Warragamba Dam is a heritage-listed dam in the outer South Western Sydney suburb of Warragamba, Wollondilly Shire in New South Wales, Australia. It is a concrete gravity dam, which creates Lake Burragorang, the primary reservoir for water supply for the city of Sydney. The dam wall is located approximately Template:Convert W of Sydney central business district, 4½ km SW of the town of Wallacia, and 1 km NW of the village of Warragamba.

The dam was devised as part of a collective engineering response to Sydney's critical water shortage during World War II and was originally known as the Warragamba Emergency Scheme. Constructed between 1948 and 1960, the dam created capacity for a reservoir of Template:Convert and is fed by a catchment area of Template:Convert. The surface area of the lake covers Template:Convert of the now-flooded Burragorang Valley. It was designed and built by the Metropolitan Water Sewerage and Drainage Board. A small hydroelectric power station was incorporated into the design of the dam but has been disconnected from the grid since 2001.

The property is owned by WaterNSW, an agency of the Government of New South Wales. The dam was added to the New South Wales State Heritage Register on 18 November 1999.

Drought has severely depleted the level of the dam at times: on 8 February 2007 it recorded an all-time low of 32.55555555% of capacity. On 2 March 2012, it overflowed for the first time in fourteen years. It overflowed again in 2016, March 2021,<ref name=abc-overflow-21-mar-'21/> March 2022<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and April 2024.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

HistoryEdit

One of the first places in the Gundungurra traditional homelands that most appealed to the Anglo-Celtic settlers were the river flats of the Burragorang Valley (now flooded under Lake Burragorang). Even before the valley was officially surveyed in 1827-1828, many early settlers were already squatting on blocks that they planned to officially occupy following the issue of freehold title grants. From the Burragorang Valley and using Aboriginal pathways, other valleys to the west were occupied and developed by the settlers with construction of outstations and stock routes. These cattle entrepreneurs were then followed by cedar-wood extractors and miners.<ref name=nswshr-1376/>

In 1845, Paweł Strzelecki drew attention to the Warragamba River as a water supply catchment; in 1867, supporters proposed a dam.<ref name="Aird" />

The Gundungurra traditional owners resisted the taking of their lands, and, relying on various laws of the colony at the time, continually applied for official ownership. Although their individual claims failed, in some kind of recognition of the significance of the designated tracts of land claimed, six Aboriginal Reserves (under the control of the NSW Aborigines Protection Board) were formally declared in the Burragorang Valley. Even after these reserves were revoked, many of the traditional owners remained, quietly refusing to leave their traditional homelands.<ref name=nswshr-1376/>

Finally pushed into the "Gully", a fringe development in West Katoomba from about 1894, the Gully community stayed together for more than 60 years until dispossessed of the Gully by the then Blue Mountains Shire Council so a group of local businessmen could develop a speedway that became known as the Catalina Race Track. The Gully people kept talking about areas of land they had walked in as children – the nearby Megalong and Kanimbla Valleys and the Burragorang Valley. They knew of the profound significance of these valleys for their parents and grandparents.<ref name=nswshr-1376-1983>Johnson, 2009, 4.</ref><ref name=nswshr-1376/>

Between 1867 and 1946, supporters of Strzelecki's proposal proposed various schemes before the site and design of the current dam received approval.<ref name="Aird" />

Warragamba Emergency SchemeEdit

In 1910, Ernest de Burgh, Chief Engineer for Water Supply and Sewerage, in the NSW Public Works Department prepared a proposal for a dam on the Warragamba River and followed it up in 1918 with more detailed plans. His proposals were passed onto the newly formed Metropolitan Water and Sewerage and Drainage Board in 1925 when it took over from the P.W.D. The completion of the Warragamba Emergency Scheme required during its peak 1,000 waged employees at the Headworks, and a further 1,000 on the Pipeline. All buildings used in the construction of the Emergency Scheme were designed for later re-use as cottages for the future maintenance and operations personnel. Some of these buildings were relocated from elsewhere. The main works office was the original police station at the Nepean Dam site.<ref name=nswshr-1376/>

In 1940, a weir and water pumping station, known as the Warragamba Emergency Scheme, reached completion, just downstream of the main dam site,<ref name="Aird" /> located on the east bank of the Warragamba River. Access to the site was along the road currently known as Weir Road. Major elements of the construction works still extant include the weir, a 10-cable cableway, shads, batching plants, roads, electrical substation, chlorination plant, maintenance staff accommodation, balance reservoir, Megarritys Bridge, water pumping station, tunnels, and associated pipelines.<ref name=nswshr-1376/>

1948–1960: construction of current damEdit

In 1943 the Metropolitan Water, Sewerage and Drainage Board invited the geologist William Browne to investigate a proposed site. Browne found a more suitable site and continued as geological adviser until completion.<ref>Template:Cite Australian Dictionary of Biography</ref> The site was reviewed and approved by Dr John Savage, considered the pre-eminent expert in this field, and formally accepted by the Metropolitan Water, Sewerage and Drainage Board on 2 October 1946.<ref name="Aird" /> The Board appointed Thomas Upton as the engineer.

The Warragamba River flows through a gorge that varies in width from Template:Convert, and is Template:Convert in depth. This gorge opens at its upper end into a large valley, the Burragorang Valley. This river configuration allows for a relatively short but high dam wall, in the gorge, to impound a vast quantity of water.<ref name="Aird">Template:Cite book An account of the development and history of the water supply, sewerage, and drainage systems of Sydney and the near south coast from their beginnings with the first settlement to 1960.</ref>

Dam construction began in 1948 and was completed in 1960. The resulting dam of the Warragamba River formed Lake Burragorang, which is one of the largest reservoirs for urban water supply in the world.Template:Citation needed

The dam wall comprises Template:Convert of concrete. It was laid as interlocking blocks roughly Template:Convert on each side, which were later grouted together to form a continuous, monolithic wall. It is so large that engineers had to use two techniques to prevent the temperature from becoming too hot as the concrete set. One was to add ice to the wet concrete, the first application of this technique in Australia. The other was to embed cooling pipes into the concrete and circulate chilled water through the pipes. As a result, the dam wall was cooled in a few months instead of the estimated 100 years it would have taken to cool naturally.<ref name="Aird" />

Description and recent worksEdit

The dam impounds the Coxs, Kowmung, Nattai, Wingecarribee, Wollondilly, and Warragamba rivers, within the Hawkesbury-Nepean catchment.<ref name=sca>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The dam created capacity for a reservoir of Template:Convert and is fed by a catchment area of Template:Convert. The surface area of the lake covers Template:Convert of the now flooded Burragorang Valley.<ref name=sca/>

SpillwayEdit

Template:Wide image The main spillway has five crest gates: A central drum gate with a Template:Convert clear span with a pair of radial gates on each side. Each radial gate has a Template:Convert clear span. The drum gate is hinged along the upstream edge to the upstream crest and lowers into the dam wall to allow water to flow over it. When it is fully open, it forms a continuation of the crest profile.<ref name="Aird" /> All gates open automatically as the dam passes full water level, or can be manually opened.<ref name="Aird" /><ref name="myths">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The auxiliary spillway is normally closed by a series of fuse plugs that are designed to be washed away in the event of an extreme flood event.<ref name=aux/>

As originally designed, the dam could safely withstand a peak inflow of Template:Convert, leading to a peak discharge of Template:Convert down the spillway.<ref name="Aird" /> Following a 1987 and 1989 re-evaluation of the potential rainfall and flood risks, the New South Wales Government authorised for the dam wall to be raised by Template:Convert and constructed an auxiliary spillway on the east bank of the dam.<ref name="myths" />

Power generationEdit

There was also a hydroelectric power station at the dam that could generate Template:Convert,<ref name="Warragamba Hydro">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> transmitting its output over a 132 kV transmission line to a Penrith Substation. Water levels very rarely became high enough to allow operation of the generators. By 2001, it was rarely used and was disconnected from the electricity grid.<ref name=EEar>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

21st century re-engineering and enhancementsEdit

In 2006, the Warragamba Deep Water Storage Recovery Project, part of the Metropolitan Water Plan, penetrated the base of the dam wall to allow the previously inaccessible lowest water in the reservoir to be available. This new outlet was below the minimum level required for gravity flow, which delivered water from the existing outlets. The project constructed a new pumping station downstream of the dam. The new pumping station is within the Emergency Scheme pumping station chamber. This project provided access to eight per cent more water or approximately six months of extra supply. On 15 April 2006, the project reached a major milestone when it increased the available storage from Template:Convert to Template:Convert.<ref name=sca/>

Enhancements to the dam were completed in 2009, including the addition of an auxiliary spillway to manage extreme flood events.<ref name=aux>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Other recentTemplate:When major work includes a complete upgrade of the three passenger lifts within the dam wall, an upgrade of the travelling crest crane and a complete upgrade of the four water supply outlets in the valve house, which includes the replacement of the major valves.Template:Citation needed

Proposed raising of dam wallEdit

Since 2017, WaterNSW has been working on a risk-mitigation project, aimed at protecting human life and property in the floodplain catchment area in case of major flooding, primarily by raising the dam wall by up to Template:Convert.<ref name="Cox Morton 2020"/> Infrastructure NSW's rationale is based on the fact that up to 134,000 people live and work on the floodplain, and urban growth could greatly increase this number in decades to come; giving the dam a greater capacity would enable holding back floodwaters before releasing it in a controlled fashion, reducing the need for urgent evacuations.<ref name="Cox Morton 2020">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

However, there are concerns for the more than 50 recognised Aboriginal heritage sites in the Template:Convert of World Heritage Area that would be flooded, parts of which were badly burnt in the 2019–2020 bushfires in Australia. The box gum grassy woodlands are home to threatened species of birds, including up to 50% of the remaining population of the critically endangered regent honeyeater, as well as koalas and greater gliders.<ref name=cox11sep2020>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In September 2020, the New South Wales Government was ordered by the federal Department of Agriculture, Water and the Environment to re-do their Indigenous heritage work, concerned that NSW has not adequately addressed the concerns of Gundungurra and other traditional owners in their cultural heritage surveys.<ref name=calderwood>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The federal review also said that the environmental impact assessment lacked detail on how the project could affect species such as the platypus and echidna. Engineering experts have also questioned the modelling done by Infrastructure NSW.<ref name=cox18sep>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In April 2024, after the seventh flood in 18 months in northwestern Sydney, the NSW water minister Rose Jackson proposed the idea of lowering Warragamba Dam's storage and supplementing it with desalinated water to decrease flood danger in Sydney's north-west. The plan would mean a proportion of the dam's capacity would be brushed aside for flood mitigation. According to her, this will be cheaper than raising the dam's wall by 14 metres (a proposal scrapped by the Labor government in 2023). University of Sydney water expert, Professor Stuart Khan stated that the Sydney Desalination Plant can produce 90 gigalitres of water a year, which would drop 40% of the dam's capacity.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

CatchmentEdit

The catchment area is Template:Convert. The areas closest to the lake, making up around 30% of the total catchment, are restricted access special areas. Most of the rest

Although the engineers did not design Warragamba Dam as a flood control measure, it can mitigate flooding by holding floodwaters back while the reservoir fills.Template:Citation needed

Dam level crises and water restrictionsEdit

There have been times when drought has seriously depleted the dam. In March 1983, Lake Burragorang's level reached a low of 45.4% of capacity, only to reach the maximum level in the mid-1990s; as a consequence, the gates were opened (there was a significant spill in August 1998<ref name=cox18sep/>). Between 1998 and 2007 the catchment area experienced extremely low rainfall (in December 2004, the dam dropped to 38.8% of capacity, the lowest on record to date<ref name=abc2004>Warragamba Dam hits lowest level by ABC News Friday, 10 December 2004</ref>) and on 8 February 2007 it recorded an all-time low of 32.5% of capacity.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The New South Wales State Government tried to reduce this risk by implementing water restrictions<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and commissioned the construction of a desalination plant, at Kurnell. Heavy rains between June 2007 and February 2008 restored the dam level to around 67%. Despite this, Level 3 water restrictions remained in place until 21 June 2009.<ref name="overflow"/>

On 30 February 2012, it was reported that the dam was likely to overflow for the first time in fourteen years, due to continuing heavy rain in the region.<ref name="overflow">Template:Cite news</ref> The dam began spilling at 18:53 (AEDT) on 2 March 2012 and again on 20 April 2012.<ref name=scan>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="spill2March">Template:Cite news</ref><ref name="spill20April">Template:Cite news</ref><ref name=cox18sep/>

The dam reached full capacity on 17 August 2020, compared with it being less than half full a year previously.<ref name="Cox Morton 2020"/> During a days long severe weather event, affecting much of New South Wales, it overflowed for the first time since 2016 on 20 March 2021.<ref name=abc-overflow-21-mar-'21>Template:Cite news</ref> In March 2022, following heavy rains across NSW and Queensland, the dam once again overflowed, flooding areas downstream.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Warragamba Dam again reached 100% capacity on 26 November 2021 and began spilling following a prolonged period of rain in NSW.<ref>Template:Cite news</ref>

Statistical overviewEdit

Template:Columns-start

Key dam structures
Height Template:Convert
Length Template:Convert
Thickness at top Template:Convert
Thickness at base Template:Convert
Width of central spillway Template:Convert
Width of auxiliary spillway (at mouth) Template:Convert
Length of auxiliary spillway Template:Convert
Hydro-electric plant capacity Template:Convert

Template:Column

Key reservoir statistics
Available storage (when full) Template:Convert
Total capacity (when full) Template:Convert
Surface area Template:Convert
Length of lake Template:Convert
Length of foreshores Template:Convert
Deepest point Template:Convert
Catchment area Template:Convert
Average annual rainfall Template:Convert

Template:Columns-end

Access and recreationEdit

Warragamba Dam was a popular picnic spot for Sydneysiders, but access to the public was restricted after 1999 due to A$240 million of upgrades in that time. It reopened to the public on 8 November 2009.<ref>Template:Cite news</ref>

Access to the dam wall and terrace gardens opened from 23 December 2012 to 28 January 2013 at weekends and public holidays.

Heritage listingEdit

The Emergency Scheme is representative of the collective engineering response to Sydney's critical water shortage during the Second World War period. It was the first stage in the storage and extraction of water from the Warragamba River, and was preliminary to the Waragamba Dam. All of the components are excellent examples of the civil engineering skills of the times; the Balance Reservoir is particularly significant because it provides a stilling pool downstream of Warragamba Dam for the purpose of flood discharge; the group of five cottages associated with the construction of the dam are considered to be of high significance because they housed the operations staff between 1940 and 1959. These have since been incorporated into the Warragamba township, one of the largest townships in the Shire of Wollondilly.<ref name=nswshr-1376/>

The Warragamba Emergency Scheme was listed on the New South Wales State Heritage Register on 18 November 1999, having satisfied the following criteria:<ref name=nswshr-1376>Template:Cite NSW SHR</ref>

  • The place possesses uncommon, rare or endangered aspects of the cultural or natural history of New South Wales.
  • This item is assessed as historically rare statewide and as well as scientifically rare statewide.<ref name=nswshr-1376/>

In popular cultureEdit

  • Warragamba Slammer is a popular phrase used in Australian pubs and restaurants throughout Greater Sydney as a reference to tap water.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

See alsoEdit

Template:Stack

ReferencesEdit

Template:Reflist

BibliographyEdit

  • {{#invoke:citation/CS1|citation

|CitationClass=web }}Template:Dead link

  • {{#invoke:citation/CS1|citation

|CitationClass=web }}

AttributionEdit

Template:NSW-SHR-CC

External linksEdit

Template:Commons category-inline

Template:WaterNSW Template:The Hawkesbury River Template:Sydney landmarks Template:Authority control