the completion of the Point Defiance Bypass construction project.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> However, ridership declined again following the 2017 Washington train derailment, and the COVID-19 pandemic drastically reduced ridership numbers throughout the entire Amtrak network in 2020.

Ridership on the Cascades corridor reached a record high of over 941,000 passengers in 2024, a 41 percent increase from 2023.<ref name="BH-Ridership2024"/><ref name="FY2024"/>

Ridership by year
Year Ridership YoY Diff. YoY Diff. %
citation CitationClass=web

}}</ref>

941,727 +271,905 Template:Increase 40.6%
citation CitationClass=web

}}</ref>

669,820 +279,572 Template:Increase 71.6%
citation CitationClass=web

}}</ref>

390,248 +208,748 Template:Increase 115.0%
2021<ref name=":0"/> 181,500 -161,997 Template:Decrease 47.2%
citation CitationClass=web

}}</ref>

343,497 -459,398 Template:Decrease 57.2%
citation CitationClass=web

}}</ref>

802,895 -3,226 Template:Decrease 0.4%
citation CitationClass=web

}}</ref>

806,121 -3,929 Template:Decrease 0.5%
citation CitationClass=web

}}</ref>

810,050 +17,569 Template:Increase 2.2%
citation CitationClass=web

}}</ref>

792,481 +41,333 Template:Increase 5.5%
citation CitationClass=web

}}</ref>

751,148 -31,371 Template:Decrease 4.0%
2014 782,519 -29,443 Template:Decrease 3.6%
citation CitationClass=web

}}</ref>

811,962 -33,137 Template:Decrease 3.9%
2012 845,099 -7,170 Template:Decrease 0.8%
citation CitationClass=web

}}</ref><ref>{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref>

852,269 +15,970 Template:Increase 1.9%
citation CitationClass=web

}}</ref>

836,299 +74,689 Template:Increase 9.8%
citation CitationClass=web

}}</ref>

761,610 -12,921 Template:Decrease 1.7%
2008 774,531 +97,766 Template:Increase 14.4%
2007 676,765 +46,769 Template:Increase 7.4%
2006 629,996 -6,096 Template:Decrease 1.0%
2005 636,092 +33,033 Template:Increase 5.5%
2004 603,059 +13,316 Template:Increase 2.3%
2003 589,743 +5,397 Template:Increase 0.1%
2002 584,346 +23,965 Template:Increase 4.3%
2001 560,381 +30,163 Template:Increase 5.7%
2000 530,218 +77,884 Template:Increase 17.2%
1999 452,334 +27,196 Template:Increase 6.4%
1998 425,138 +75,377 Template:Increase 21.6%
1997 349,761 +45,195 Template:Increase 14.8%
1996 304,566 +17,910 Template:Increase 6.2%
1995 286,656 +106,447 Template:Increase 59.1%
1994 180,209 +86,148 Template:Increase 91.6%
1993 94,061

Rolling stockEdit

Template:See also

File:Union Station (12209479843).jpg
A Talgo Series 8 trainset departs Portland Union Station with the engineer controlling the train from the cab located inside the power car.

Service on the Cascades route is currently provided using equipment from Amtrak's national fleet, along with two articulated trainsets manufactured by Talgo. These cars are designed to passively tilt into curves, allowing the train to pass through them at higher speeds than a conventional train. The tilting technology reduces travel time between Seattle and Portland by 25 minutes.<ref name=":1" /> Current track and safety requirements limit the train's speed to Template:Convert, although the trainsets are designed for a maximum design speed of Template:Convert.<ref name=":1">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

File:AmtrakCascadesDiner.JPG
Inside a Talgo Series VI bistro car with a map of the Pacific Northwest (where the route travels) on the ceiling

A typical trainset consists of 13 cars: one baggage car; two "business class" coaches; one lounge car (also known as the Diner car); one cafe car (also known as the Bistro car); seven "coach class" coaches; and one combination cab/power car (which houses a driver's cab, a head-end power generator and other equipment). <ref name=":2">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Trainsets are typically paired with a Siemens Charger locomotive painted in a matching paint scheme. Additionally, trainsets without a cab car are paired with a Non-Powered Control Unit (NPCU), an older locomotive with no engine, that is also painted in a matching paint scheme and is used as a cab car.<ref name="solomon">Template:Solomon-Amtrak</ref>Template:Rp

The fleet consists of two Talgo Series 8 trainsets built in 2013. These trainsets operated alongside five older Talgo Series VI trainsets until their retirement in 2020. The service offered by the different trainset types is similar, but there are some minor differences between the two models. The most notable difference is the older Series VI trainsets have Template:Convert tail fins at both ends of the train that serve as an aesthetic transition from the low-profile trainsets and the larger locomotives.<ref name=":1" /> The Series 8 trainsets do not have the tail fins, but instead have a cab built into the power car allowing push-pull operation without a separate control unit. There are also minor differences in the interior appointments.

The Cascades service started in Fall 1998 with four Series VI trainsets; two were owned by the Washington State Department of Transportation (WSDOT) and two were owned by Amtrak. Each trainset was built with 12 cars and a six-car spare set, including a baggage car, service car, lounge car, café car and two "coach class" coaches, was also built. The trainsets can hold 304 passengers in 12 cars.

In 1998, Amtrak also purchased an additional Series VI trainset as a demonstrator for potential service between Los Angeles and Las Vegas. This trainset was built with two additional "coach class" coaches, for a total of 14 cars. The demonstration route was not funded and WSDOT purchased the trainset in 2004 to expand service.<ref name=":2" /> The purchase also allowed Amtrak and WSDOT to redistribute the "coach class" coaches. By using the two additional coaches from this new trainset and placing the two coaches from the spare set into regular service, the agencies were able to create four 13-car trains and one 12-car train.

In 2013, the Oregon Department of Transportation (ODOT) purchased the two Series 8 trainsets to enable further expansion of services.<ref>Oregon DOT</ref> Each trainset was equipped with 13 cars.

File:Amtrak Cascades Cabbage Car.jpg
Amtrak Cascades NPCU No. 90252 at Union Station in Portland, OR

The Cascades equipment is painted in a special paint scheme consisting of colors the agency calls Evergreen (dark green), Castilian Copper (brown), Nugget (tan) and Double Latte (cream).<ref name=":1" /><ref name="WSDOT train equipment">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The trainsets are named after mountain peaks in the Pacific Northwest (many in the Cascade Range). The four original Series VI trainsets were named after Mount Baker, Mount Hood, Mount Olympus, and Mount Rainier. The Series VI trainset built to operate between Las Vegas and Los Angeles (painted in Surfliner colors) was renamed the Mount Adams when it was purchased by the state of Washington. This trainset was subsequently destroyed in the December 18, 2017, derailment on the Point Defiance Cutoff. The two Series 8 trainsets are named Mount Bachelor and Mount Jefferson.

In early 2014, the Washington State Department of Transportation (WSDOT), awarded a contract to Siemens USA to manufacture 8 new Siemens Charger locomotives for the Cascades. The order was part of a larger joint purchase between Illinois, California, Michigan, and Missouri. These locomotives were delivered to WSDOT in Summer 2017 and went into service in late 2017.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The additional locomotives were to have enabled two additional runs to be added as part of the Point Defiance Bypass project (the additional service was suspended and its recommencement has not been announced) and will replace the six EMD F59PHI locomotives leased from Amtrak; these were sold to Metra in early 2018. One SC-44 locomotive was destroyed in the December 18, 2017, derailment on the Point Defiance Cutoff, but was soon replaced by a newly built Charger by Siemens (1408) in August 2020. In the wake of the accident, Amtrak proposed to lease or buy two Talgo trainsets which were originally bought for use in Wisconsin but never operated.<ref>Template:Cite journal</ref>

File:Wdtx1400 1.jpg
Amtrak Cascades train No. 505 in September 2020 with Horizon cars

In August 2019, the Federal Railroad Administration awarded WSDOT up to $37.5 million to purchase three new trainsets for the route, allowing the replacement of the older Talgo VI trainsets.<ref>Template:Cite press release</ref> The Talgo VI trainsets were withdrawn in June 2020.<ref>Template:Cite news</ref> As a temporary replacement, Horizon cars are being used alongside the existing Talgo Series 8 sets, until new cars are introduced.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The last two remaining Talgo VI trainsets were hauled to a scrapper on February 28, 2021.<ref>Template:Cite news</ref> One Series VI Bistro car, No. 7304, was later acquired by the Northwest Railway Museum in 2023.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>

File:Amtrak Cascades 7304.jpg
Series VI Bistro car No. 7304 is preserved at the Northwest Railway Museum.

Amtrak and Siemens Mobility announced a $7.3 billion national railcar order in July 2021, which includes funding for 48 new Siemens Venture coaches and 2 additional Charger locomotives for Cascades service.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Deliveries had been expected to begin in 2024, with the cars in service by 2026 after funding was approved by Congress. These trainsets will be used to replace the Talgo VI trainsets retired in 2020, as well as to expand service. The new coaches will be used in six-coach trainsets with a capacity of 300 passengers, far more than the capacity of the Talgo trainsets, and will be able to modify trainset lengths based on expected passenger demand. The new coaches are expected to cost WSDOT $150 million, of which $75 million has been secured as of July 2021. Additional funding is expected from the federal government, as well as potentially the governments of Oregon and British Columbia.<ref>Template:Cite news</ref> The eight new trainsets will use a new livery that includes imagery of Mount Rainier and Mount Hood; it is primarily green with brown and white as accent colors.<ref>Template:Cite news</ref>

Amtrak's entire Horizon fleet was removed from service on March 26, 2025, due to corrosion issues, leaving only a single Talgo trainset left to serve the Cascades route.<ref>Template:Cite news</ref> A second Talgo trainset had been damaged by a tree during an extratropical cyclone in November 2024.<ref>Template:Cite news</ref> Most scheduled Cascades trains were temporarily replaced with shuttle buses, including all service to Canada.<ref>Template:Cite news</ref> Some rail trips began to be restored in April 2025, with reduced capacity, after Amfleet cars arrived to replace the Horizons.<ref>Template:Cite news</ref> All trips were restored on April 6.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>

FundingEdit

Funding for the route is provided separately by the states of Oregon and Washington, with Union Station in Portland serving as the dividing point between the two.Template:Cn Template:As of, the Washington state government funds six daily round trips between Seattle and Portland and two daily round trips between Seattle and Vancouver, British Columbia.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Oregon funds two daily round trips between Eugene and Portland.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The seven trainsets are organized into semi-regular operating cycles, but no particular train always has one route.Template:Cn

Local partnershipsEdit

As a result of Cascades service being jointly funded by the Washington and Oregon departments of transportation, public transit agencies and local municipalities can offer a variety of discounts, including companion ticket coupons.

  • FlexPass and University of Washington UPass holders receive a 15% discount (discount code varies) on all regular Cascades travel. Employers participating in these programs may also receive a limited number of free companion ticket coupons for distribution to employees.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

  • The Sound Transit RailPlus program allows riders to use weekday Cascades trains between Everett and Seattle with the Sounder commuter rail fare structure.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

The Cascades service also benefits from Sound Transit's track upgrades for Sounder service, notably the Point Defiance Bypass project.

Related servicesEdit

The Cascades corridor is also served by Amtrak Thruway buses that are partially funded by the Washington state government and contracted out to MTRWestern. Amtrak introduced its first battery electric bus on the Cascades service in August 2023.<ref>Template:Cite news</ref>

Proposed changesEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} According to its long-range plan published in 2006, the WSDOT Rail Office plans eventual service of 13 daily round trips between Seattle and Portland and 4–6 round trips between Seattle and Bellingham, with four of those extending to Vancouver, British Columbia.<ref name="longrange">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Amtrak Cascades travels along the entirety of the proposed Pacific Northwest High Speed Rail Corridor; the incremental improvements are designed to result in eventual higher-speed service. According to WSDOT, the "hundreds of curves" in the current route and "the cost of acquiring land and constructing a brand new route" make upgrades so cost-prohibitive that, at most, speeds of 110 mph (177 km/h) can be achieved.<ref name="seatimes2011"/>

The eventual high-speed rail service according to the long-range plan should result in the following travel times:

  • Seattle to Portland – 3:30 (2006); 3:25 (after completion of Point Defiance Bypass);<ref name="seatimes2011"/> 2:30 (planned)
  • Seattle to Vancouver, British Columbia – 3:55 (2006); 2:45 (planned)
  • Vancouver, British Columbia, to Portland – 7:55 (2009); 5:25 (planned)

In order to increase train speeds and frequency to meet these goals, a number of incremental track improvement projects must be completed. Gates and signals must be improved, some grade crossings must be separated, track must be replaced or upgraded, and station capacities must be increased. The existing Columbia River Railroad Bridge between Vancouver, Washington and Portland would have to be modified, and an additional railroad bridge would have to be built next to the existing bridge.Template:R

Building upon previous studies, the long-range plan also proposed relocating the northern terminus from Vancouver's Pacific Central Station southeast to a "Greater Vancouver Terminal" near SkyTrain's existing Scott Road station in Surrey, British Columbia. In this scenario, northbound passengers would then ride the SkyTrain rapid transit system for about a half-hour to complete a trip to downtown Vancouver.Template:R<ref name="PAN20070306">Template:Cite news</ref><ref name="CGRS20021220">Template:Cite report</ref> The plan cited several motivations for terminus relocation, including: congestion at and near the New Westminster Bridge, which is a single-track railway subject to very low train speed limits and numerous bridge openings for marine traffic; lower-than-desired speed limits due to poor geological soil conditions underneath the BNSF track between the bridge and Pacific Central Station; bottlenecks at Canadian National Railway's Second Narrows Rail Bridge and Thornton Tunnel that cause northbound freight trains headed to the North Shore of the Burrard Inlet to back up onto and obstruct the BNSF main line; and repeated opposition to passenger service expansion from Canadian National Railway.<ref name="WSDOT200602OperatingCosts">Template:Cite report</ref>

In order to extend the second daily Seattle to Bellingham round trip to Vancouver, BNSF was required to make track improvements in Canada, to which the government of British Columbia was asked to contribute financially. On March 1, 2007, an agreement between the province, Amtrak, and BNSF was reached, allowing a second daily train to and from Vancouver.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The project involved building an Template:Convert siding in Delta, British Columbia, at a cost of US$7 million; construction started in 2007 and has been completed.

In December 2008, WSDOT published a mid-range plan detailing projects needed to achieve the midpoint level of service proposed in the long-range plan.<ref name="midrange">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In 2009, Oregon applied for a $2.1 billion Federal grant to redevelop the unused Oregon Electric Railway tracks, parallel to the Cascades' route between Eugene and Portland.<ref name="highspeed">Template:Cite news</ref> But it did not receive the grant. Instead, analysis of alternative routes to enable more passenger trains and higher speeds proceeded. In 2015, the current route, with numerous upgrades, was chosen by the Project Team as the Recommended Preferred Alternative.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Preferred Alternative, if built, would decrease the trip time by 15 minutes from 2 hours and 35 minutes to 2 hours and 20 minutes and increase the number of daily trains from 2 to 6 from Eugene to Portland.<ref>Template:Cite report</ref>

In 2013, travel times between Seattle and Portland remained the same as they had been in 1966, with the fastest trains making the journey in 3 hours 30 minutes.<ref>The Official guide of the Railways and Steam Navigation Lines of the U.S., Rand McNally & Company, May 1966</ref><ref>Amtrak Winter-Spring Timetable 2013</ref> WSDOT received more than $800 million in high-speed rail stimulus funds for projects discussed in the mid-range plan, since the corridor is one of the approved high-speed corridors eligible for money from ARRA.<ref name="stimulus">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The deadline for spending the stimulus funds is September 2017. The schedule was for the Leadership Council to vote on this in December 2015, then a Draft Tier 1 Environmental Impact Statement was to be released in 2016 and hearings held on it, for the Leadership Council to finalize the Recommended Selected Alternative in 2017, then publish the Final Tier 1 EIS and receive the Record of Decision in 2018.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Then if funds can be found, design and engineering must be done before any construction can begin.

In October 2023, WSDOT made public a summary of its preliminary service development plan, which offered five conceptual options for future rail service. Three of the options kept the top train speed at Template:Cvt, while the other two options increased the top speed to Template:Cvt. The most aggressive frequency option increased the number of round trips between Seattle and Portland to 16 and the number between Vancouver, British Columbia, and Seattle to 6. Four of the options included a rail/bus combination for some round trips between Vancouver and Seattle; the section between Seattle and Bellingham would be served by rail, while the section between Bellingham and Vancouver would be handled by bus.<ref name="TheUrbanist20231016">Template:Cite news</ref><ref name="WSDOT202310">Template:Cite conference</ref> The assumed maximum top speed was reduced from Template:Cvt in the 2006 long range plan to Template:Cvt in the 2024 preliminary service development plan based on BNSF restrictions.<ref name="WSDOT202406">Template:Cite report</ref>

Various jurisdictions have made attempts to add a stop within the approximately Template:Convert gap between Vancouver, British Columbia, and Bellingham. The intent was to better serve the growing population in the southern part of the Greater Vancouver region without requiring a backtrack to downtown Vancouver. Infill stations have been proposed on separate occasions at the international border towns of Blaine, Washington,<ref name="TNL20120328">Template:Cite news</ref> and White Rock, British Columbia,<ref name="PAN20110629">Template:Cite news</ref> which both had stops on Amtrak's predecessor Pacific International service.<ref name="EDR19720714">Template:Cite news</ref>

In 2024, a Canadian passenger rail advocacy group recommended that the Canadian government make 10 infrastructure improvements between White Rock and Vancouver at a total estimated cost of CAD$127.6 million. These improvements would increase operational performance and reliability, and the resulting reduction in travel time would permit Amtrak to add a Blaine stop.<ref name="BeyondHFR">Template:Cite report</ref>

Accidents and incidentsEdit

July 2017 derailmentEdit

On July 2, 2017, northbound train 506 derailed while approaching the Chambers Bay drawbridge southwest of Tacoma, Washington. The train was traveling above the speed limit of Template:Convert after passing an "Approach" signal (indicating that it be prepared to stop short of the next signal) at the bridge. As the bridge was raised and open, a device known as a "de-rail" was engaged, used to prevent a train from proceeding and falling in to the water by derailing it beforehand. The incident root cause was human error due to the engineer losing situational awareness. Only minor injuries were sustained due to the low speed at time of event as the engineer did attempt to stop on seeing the bridge up. The train's consist, an Oregon DOT-owned Talgo VIII set, was returned to the Talgo plant in Milwaukee, Wis. for repairs and returned to service in April 2018.<ref>Template:Cite news</ref>

December 2017 derailmentEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} On December 18, 2017, while making the inaugural run on the Point Defiance Bypass, southbound train 501 derailed near DuPont, Washington.<ref name="NYTimes">Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Three passengers were killed, and 65 people in total were injured. The crash occurred on an overpass over I-5, on a sharp curve with a speed limit of Template:Convert; train 501 was traveling at Template:Convert.<ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Positive train control, a system that would have prevented the train from speeding, was not yet enabled on the Point Defiance Bypass at the time of the crash. An investigation by the National Transportation Safety Board also found that the train's engineer was not properly trained on either the tracks or the train's Siemens Charger locomotive, both of which were new at the time.<ref>Template:Cite report</ref>

WSDOT announced that it would not resume service until the full implementation of PTC. Service was then scheduled to restart in early 2019.<ref>Template:Cite news</ref> PTC was activated on the Point Defiance Bypass in March 2019, but Cascades service on the bypass did not resume until November 18, 2021, almost four years after the derailment.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>