Controlled-access highways in Poland are part of the national roads network and they are divided into motorways and expressways. Both types of highways feature grade-separated interchanges with all other roads, emergency lanes, feeder lanes, wildlife crossings and dedicated roadside rest areas. Motorways differ from expressways in their technical parameters like designated speed, permitted road curvature, lane widths or minimal distances between interchanges. Moreover, expressways might have single-carriageway sections in case of low traffic densities (as of 2025, such sections constitute 3.5% of the highway network).

The development of modern highways began in the 1970s, but proceeded very slowly under the communist rule and for the first years afterwards: between 1970 and 2000 only 434 km of highways were constructed in total (5% of the planned network).<ref>Here and in the following figures, construction of 1st or 2nd carriageway is accounted as half-length for consistency of the summed results. Sections constructed by Nazi Germany are accounted for the dates of their reconstruction to modern highways.</ref> Further 1050 km (13% of the network) were opened from 2001 to 2010, followed by 2773 km (34% of the network) constructed between 2011 and 2020.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> It is planned to open about 2500 km (31%) in the 2020s, while the last about 1400 km (17%) would be completed in the 2030s.<ref name="pbdk_2033"/>

Template:As of, there are 5205.5 km<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> of motorways and expressways in operation (62% of the intended network), while contracts for construction of further 1349 km<ref>Including design–build contracts; see the List of motorways and expressways for details on the phases of construction and design.</ref><ref name="gddkia_contracts'_completion_dates"/> (16% of the network) are ongoing.

Except for the single-carriageway expressways, both types of highways fulfill the definition of a motorway as specified by OECD, WRA or Vienna Convention. Speed limits in Poland are 140 km/h on motorways and 120 km/h on expressways (100 km/h for single-carriageway expressway sections). Some motorway stretches are tolled.

Technical parametersEdit

  1. Expressways are designated for lower speed than motorways. For example, the road curvature can be more severe and the lanes are usually narrower (3.5Template:Nbspm vs 3.75Template:Nbspm). Emergency lanes are also narrower (2.5Template:Nbspm vs 3Template:Nbspm) and in exceptional situations expressways might not have them at all.
  2. Expressways can have a single carriageway on sections with low traffic density.
  3. Motorways can have interchanges only with main roads, and the distance between interchanges is typically not less than 15 km (or 5 km near major cities), while expressways typically have more frequent interchanges. In exceptional situations, expressways might not have dedicated feeder lanes on interchanges.<ref name="rozp2022"/>

List of motorways and expresswaysEdit

In 2004, the government published the ordinance defining the planned highway network of length about Template:Cvt.<ref name="rozp2004">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Notable changes introduced in later amendments include re-routing S8 and adding S61 instead (a change related to the Rospuda Valley conflict),<ref name="rozp2009">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> introducing S16, S52 and A/S50,<ref name="rozp2019">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> as well as extending S5,<ref>to Ostróda in 2015 and to Bolków in 2019</ref> S8<ref>to Kłodzko in 2019</ref> and S10,<ref>to Wołomin in 2015</ref> raising the total length to about Template:Cvt.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="rozp2019"/>

The planned network consists of 16 major highways (over 200 km of intended length): A1, S3, S5, S7, S11, S17, S19, S61 running north to south and A2/S2, A4, S6/A6, S8/A8, S10, S12, S16, S74 running west to east, as well as 9 shorter highways:Template:EfnTemplate:Efn <ref name="ongoing_gddkia's_contracts"> {{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="map_of_ongoing_constructions"> {{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="map_of_ongoing_constructions_english"> {{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="gddkia_planned_construction_dates"> {{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="pbdk_2033">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

File:Znak D9.svgFile:PL road sign D-7.svg
1) Highways and major sections completed
Sign Route Location Total length Existing Years of opening
A1 Gdańsk (S6) - Grudziądz (S5) - Toruń (S10) - Template:Nowrap - Template:Nowrap - Template:Nowrap - Template:Nowrap File:NowaMapaA1.svg 566.6 km 566.6 km 100% Template:Nowrap
Template:Efn
A2
S2
Main section:
Template:Nowrap - S3 - Poznań Template:Nowrap - Template:Nowrap - Template:Nowrap
File:NowaMapaA2.svg 489.7 kmTemplate:Efn File:Znak D9.svg 454.9 km
File:PL road sign D-7.svg 34.8 km  
100% mainly
Template:Nowrap
Template:Efn
S3 Main section:
Szczecin (A6) - Template:Nowrap - A2 - Zielona Góra - Legnica (A4) - Template:Nowrap
File:NowaMapaS3.svg 368.7 kmTemplate:Efn 368.7 km
of which 3 km near the Czech border remain closed until connecting D11 is constructed
100% 2010 – 2024
Template:Efn
A4 Template:Nowrap - Template:Nowrap - Template:Nowrap - Opole - Template:Nowrap - Template:Nowrap - Template:Nowrap - Template:Nowrap - Template:Nowrap File:NowaMapaA4.svg 669 km 669 km
Template:Nowrap Template:Nowrap
100% 1983 – 2016
S5 Main section:
Template:Nowrap - Template:Nowrap
File:NowaMapaS5.svg 340.3 kmTemplate:Efn 340.3 km 100% 2012 – 2022
Template:Efn
S8
A8
Main section:
Wrocław (A4) - Łódź (A1) - Template:Nowrap - Warsaw Template:Nowrap - Template:Nowrap
File:NowaMapaS8.svg 548.2 kmTemplate:Efn File:PL road sign D-7.svg 525.5 km
File:Znak D9.svg 22.7 km  
100% 2008 – 2019
Template:Efn
S14 Łódź western bypass Template:Nowrap Łódź 40.2 km 40.2 km
Template:Nowrap Template:Nowrap
100% 2012 – 2023
S17 Main section:
Warsaw (A2) – Lublin (S12/S19)
File:NowaMapaS17.svg 150 kmTemplate:Efn 150 km 100% 2013 – 2020
Template:Efn
A18 Template:NowrapTemplate:Nowrap File:NowaMapaA18.svg 76.5 km 76.5 km
Template:Nowrap Template:Nowrap
100% 2006, 2022/2023
Template:Efn
S22 Template:Nowrap File:NowaMapaS22.svg 52.2 km Template:Nowrap single carriageway 50% 2008Template:Efn
S51 Olsztyn (S16) – Olsztynek (S7) File:NowaMapaS51.svg 20.3 km 20.3 km 100% 2012, 2019
File:S52-PL.svg Kraków northern bypass Template:Nowrap Kraków 18.3 km 18.3 km 100% 1986 – 2024
S79 Template:Nowrap Warsaw 4.8 km 4.8 km 100% 2013
S86 Template:Nowrap Upper Silesia 5.9 km 5.9 km 100% 1985
File:Znak D9.svgFile:PL road sign D-7.svg
2) Highways in development
Sign Route Location Total length Existing Construction commencedTemplate:Efn Of which under active construction Scheduled years of opening<ref name="gddkia_contracts'_completion_dates">{{#invoke:citation/CS1|citation CitationClass=web

}}</ref>

Tender In preparationTemplate:Efn
S1 Katowice Airport (A1) - Mysłowice (A4) - Bielsko-Biała (S52) - Template:Nowrap File:NowaMapaS1.svg 144 km Template:Nowrap
Template:Nowrap
59%
(64.9%)
4.8 km
+ 3.7 km single carriageway
2025
(+ 39.5 km)
dual carriageway road
(94.1%) + 39.5 km
(new route)
2026
A2 Eastern section:
Template:Nowrap
File:NowaMapaA2.svg 168.2 km 72.1 km 42.9% 63.8 km 2025, 2029? 25.5 km 6.8 km
S3 Northern section:
Template:NowrapTemplate:Nowrap
File:NowaMapaS3.svg 85.4 km 50.9 km
+ 5.4 km 1st carriageway
62.8% 29.1 km
+ 5.4 km 2nd carriageway
2025
S6
A6
Template:Nowrap - SzczecinTemplate:Efn - Goleniów (S3) - Koszalin (S11) - Słupsk Template:Nowrap File:NowaMapaS6.svg 453.2 km File:Znak D9.svg 28.1 km  
File:PL road sign D-7.svg 228.4 km
+ 9.4 km 1st carriageway
64.9% 136.5 km
+ 9.4 km 2nd carriageway
2025, 2026
Szczecin western bypass 0 km 0% 2028?, 2032? 50.8 km
S7 Gdańsk (A1)Template:Efn - Elbląg (S22) - Olsztynek (S51) - Template:Nowrap File:NowaMapaS7.svg approx. 709 km Template:Nowrap 82.7%
45 km
(Template:Nowrap Template:Nowrap are open to traffic on the whole length of the reconstruction site)
2025, 2026,
2027,  2032?
Template:Nowrap (reconstruction
Template:Nowrap
(+ 58 km)
Template:Nowrap
(100%)
Warsaw Template:Nowrap - Radom (S12) - Kielce (S74) - Kraków (A4) Template:Nowrap
+ 0.4 km 1st carriageway
98% 5.3 km
+ 0.4 km 2nd carriageway
2025, 2026
(+ 12.5 km)
Template:Nowrap
(100%)
Kraków (A4) - Rabka-Zdrój - Template:NowrapTemplate:Efn Template:Nowrap 34.6% partial reconstruction to grade-separated Template:Nowrap are open to traffic) 2030?, 2032?, 2038?Template:Efn Template:Nowrap Template:Nowrap
(+ 25 km)
Template:Nowrap
(62%)
S12 Eastern section:
Lublin (S17/S19) - Chełm - Template:Nowrap
File:NowaMapaS12.svg 103.7 kmTemplate:Efn 29.2 km 28.2% 68.8 km 14 km 2026, 2027, 2031? 5.7 km
S17 Eastern section:
Lublin (S12/S19) - Zamość - Template:Nowrap
File:NowaMapaS17.svg 126 kmTemplate:Efn 9.6 km
+ 2 km 1st carriageway
8.4% 92 km 17 km 2027, 2028,
2029?, 2030?
22.3 km
+ 2 km 2nd c/w
S19
Via Carpatia
Template:Nowrap - Białystok (S8) - Lublin (S12/S17) File:NowaMapaS19.svg 572.5 km 18.5 km
1st carriageway
2.9% 229.9 km
Template:Nowrap 2nd carriageway
87.8 km
Template:Nowrap 2nd carriageway
2025, 2026, 2027,
2028, 2029?, 2030?
69.4 km
Template:Nowrap 141.7 km
Template:Nowrap
Template:Nowrap
94.8%
(100%)
16.3 km
2nd carriageway
2026
Rzeszów (A4) – Template:Nowrap 11.4 km 11.8% 85.2 km 42.6 km 2026, 2027,
Template:Nowrap
S61
Via Baltica
Ostrów Mazowiecka (S8) - Łomża - Ełk (S16) - Suwałki - Template:Nowrap File:NowaMapaS61.svg 210.7 km 197.8 km
+ 12.9 km 1st carriageway
93.9%
(100%)
12.9 km
2nd carriageway
2025
File:PL road sign D-7.svg
3) Highways partially in development
Sign Route Location Total length Existing Construction commenced Of which under active construction Tender Template:Nowrap complete In preparationTemplate:Efn Planned Template:Shy <ref name="gddkia_planned_construction_dates"/><ref name="pbdk_2033_progress">{{#invoke:citation/CS1|citation CitationClass=web

}}</ref>

S8 Southern extension:
Wrocław (A8) - Kłodzko - Template:Nowrap
File:NowaMapaS8.svg approx. 127.4 km 5.1 km 4% 32.5 km 36.3 km approx. 53.5 km 2028, 2033
S10 Main section:
Template:Nowrap - Bydgoszcz (S5) - Template:Nowrap
File:NowaMapaS10.svg 297 km Template:Nowrap
+ 17.5 km
1st carriageway
19.8% 153 km
+ 10.9 km 2nd carriageway
14.3 km Template:Nowrap 2nd carriageway 37.8 km 2030
+ 39.5 km
S11 Template:Nowrap - Template:Nowrap Template:Nowrap Template:Nowrap File:NowaMapaS11.svg 556.5 km 154.4 km
+ 10.5 km
1st carriageway
28.7% 92.1 km
+ 4.2 km
2nd carriageway
25 km 30 km 47 km 2031
Template:Nowrap
+ 6.3 km 2nd c/w
S74 Łódź (A1) - Sulejów (S12) - Kielce (S7) - Nisko (S19) File:NowaMapaS74.svg approx. 261 km 6.7 km 2.6% 108.6 km 28.7 km 92 km 2032, 2035
+ approx. 54 km
File:Znak D9.svgFile:PL road sign D-7.svg
4) Planned highways
Sign Route Location Total length Existing Construction commenced Of which under active construction Tender Template:Nowrap complete In preparationTemplate:Efn Planned Template:Shy <ref name="gddkia_planned_construction_dates"/><ref name="pbdk_2033_progress"/>
S5 Eastern extension:
Template:Nowrap
File:NowaMapaS5.svg approx. 104.3 km 14.3 km 13.7% approx. 90 km 2033
Western extension:
Bolków (S3) – Świdnica – S8
approx. 50 km 0 km 0% approx. 50 km 2032
S10 Eastern section:
Template:Nowrap - Template:Nowrap
File:NowaMapaS10.svg approx. 120 km 0 km 0% Template:Nowrap 2033
S12 Western section:
Template:Nowrap - Radom (S7) - Lublin (S17)
File:NowaMapaS12.svg 185 km 16.4 km
+ 6.0 km
1st carriageway
10.7% 29.1 km 133.5 km
+ 6.0 km 2nd c/w
2032
File:S16-PL.svg Olsztyn (S51) - Ełk (S61) - Template:Nowrap File:NowaMapaS16.svg approx. 245 km 46.2 km
Template:Nowrap
1st carriageway
23% 19.7 km
+ 20.1 km 2nd carriageway
77.5 km 2037
+ approx. 81.5 km
S17 Warsaw eastern bypass Template:Nowrap Warsaw 17.3 km 3.5 km 20.2% 13.8 km 2035
A50
A50
Template:Nowrap Template:Nowrap Warsaw
(2nd ring road)
approx. 265 km 0 km 0% Template:Nowrap
Template:Nowrap
2037
File:S52-PL.svg Template:Nowrap Template:Nowrap - Template:Nowrap File:NowaMapaS52.svg 98 km 37 km 37.8% 61 km 2032
File:Znak D9.svgFile:PL road sign D-7.svg
In totalTemplate:Efn
Planned length Existing Construction commencedTemplate:Efn Of which under active construction Tender Predesign complete In preparation No progress
Total approx. Template:Cvt Template:Nowrap
File:PL road sign D-7.svg approx. 6164 km
4955.1 km
Template:Nowrap
1st carriageway
61.14% 1324.3 km
Template:Nowrap
Template:Nowrap
574.6 km
Template:Nowrap
Template:Nowrap
121.6 km
Template:Nowrap 2nd carriageway
0 km approx.
1667.6 km
Template:Nowrap
2nd carriageway
Template:Nowrap
2nd c/wTemplate:Efn

Cross-sectionsEdit

File:Droga ekspresowa S5S10 Stryszek-Białe Błota a.jpg
S5 near Bydgoszcz with 2x2 lanes: the most common highway type
File:Most Banówka.jpg
S22 near Kaliningrad Oblast border: a single-carriageway expressway; space reservation for the 2nd carriageway can be seen on the right

As of January 2025, the operational sections of highways utilize the following cross-sections:

  • 7% (367 km) – motorways and expressways with 2x3 or (occasionally) 2x4 or 2x5 lanes,
  • 89.5% (4660 km) – motorways and expressways with 2x2 lanes,
  • 3.5% (178 km) – single-carriageway expressways, of which 69 km with dual-carriageway fragments (2x2) around the interchanges.

All single-carriageway expressways are constructed with allocated space for a possible upgrade to dual-carriageway and all bridges above such highways are prepared to accommodate the second carriageway. Most of those sections are planned to be widened to full profile by 2033, the exceptions being S1 (near the Slovak border) and S22 (near the border with Kaliningrad Oblast) where widening is currently not expected.<ref name="pbdk_2033"/>

Substandard highwaysEdit

File:A4,legnickie pole,Poland.jpg
The substandard section of A4 west of Wrocław

Motorways and expressways constructed before 1999 do not have to fulfill technical parameters defined by the ministry ordinance. As of 2025, one notable case of a substandard highway remains:

  • A4 on the section KrzyżowaWrocław (103 km) was constructed in years 1934 – 1937 (then the territory of Nazi Germany) and renovated in years 2002 – 2006. The road received new high quality surface but the geometry was kept unchanged and many overpasses above the motorway were kept. In effect, this part has no emergency lanes and the speed limit is decreased to 110 km/h. Its full reconstruction (and widening to three lanes per direction) is scheduled for years 2027 – 2031.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

Notable historical cases are:

Historical cases
  • Expressways were formerly allowed to admit an at-grade intersection with a minor public road in exceptional cases. The last such case which remained operational past 1999 was S3 near Szczecin (19 km), opened in 1979, which featured two at-grade road intersections until the reconstruction conducted in years 2019 – 2020.<ref name="rzesnica">{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref><ref name="Miekowo Rześnica">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="dabie_goleniow_opening">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Since 2020, all expressways (as well as motorways) in Poland have grade-separated intersections, which became a formal requirement by 2022, when the provision allowing at-grade intersections on expressways was removed from the ordinance.<ref name="rozp2022"/>

  • A6 near Szczecin (29 km) was constructed by Nazi Germany and kept using the original surface made of concrete slabs until the reconstruction conducted in years 1996 – 1999 and (easternmost fragment) 2017 – 2021.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

  • A18 (70 km) had its southern carriageway constructed by Nazi Germany. The northern carriageway was constructed in 2004 – 2006, while the southern carriageway kept using the original concrete slabs until the reconstruction conducted in years 2020 – 2023.

Speed limitsEdit

Maximum speed (km/h) by vehicle type File:Znak D9.svg Motorway File:PL road sign D-7.svg Expressway
dual-carriageway single-carriageway
Private car, motorbike, van up to 3.5Template:Nbspt (does not apply if towing trailer) 140 120 100
Bus meeting additional technical requirements 100
Bus; a vehicle over 3.5Template:Nbspt or towing trailer or carrying dangerous materials 80
Vehicle having equipment more than 1.5Template:Nbspm forward of the driver's seat 60
Motorbike (including towing trailer) carrying a child up to 7 years old 40

Other restrictionsEdit

  • Pedestrians, bicycles, mopeds, and agricultural vehicles are not allowed on motorways.
  • Minimum speed on motorways is 40 km/h except in extraordinary circumstances (e.g. snow, ice, or a car broken down).
  • It is forbidden to stop except in extraordinary circumstances, or to travel backwards.
  • Towing is not allowed on motorways, but is permitted on expressways.

TollsEdit

File:Punkty poboru opłat.svg
Motorways with tolled sections

Since 2023, all state-owned highways are free for vehicles up to 3.5 tons of permissible maximum weight<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> (for a passenger car with a trailer, the joint permissible maximum weight of the car and the trailer must not exceed 3.5 tons<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>). On some sections, old inactive infrastructure for toll collection is still in place.

The privately owned sections of A1, A2 and A4 are tolled. These sections are indicated by the motorway sign accompanied by the word Płatna.

Tolled sections
Sign Section Manager Length PriceTemplate:Efn Manual toll collection Electronic toll collection Notes
File:Znak D9+Tabliczka T28.svg A1 GdańskToruń Template:Abbr 152 km 30 PLN ($Template:To USD) Closed system: there are toll stations on every interchange; the driver receives a ticket upon entering the motorway and pays on the exit, with the price dependent on the distance driven. citation CitationClass=web

}}</ref><ref name="autopay.pl">{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref> allows one to choose the "fast gates" instead of waiting in the queue to the regular gates.

A2 RzepinPoznań-West Template:Abbr 133 km 50 PLN ($Template:To USD) Template:N/a Template:Nowrap, including the common sections with S5 and S11, is free.
Poznań-EastSługocin 85 km 64 PLN ($Template:To USD) Open system: two toll stations are located at the ends of the section; a person driving the whole distance pays at both gates, while a person entering or leaving the motorway mid-section pays only at one gate. Electronic toll collection through the Autopay mobile app<ref name="ReferenceA"/><ref name="autopay.pl"/> allows one to choose the "fast gates" instead of waiting in the queue to the regular gates.
A4 MysłowiceTemplate:Nowrap Stalexport 52 km 32 PLN ($Template:To USD) Template:Nowrap, including the common sections with S7 and S52, is free.

Vehicles over 3.5 tons and busesEdit

Using e-Toll is obligatory for buses as well as all vehicles with maximum permissible weight exceeding 3.5 tons (including the trailer) while driving on the Polish roads (not just the highways). More details can be found on the e-Toll website.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Traffic volumesEdit

Traffic volumes in Poland note rapid increase since the fall of communism in 1989: the annual average daily traffic recorded in 2020 amounts to over 360% of the average traffic recorded in 1990.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="gpr2020_synteza">https://www.gov.pl/attachment/f49c90ff-eb1c-469c-8ab4-04bf91ac7db0 Template:Bare URL PDF</ref> With the increasing traffic, the length of overburdened single-carriageway national roads<ref name="gpr2015_synteza">The measurement analysis defines a regular single-carriageway road as overburdened if recorded average annual traffic exceeds 15'000 vehicles per day, see {{#invoke:citation/CS1|citation |CitationClass=web }}</ref> had also been steadily increasing until reaching the maximum of 1389 km in 2010.<ref>https://www.archiwum.gddkia.gov.pl/userfiles/articles/g/GENERALNY_POMIAR_RUCHU_2010/0.1.1.5_Synteza_GPR_2010.pdf Template:Bare URL PDF</ref> Due to the large number of highway sections opened between 2010 and 2020, in that decade the length of overburdened roads has fallen down for the first time in history, from 1389 km in 2010 to 1121 km in 2020.<ref name="gpr2020_synteza"/>

The latest general measurement was conducted in 2020, although some measurement days were moved to 2021 due to the COVID-19 pandemic which would have caused the results from 2020 to be unreliable.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The following highways recorded the highest volumes:<ref name="gpr2020">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Busiest highways in Poland (absolute numbers)
No Section Template:Nowrap Notes
1 S8 in Warsaw 198,000 Template:Nowrap
Highest AADT on sections with 3 lanes per direction: 179k.
S8 in Warsaw serves both the transit and local traffic, and long jams form on it during rush hours. Template:Nowrap
2 Template:Nowrap 143,000 Data from 2023 – the results from 2020 were not considered reliable because the tunnel section was missing.<ref>https://www.archiwum.gddkia.gov.pl/frontend/web/userfiles/articles/s/stacje-ciaglych-pomiarow-ruchu-d_41706/WARSZAWA/2023/14018_2023.pdf</ref> Template:Nowrap. Template:Nowrap
3 S86 113,000 S86 serves mainly local traffic between Sosnowiec and Katowice and is not part of Poland's transit network. 3 lanes per direction.
4 A4 in Katowice 105,000 A4 serves both the transit traffic (2 lanes per direction) and local traffic (2 lanes per direction).
Busiest highways in Poland (per number of lanes)
No Section Template:Nowrap Template:Nowrap Notes
1 S8 in Warsaw Template:Nowrap See above.
2 S2: Warsaw southern bypass 143,000 / 2×3 lanes
3 S6: Gdańsk, Sopot and Gdynia bypass 93,000 / 2×2 lanes Some decrease in traffic on S6 is expected after Tricity Outer Bypass (S7) is opened in late 2025.
4 A4: Kraków western bypass 85,000 / 2×2 lanes Some decrease in traffic on A4 is expected after Kraków north-eastern bypass (S7/S52) is opened in mid-2026. Widening to 3 lanes per direction is planned in the future (after 2030).

The other highest and lowest recorded AADT values were:

Category Section Template:Nowrap Notes
Busiest regular national roads
Note: Measurements are not performed on national roads within the borders of major cities
Busiest dual-carriageway national road DK7 north of Warsaw 63,000 Template:Nowrap New parallel route of S7 is planned to be opened in the future (around 2032).
Template:Nowrap DK44 west of Kraków 36,000 citation CitationClass=web

}}</ref>

Template:Nowrap within the planned highway network DK19 north of Lublin 28,500 S19 is under construction, expected to be opened in mid-2027.
Busiest single-carriageway highways
Busiest single-carriageway highway S1 near Żywiec 17,000
Least busy highways
Least busy single-carriageway highway Template:Nowrap 800 Data from 2023 – the results from 2020 were not considered reliable due to restrictions in crossing the external EU borders during the COVID-19 pandemic.<ref name="gpr2020_synteza"/><ref>https://www.archiwum.gddkia.gov.pl/frontend/web/userfiles/articles/s/stacje-ciaglych-pomiarow-ruchu-d_41706/OLSZTYN/2023/28802_2023.pdf</ref><ref>https://www.archiwum.gddkia.gov.pl/frontend/web/userfiles/articles/s/stacje-ciaglych-pomiarow-ruchu-d_41706/RZESZOW/2023/18804_2023.pdf</ref>
Least busy dual-carriageway highway A4 near Template:Nowrap 2,200
Least busy highway excluding near-border sections Template:Nowrap 3,900 – 6,400

The new general measurement is being conducted throughout 2025.

HistoryEdit

Before World War IIEdit

File:Uklad Drog II RP.png
The network planned prior to WWII
File:DK3 DK6 Szczecin Kijewo.jpg
Pre-WWII surface on A6 before the reconstruction (photo from 2009)
File:DK 18 (Reichsautobahn RAB 9).JPG
Pre-WWII surface on the southern carriageway of A18 before the reconstruction (photo from 2012)

The first plans of creation of a national highway network in Poland were conceived in the interwar period:

Plans

The main promoter of this concept was Professor Melchior Wladyslaw Nestorowicz of the Warsaw University of Technology, who organized three Road Congresses, during which a group of specialists discussed the creation of the network. On 5 March 1939, in the trade magazine Drogowiec, Professor Nestorowicz proposed a very ambitious plan for the construction of almost 5,000 kilometres of category I and II roads, based on similar programmes in Germany and Italy.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Nestorowicz sketched a map of the future system with the following routes:

First class roads would, according to the plans, consist of the following motorways (totalling some Template:Cvt:

Second class roads would consist of the following motorways, totalling another Template:Cvt:

In 1934, Nazi Germany started the construction of their motorway system, parts of which today form A18 and A4 to Wrocław (Breslau), as well as A6 (Szczecin bypass) and S22 (parts of the planned motorway to Königsberg). About half of them were constructed as single-carriageway with the intention of adding a second carriageway in later years. However, after 1938, warfare expenses meant little money would be invested into any infrastructure and only one 9 km single-carriageway piece west of Gliwice (now A4) was constructed.

Template:Nowrap
Signage Section Length Start of construction Opening Notes
File:A4-PL.svg Krzyżowa (File:A18-PL.svg) – Krzywa Template:Cvt Template:Dts Template:Dts
Krzywa – Wrocław Template:Cvt Template:Dts
Wrocław – Brzeg (Owczary) Template:Cvt Template:Dts Southern carriageway only
Ujazd (Nogowczyce) – Łany Template:Cvt Template:Dts Template:Dts
Łany – Kleszczów (Gliwice) Template:Cvt Template:Dts Template:Dts
File:A6-PL.svg File:Flag of Germany.svg – Szczecin-Zachód Template:Cvt Template:Dts Template:Dts
Template:Nowrap Template:Cvt Template:Dts
File:A18-PL.svg File:Flag of Germany.svg – Iłowa Template:Cvt Template:Dts Template:Dts Southern carriageway only
IłowaGolnice Template:Cvt Template:Dts Template:Dts
Template:Nowrap Template:Cvt Template:Dts Template:Dts
File:S22-PL.svg Elbląg – Grzechotki Template:Cvt Template:Dts Template:Dts Western carriageway only
Total Template:Cvt
of which Template:Cvt single carriageway
Note: Signage of the roads at the time of opening was different.

In Poland, a 28 km stretch between Warlubie and Osiek (now DW214) was constructed in 1937 – 1939 in the motorway standard of the time (today not considered a highway) with a concrete surface, which was designed by Italian engineer Piero Puricelli. The motorway was planned to reach Gdynia, but the outbreak of the Second World War halted the plans.

1945 – 1972Edit

The Potsdam conference defined the borders for communist Poland, which were very different from the pre-1939 ones. It received the so-called Regained Territories from the former Third Reich with the aforementioned motorway sections (some of them with first carriageway only). Most of the motorway bridges were destroyed by the warfare, but only a few were repaired or rebuilt in the first post-war years. The bridge over Ina river was reconstructed in 1972, and those on S22 only between 1996 and 2003.

Apart from the bridges, almost all the motorways were left in the same condition as they were in 1945 until the mid-1990s. The only road left from Nazi times that was completed by the People's Republic of Poland was a one-carriageway small section between Łęczyca and Lisowo (15 km of what is now DW142), which was built on the previous works of Nazis.

Plans

At the post-war year there were very ambitious plans to make a motorway network for the whole Poland. For example, engineer Eugeniusz Buszma has published his propositions to the network in the magazine "Drogowiec" (1946, issue 1):

  1. East – West (SłubiceWarsawBiałystok) – 680 km
  2. North – South (Gdynia – Warsaw – Balkans) – 650 km
  3. Silesia – Baltic I (GdańskŁódźKatowice) – 460 km
  4. Pomeranian (Gdańsk – Szczecin) – 280 km
  5. Silesian (Wrocław – Katowice – Kraków) – 190 km
  6. Mazurian (Kaliningrad – ElblągMalbork) – 20 km
  7. Silesia – Baltic II (Bydgoszcz – Wrocław) – 260 km
  8. Łódź – Wrocław – (Prague) – 310 km
  9. Katowice – (Vienna) – 60 km
  10. Poznań – Szczecin – 200 km
  11. RadomLublin – (Lviv) – 220 km

In total, the mileage, according to the proposal, would total more than Template:Cvt.

After the addition of the sections built by the Third Reich the total network length had to be approx. 3700 km. In 1963 the Motorization Council at the Council of Ministers had presented the similar plan plus the motorways: Warsaw-Kraków-Zakopane, Kraków-Przemyśl, Warsaw-Bydgoszcz-Koszalin, Poznań-Koszalin i Warsaw-Terespol (approx. 1250 km).

Despite announcing such pompous plans, no motorway was opened in the meantime.

In the 1970sEdit

File:POL.Gdynia.Pustki Cisowskie.jpg
S6 in Gdynia, part of Tricity bypass: the oldest expressway in Poland (1st carriageway opened in 1977).

Only in the 1970s did any works start.

Plans

In 1972 it was planned to build:

  • the Gliwice-Kraków motorway (now A4)
  • the second carriageway of the Wrocław-Gliwice motorway (also A4)
  • the Warsaw-Katowice motorway (so-called "Gierkówka", now the S8/A1 road), in the near future

The plans were expanded in 1976 by the following sections:

In 1973 – 1976, "Gierkówka" dual carriageway from Warsaw to Katowice (Template:Cvt) was built. Originally planned as a motorway, it was in the end constructed by adding another carriageway to the existing road, hence going through many villages and crossing with local roads. The part from Piotrków Trybunalski to Częstochowa (78 km) was constructed on a new route in a motorway alignment, but nonetheless the majority of the crossings between the highway and the other roads were constructed as one-level intersections with no viaducts or overpasses.

Highway sections opened in the 1970s
Signage Section Length Start of construction Opening
File:DK1-PL.svg Piotrków Trybunalski – Częstochowa
substandard (multiple at-grade intersections), constructed on motorway alignment, not signed as a highway
Template:Cvt Template:Dts Template:Dts
File:S6-PL.svg Tri-city bypass (eastern carriageway)
substandard (two at-grade intersections, then reconstructed when adding a second carriageway in the 1980s)
Template:Cvt Template:Dts Template:Dts
Szczecin-Rzęśnica (end of post-German A6 motorway) – Goleniów
substandard (two at-grade intersections)
Template:Cvt Template:Dts Template:Dts
Total Template:Cvt
of which Template:Cvt single carriageway

In the 1980sEdit

File:A4 Zalas 04.jpg
A4 near Zalas, opened in 1983 (photo after renovation in 2000)

Near the end of the 1970s the first construction of motorways started and continued to the next decade. The roads opened in the 1980s were the first motorways and expressways which generally meet the contemporary standards (at least with respect to their more important attributes), although in multiple cases the poor quality of their construction forced major renovations to be performed as soon as within the first 20 years of operation.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The major routes planned as motorways were A1, A2 and A4, while other main routes were planned as expressways. The implementation of these plans, however, came at a very slow pace: throughout the 1980s, only an average of Template:Cvt of highways in the whole country were being opened per year.

Template:Nowrap
average: 21 km / year
Signage Section Length Start of construction Opening Notes
File:A1-PL.svg Template:Nowrap Template:Cvt Template:Dts Template:Dts Reconstructed 2019 – 2021
File:A2-PL.svg Września - Konin Template:Nowrap Template:Dts Template:Dts Renovated 2002 – 2003
Template:Cvt Template:Dts Template:Dts
File:A4-PL.svg Jaworzno - Kraków (Tyniec) Template:Nowrap Template:Dts Template:Dts Renovated 1999 – 2000
Template:Cvt (Jaworzno - Chrzanów) Template:Dts Template:Dts
Template:Cvt (1st section of Kraków bypass: Template:Nowrap Template:Dts Template:Dts
File:S1-PL.svg Dąbrowa Górnicza - Tychy Template:Cvt Template:Dts Template:Dts
File:S6-PL.svg Tri-city bypass (to Straszyn) Template:Cvt Template:Dts Template:Dts Second carriageway
File:S7-PL.svg Kielce bypass Template:Cvt Template:Dts Template:Dts First carriageway
File:S52-PL.svg Kraków northern bypass: fragment Balice - Zabierzów Template:Cvt Template:Dts Then signed as motorway A4a
File:S86-PL.svg Katowice - Sosnowiec Template:Cvt Template:Dts Template:Dts First completely done expressway
Total Template:Cvt of which Template:Cvt single carriageway

In the 1990sEdit

File:HighwaysMapPoland 31 12 1990.svg
The highway network in 1990

In the III Republic of Poland, planned S3 was promoted to motorway A3 (the decision was later reversed) and a plan was introduced (also later reversed) of constructing motorway A8 Łódź – Wrocław – Bolków (now S8/A8/S5). Szczecin bypass (A6) and section Olszyna – Krzywa (then named A12, now A4/A18) were promoted to motorways, even though at that time the majority of their lengths was in bad shape, laid with the original concrete surface from the 1930s with no significant works having been performed on any of them throughout the whole communist period.

Template:Nowrap
average: 15 km / year
Signage Section Length Start of construction Opening Notes
File:A4-PL.svg Katowice - Jaworzno Template:Cvt (Mysłowice - Jaworzno) Template:Dts Template:Dts Northern carriageway was opened on Template:Dts
Template:Nowrap Template:Dts Template:Dts
Template:Cvt (in Katowice) ? Template:Dts
Kraków bypass (section Tyniec - ul.Kąpielowa) Template:Cvt (to Skawina) Template:Dts Template:Dts
Template:Cvt Template:Dts Template:Dts A4 had a crossroad with ul. Kąpielowa till 2002, when the bridge was built over it.
File:Flag of Germany.svg - Zgorzelec Template:Cvt Template:Dts Template:Dts
Krzyżowa - Krzywa Template:Cvt ? Template:Dts Renovated
File:A6-PL.svg File:Flag of Germany.svg - Podjuchy Template:Cvt Template:Dts Template:Dts Renovated
File:A18-PL.svg OlszynaFile:Flag of Germany.svg - Królów Template:Cvt ? Template:Dts Northern carriageway added Template:Nowrap
Golnice - Krzyżowa Template:Cvt Template:Dts Renovated both carriageways
File:S1-PL.svg Flag of the Czech Republic - Cieszyn-East Template:Cvt Template:Dts Template:Dts
File:S3-PL.svg Sulechów - Zielona Góra Template:Nowrap Template:Dts Template:Dts Western carriageway only
File:S5-PL.svg Świecie bypass Template:Cvt Template:Dts Template:Dts Single carriageway; dual carriageway near the interchanges
File:S7-PL.svg Template:Nowrap Template:Cvt Template:Dts Template:Dts
Miłomłyn bypass Template:Cvt Template:Dts Template:Dts Eastern carriageway only
File:S8-PL.svg Radzymin bypass Template:Cvt Template:Dts Template:Dts
Total Template:Cvt of which Template:Cvt reconstructed, Template:Cvt single carriageway

In the 2000sEdit

File:HighwaysMapPoland 31 12 2000.svg
The highway network in 2000

As of the beginning of 2000, the vast majority of national and international traffic routes were served by regular national roads with at-grade intersections and pedestrian crossings, most of them leading through the centres of cities, towns and villages, and most of them single carriageway. Only the following number of highways was present:

  • about Template:Cvt of modern dual-carriageway motorways and expressways (3.5% of the network as planned nowadays),
  • about Template:Cvt of single-carriageway expressways,
  • about Template:Cvt of not-resurfaced Nazi German motorways from the 1930s,
  • about Template:Cvt of not-resurfaced Nazi German motorways on sections where only the first carriageway had been constructed.

Before Poland received the EU membershipEdit

File:A4 Krakow 20070815 1026.jpg
A4, Kraków southern bypass, opened in 2003

At the beginning of the 21st century, the tempo of highway construction started to increase. The main focus was on the west–east motorways A4 and A2. In 2002, a long-awaited renovation of the A4 from Krzywa to Wrocław (93 km) has started, which included laying new high quality surface in place of the Nazi German concrete slabs, reconstruction of all the pre-WWII bridges on the motorway and renovation of the viaducts above the motorway.

This is also the period when Poland started introducing motorway tolls, first in 2000 for the A4 section between Mysłowice and Kraków.

Template:Nowrap
average: 57 km / year
Signage Section Length Start of construction Opening Notes
File:A2-PL.svg Poznań Komorniki - Września Template:Nowrap Template:Dts Template:Dts
Template:Cvt Template:Dts Template:Dts
File:A4-PL.svg Wrocław (Bielany) - Template:Nowrap Template:Cvt (to Brzeg) Template:Dts Template:Dts Template:Nowrap Template:Nowrap
Template:Cvt (to Opole-East)
Template:Nowrap Template:Dts
Template:Cvt (to Kleszczów) Template:Dts Template:Dts Template:Nowrap Template:Nowrap
Chorzów - Katowice Mikołowska Template:Cvt Template:Dts Template:Dts
Kraków bypass (section ul.Kąpielowa - Wieliczka) Template:Cvt Template:Dts Template:Dts
File:S5-PL.svg Śmigiel bypass Template:Cvt ? Template:Dts First carriageway
File:S6-PL.svg Straszyn - Rusocin Template:Cvt Template:Dts Template:Dts Second carriageway
File:S7-PL.svg Białobrzegi bypass Template:Cvt Template:Dts Template:Dts
File:S8-PL.svg Ostrów Mazowiecka bypass Template:Cvt Template:Dts
Total Template:Cvt of which Template:Cvt single carriageway

Poland in European UnionEdit

File:PL A2 Poznan Komorniki.JPG
A2, Poznań bypass, opened in 2004 (then widened to 2x3 in 2019)
File:HighwaysMapPoland 31 12 2010.svg
The highway network in 2010

1 May 2004 was a crucial day for the history of motorway construction and that is when the length of highway constructions increased the most. One of the major advantages of signing the European Union access document was that Poland could get access to large funds for co-financing the construction of new roads and upgrades of the existing road infrastructure.

These years, the existing scattered pieces of highways began to converge into the basis of the future network:

A large number of expressway bypasses of towns were also constructed at this time. On many of them, only one carriageway was built, with the allocated space prepared for easy construction of the second carriageway later.

Template:Nowrap
average: 151 km / year
Signage Section Length Start of construction Opening Notes
File:A1-PL.svg Template:Nowrap Template:Nowrap Template:Dts Template:Dts
Template:Cvt Template:Dts
Sośnica - Żory Template:Cvt Template:Dts Template:Dts
Template:Cvt 2007 Template:Dts
File:A2-PL.svg Nowy Tomyśl - Poznań Komorniki Template:Cvt Template:Dts Template:Dts
Konin - Łódź (Stryków) Template:Nowrap Template:Dts Template:Dts
File:A4-PL.svg Krzywa - Wrocław (Bielany) Template:Cvt Template:Dts Template:Dts–2006
(in sections)
Renovated both carriageways
Gliwice (Sośnica) - Chorzów Batory Template:Cvt Template:Dts Template:Dts
Gliwice bypass (Kleszczów - Sośnica) Template:Cvt Template:Dts Template:Dts
Zgorzelec File:Flag of Germany.svg - Krzyżowa Template:Cvt Template:Dts Template:Dts
Wieliczka - Targowisko Template:Cvt Template:Dts Template:Dts
File:A6-PL.svg Szczecin Klucz - Szczecin Kijewo Template:Cvt Template:Dts Template:Dts Renovated both carriageways
File:A18-PL.svg Olszyna File:Flag of Germany.svg - Golnice Template:Cvt Template:Dts Template:Dts Constructed the northern carriageway alongside the pre-WWII southern carriageway
File:S1-PL.svg File:Flag of Slovakia.svg - Zwardoń - Milówka Template:Cvt 2002 - 2007 2004 - 2010
Template:Nowrap
Template:Nowrap then signed S69
Żywiec - Przybędza Template:Cvt 2005 2007
Pyrzowice airport - Podwarpie Template:Cvt 2005 2006 Single carriageway
File:S3-PL.svg SzczecinGorzów Wielkopolski Template:Cvt Template:Dts Template:Dts
Template:Nowrap Template:Cvt Template:Dts Template:Dts Single carriageway
Międzyrzecz bypass Template:Nowrap Template:Dts Template:Dts
Nowa Sól bypass Template:Cvt Template:Dts Template:Dts
File:S5-PL.svg Szubin bypass Template:Cvt Template:Dts Template:Dts Single carriageway
File:S6-PL.svg Słupsk bypass Template:Cvt Template:Dts Template:Dts Single carriageway; dual carriageway near the interchanges
File:S7-PL.svg Jędrzejów bypass Template:Cvt Template:Dts Template:Dts Partially (2.7 km) single carriageway
Nowy Dwór Gdański bypass Template:Cvt Template:Dts Template:Dts
Elbląg bypass Template:Cvt Template:Dts Template:Dts
Grójec bypass Template:Cvt Template:Dts Template:Dts
Białobrzegi - Jedlińsk Template:Cvt Template:Dts Template:Dts
Myślenice - Lubień Template:Cvt Template:Dts Template:Dts
Kielce bypass (northern part) Template:Cvt Template:Dts Template:Dts
Płońsk bypass Template:Cvt Template:Dts Template:Dts
SkurówBiałobrzegi Template:Cvt Template:Dts Template:Dts
Kraków eastern bypass (first fragment) Template:Cvt Template:Dts Template:Dts
File:S8-PL.svg Oleśnica bypass Template:Cvt Template:Dts Template:Dts
Wyszków bypass Template:Cvt Template:Dts Template:Dts
Wyszków - Radzymin Template:Cvt Template:Dts Template:Dts
Wrocław - Kobierzyce Template:Cvt Template:Dts Template:Dts
File:S10-PL.svg Toruń bypass (fragment) Template:Cvt Template:Dts Template:Dts Single carriageway
Kobylanka bypass Template:Cvt Template:Dts Template:Dts Partially (7 km) single carriageway
Stargard bypass Template:Cvt Template:Dts Template:Dts
Bydgoszcz bypass (fragment) Template:Cvt Template:Dts Template:Dts
Wyrzysk bypass Template:Cvt Template:Dts Template:Dts Single carriageway
File:S11-PL.svg Poznań - Kórnik Template:Cvt Template:Dts Template:Dts
Ostrów Wlkp. bypass (northern part) Template:Cvt Template:Dts Template:Dts Single carriageway
File:S12-PL.svg Piaski bypass Template:Cvt Template:Dts Template:Dts
Puławy bypass Template:Cvt Template:Dts Template:Dts Partially (8.7 km) single carriageway
File:S16-PL.svg BarczewoBiskupiec Template:Cvt Template:Dts Template:Dts Single carriageway
File:S17-PL.svg Garwolin bypass Template:Cvt Template:Dts Template:Dts
File:S19-PL.svg Międzyrzec Podlaski bypass Template:Cvt Template:Dts Template:Dts Single carriageway
File:S22-PL.svg Elbląg - Grzechotki / Kaliningrad Oblast Template:Cvt Template:Dts Template:Dts Single carriageway; constructed in place of a partially destroyed motorway from the 1930s
File:S52-PL.svg Cieszyn File:Flag of the Czech Republic.svg - Bielsko-Biała (Komorowice) Template:Cvt 2002 - 2005 2005 - 2007
Template:Nowrap
Then signed S1
Total Template:Cvt of which Template:Cvt single carriageway, Template:Cvt reconstructed

2011 – 2015Edit

File:AOW - Most Rędziński od północnego wschodu.jpg
Rędziński bridge on A8, Wrocław bypass, opened in 2011

In the five years from 2011 to 2015, 1563 kilometers of motorways and expressways were opened – about as much as in the whole prior history of highway construction combined. The main focus was on developing connections between Poland's largest cities, especially those serving as host venues of UEFA Euro 2012, as well as on extending A4 towards Ukraine.

Length of highways opened in 2011 – 2015
Year Length Notes
2011 Template:Cvt
2012 Template:Cvt Of which Template:Cvt were opened before Euro 2012 championship
2013 Template:Cvt
2014 Template:Cvt
2015 Template:Cvt
Total Template:Cvt Of which 26 km first carriageway, 23 km second carriageway

The sections opened in 2011 – 2015 belonged to the following highways:

2016 – 2020Edit

File:Most S7 niebieski.jpg
Bridge over Vistula on S7, Kraków eastern bypass, opened in 2017
File:HighwaysMapPoland 31 12 2020.svg
The highway network in 2020

After the peak of investments before Euro 2012, very few new contracts for road construction were signed in 2012 and 2013. This resulted in a small number of sections being opened in 2015 and 2016, a large share of which were the last delayed fragments originally scheduled for a Euro 2012 opening. In particular:

  • In 2016, the last delayed fragment of File:A4-PL.svg between Kraków and Ukraine was opened, making A4 the first major Polish highway completed on its whole length, as well as the first complete border-to-border highway connection.
  • Also in 2016, the delayed bypass of Łódź was finished, making File:A1-PL.svg completed on its whole route except for those sections where national road 1 had already been a dual carriageway (see In the 1970s), allowing for a significantly lower priority of constructing the remaining stretch compared to other highways.

Since 2014, the number of signed contracts has risen again, resulting in the number of road openings having risen again since 2017.

Length of highways opened in 2016 – 2020
Year Length Notes
2016 Template:Cvt
2017 Template:Cvt
2018 Template:Cvt
2019 Template:Cvt
2020 Template:Cvt
Total Template:Cvt Of which 13 km first carriageway, 81 km second carriageway

The sections opened in 2016 – 2020 belonged to the following highways:

2021 – 2025Edit

File:Tunel pod Ursynowem 08.2021.jpg
The tunnel section of S2 in Warsaw, opened in 2021
File:HighwaysMapPoland2025.svg
The highway network on 1.06.2025

The high tempo of highway development continued in the 2020s. The main focus was on construction of new highways in the less populated eastern Poland, including the international routes Via Carpatia and Via Baltica.

Template:Nowrap
Year Length Notes
2021 Template:Cvt
2022 Template:Cvt
2023 Template:Cvt
2024 Template:Cvt
2025 Template:Cvt Planned openings in 2025<ref>{{#invoke:citation/CS1|citation CitationClass=web

}}</ref>

Total Template:Nowrap Of which 7 km first carriageway, 101 km second carriageway

The sections opened, or planned to get opened, in 2021 – 2025 belong to the following highways:

Total length of highways by yearEdit

Year Length of motorways and expressways (end of the year)
1936 (then Nazi Germany) 92 km
1937 (then Nazi Germany) 104 km and 38 km first carriageway
1938–1945 (then Nazi Germany) 133 km and 135 km first carriageway (further below not considered as a motorway until addition of the second carriageway)
1939–1945 (Poland) 28Template:Nbspkm (today not considered as a highway)
1945–1976 133 km
1977 169 km
1978 169 km
1979 190 km
1980 190 km
1981 190 km
1982 190 km
1983 255 km
1984 278 km
1985 321 km
1986 327 km
1987 327 km
1988 348 km
1989 366 km
1990 381 km
1991 399 km
1992 399 km
1993 403 km
1994 405 km
1995 440 km
1996 453 km
1997 456 km
1998 490 km
1999 502 km
2000 592 km
2001 630 km
2002 639 km
2003 727 km
2004 781 km
2005 848 km
2006 1013 km
2007 1083 km
2008 1282 km
2009 1454 km
2010 1560 km
2011 1865 km
2012 2495 km
2013 2805 km
2014 3100 km
2015 3131 km
2016 3252 km
2017 3510 km
2018 3811 km
2019 4214 km
2020 4337 km
2021 4690 km
2022 4933 km
2023 5116 km
2024 5206 km
2025 5486 km (forecast<ref name="gddkia_contracts'_completion_dates"/>)
2026 5937 km (forecast<ref name="gddkia_contracts'_completion_dates"/>)
2027 6148 km (forecast<ref name="gddkia_contracts'_completion_dates"/>)
2028 6545 km (forecast<ref name="gddkia_contracts'_completion_dates"/>)
2029 citation CitationClass=web

}}</ref>)

2030 approx. 6800 km (plans<ref name="przetargi_2025"/>)
2031 approx. 7000 km (plans<ref name="pbdk_2033"/><ref name="gddkia_planned_construction_dates"/>)
2035 approx. 8000 km (plans<ref name="pbdk_2033"/><ref name="gddkia_planned_construction_dates"/>)
2040 approx. 8250 km – full network (plans<ref name="pbdk_2033"/>)

See alsoEdit

NotesEdit

Template:Notelist

ReferencesEdit

Template:Reflist

External linksEdit

Template:Commonscatinline

Template:Motorways and expressways in Poland Template:Motorways in Europe Template:Roads in Europe