Tseung Kwan O line
Template:Short description Template:Use dmy dates Template:Use Hong Kong English Template:Infobox rail line Template:Chinese The Tseung Kwan O line (Template:Zh) is one of the ten lines of the MTR system in Hong Kong. It is currently Template:Convert long, taking 15 minutes to travel throughout the entire line. It is indicated in Template:Ifsubst style="color:#Template:Rcr">Purple on the MTR map.
The line runs from North Point on the Hong Kong Island to the new town of Tseung Kwan O. It bifurcates east of Tseung Kwan O station into two branches, one northward to Po Lam and one southward to LOHAS Park. The Tseung Kwan O Depot at LOHAS Park is responsible for the maintenance of the line's rolling stock.
During the morning peak period, the Tseung Kwan O line uses 15 trains to maintain a frequency of 2.5 minutes between Tseung Kwan O and North Point.
Route mapEdit
Route descriptionEdit
The Tseung Kwan O line is the first MTR line with no tracks on viaducts. It was the only line with tracks completely in tunnels until the completion of LOHAS Park station, which there are two short sections nearby that are not in tunnels. The stations of Yau Tong, Po Lam and LOHAS Park are at ground level, but are completely shielded to minimise noise to the surrounding development. The rest of the line has its tracks located underground.
The western terminus of the line is North Point, providing cross-platform interchange with the Island line. However, the next station, Quarry Bay, still interchanges with the Island Line but does not provide such a cross-platform interchange. East of Quarry Bay, the line passes under Victoria Harbour to Yau Tong station, a station serving the East Kowloon neighbourhood of the same name, using the rail tunnel of the Eastern Harbour Crossing. From Yau Tong, the line passes through the Black Hill Tunnels to enter Tseung Kwan O New Town at Tiu Keng Leng.
Within Tseung Kwan O new town, the line splits into two branches east of Tseung Kwan O station. One branch reaches Hang Hau and Po Lam stations in the northern part of the new town, whereas the southward branch connects LOHAS Park station in Area 86. LOHAS Park is a large residential development built above the Tseung Kwan O Depot, where the trains of the line are maintained.
Train operationsEdit
Operation of the line is relatively complex because of the split into two branches at Tseung Kwan O.
The majority of trains on the line run through from Po Lam to North Point and vice versa. Through service between LOHAS Park and North Point is only provided during rush hour; during non-peak periods, LOHAS Park is only served by "shuttle trains" that terminate at Tiu Keng Leng, operating at 12-minute intervals. Passengers travelling to and from LOHAS Park during non-peak hours are required to change trains at Tiu Keng Leng or Tseung Kwan O in order to continue their journey.
Train headways are as follows:
- Rush hour: One through train to/from LOHAS Park after two trains to/from Po Lam
- North Point - Po Lam trains: every 2.5 or 4 minutes
- North Point - LOHAS Park trains: every 7–8 minutes
- combined headway between North Point and Tseung Kwan O is 2.5 minutes.
- Non-peak period:
- Mon-Fri, Sat (10:00-20:00) and Sun (09:00-20:00)
- North Point - Po Lam trains: every 4 minutes
- Tiu Keng Leng - LOHAS Park shuttle trains: every 12 minutes
- No through service from LOHAS Park to North Point, vice versa
- Every day between 20:00 and 00:00
- North Point - Po Lam trains: every 5 minutes
- Tiu Keng Leng - LOHAS Park shuttle trains: every 12 minutes
- No through service from LOHAS Park to North Point, vice versa
- Every day after 00:00
- North Point to Po Lam trains: every 6 minutes
- Po Lam to North Point trains: every 8–9 minutes
- Tiu Keng Leng - LOHAS Park shuttle trains: every 12 minutes
- Mon-Fri, Sat (10:00-20:00) and Sun (09:00-20:00)
HistoryEdit
The Tseung Kwan O line was planned to serve the new town of Tseung Kwan O and was first proposed in 1981 as part of the Junk Bay New Town Transport Study.<ref>《Junk Bay New Town Transport Study·RAIL TRANSPORT - ALTERNATIVE ALIGNMENTS》</ref> The report proposed four corridors, all of which called for the Kwun Tong line to be extended to Lam Tin station and placed the terminus of the Tseung Kwan O line at the vicinity of Tsui Ping Estate.<ref>《Junk Bay New Town Transport Study· POSSIBLE MASS TRANSPORT ACCESS ROUTES》</ref> The construction cost was estimated at HK$3 billion.<ref>Template:Cite newsTemplate:In lang</ref> The construction of the Tseung Kwan O line was approved by the Hong Kong Government in 1985 and under the 1985 plan, a Template:Convert branch line from Lam Tin station to Tseung Kwan O station, consisting of 5 or 6 stations, was to be built beginning in 1992 and to open by the end of 1996.<ref name="Ta Kung Pao19871225">Template:Cite newsTemplate:In lang</ref> This plan was cancelled by the MTR Corporation in August 1990.<ref>Template:Cite newsTemplate:In lang</ref>
MTR re-proposed the line in 1993, and the plan was approved by the Hong Kong Executive Council on 20 October 1998. Construction commenced on 24 April 1999 and the line opened on 18 August 2002, at a cost of HK$18 billion.<ref>Template:Cite newsTemplate:In lang</ref> The new line took over the cross-harbour segment, via the Eastern Harbour Crossing to North Point station, from the Kwun Tong line. The Kwun Tong line was extended to Yau Tong and Tiu Keng Leng stations to interchange with the new line.
File:Mtr eht en.png Realignment of Kwun Tong line upon the inauguration of Tseung Kwan O line |
TrainsEdit
The line is served by the K-Stock and M-Trains. The K-Stock trains were manufactured by a consortium of Hyundai Rotem and Mitsubishi Corporation, and were expected to be quieter and to use energy generated from deceleration.
Although tailor-made for the line, the K-Stock trains actually ran on the Kwun Tong line temporarily from launch through April 2010, and the original M-Trains ran on this line instead. The K-Stock trains were finally transferred to this line in April 2010.
MTR Tseung Kwan O line Rolling stock | |||||
---|---|---|---|---|---|
Model | Manufactured | Time of manufacturing | Sets | Assembly | Notes |
M-Train | Metro-Cammell | 1977-1986 1989-1995 |
7 | A-C+D+B-C+D+C-A | |
K-Train | Rotem and Mitsubishi | 2001-2002 | 13 | A-C-B+B-C+B-C-A | |
MTR Tseung Kwan O line Former rolling stock | |||||
Model | Manufactured | Time in manufacturing | Sets | Assembly | Notes |
C-Train | CNR Changchun | 2010-2013 | N/A | A-C-B+B-C+B-C-A | now used on Kwun Tong line |
StationsEdit
This is a list of the stations on the Tseung Kwan O line.
List
NotesEdit
Future developmentEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} The Tseung Kwan O line will probably be extended to Tamar station and interchange with an extended Tung Chung line there. This is according to the "interchange scheme" devised for the North Island line, which would also see the line serve stations at Fortress Hill, Causeway Bay North and Exhibition Centre, the latter of which would provide a connection with the Sha Tin to Central Link extension of the North South Corridor (East Rail Line to Admiralty). Construction is not expected to begin before 2021.
Under an earlier proposal, called the "swap scheme", the line would have taken over the section of the Island line from Fortress Hill to Kennedy Town; with the remaining section east of Tin Hau being transferred to the Tung Chung line. This was rejected as the existing Island line would be interrupted and require an interchange.
In the Chief Executive's 2022 Policy Address, it was announced that the Tseung Kwan O line would be extended southwards to Tseung Kwan O Area 137, an 80 hectare plot of land the Development Bureau has identified suitable for the development of 50,000 new housing units. Area 137 is expected to take in new populations in 2030, but there has been no expected timeline for the completion of the extensions or the opening of the new station.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>
See alsoEdit
ReferencesEdit
External linksEdit
{{#invoke:Navbox|navbox}} Template:Tseung Kwan O Line navbox Template:North Island Line navbox Template:Crossings navbox Template:Authority control