Transport for Greater Manchester

Revision as of 10:14, 27 April 2025 by imported>Seasider53 (rm in-line URL)
(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Template:Short description Template:Use dmy dates Template:Infobox organization

Transport for Greater Manchester (TfGM) is a local government body responsible for co-ordinating transport services throughout Greater Manchester in North West England. It is an executive arm of the Greater Manchester Combined Authority (GMCA), the city region's administrative authority. The strategies and policies of Transport for Greater Manchester are set by the GMCA and its Greater Manchester Transport Committee (GMTC). The committee is made up of 33 councillors appointed from the ten Greater Manchester boroughs (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan), as well as the Mayor of Greater Manchester.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

TfGM owns Metrolink – the United Kingdom’s largest light rail network – which is operated and maintained under contract by a Keolis/Amey consortium.<ref name=saldel>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name=rgi20110802>Template:Cite news</ref> TfGM also owns Greater Manchester's Cycle Hire scheme, and is responsible for cycling and walking infrastructure. TfGM owns and maintains bus stations, stops & shelters, however bus services are deregulated in Great Britain outside London. Following the passing of the Bus Services Act 2017, Greater Manchester became the first city-region to start the process of bus franchising, returning bus services to public control.<ref>Template:Cite speech</ref><ref>Template:Cite news</ref> TfGM does not control National Rail services or infrastructure in Greater Manchester.

TfGM is responsible for developing the Bee Network, an integrated transport network for Greater Manchester. The Bee Network is proposed to include a single transport livery, integrated fares & ticketing, and a fare cap across tram, bus, cycling, walking, and eventually suburban rail. In January 2025, all Metrolink trams and franchised buses services were integrated, along with cycle hiring services.<ref name='details'>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Negotiations with central government have led to the agreement that eight commuter lines across Greater Manchester and North Derbyshire will be progressively transferred to TfGM control of fare and service specification between December 2026 and December 2028 with the introduction of multi-modal fare caps with tram and bus, tap and go ticketing, and 64 rail stations refurbished and branded Bee Network. The remaining 32 stations across Greater Manchester lying on other rail lines will then follow by 2030.<ref>https://news.tfgm.com/press-releases/7f9d4151-b911-4247-97d0-cc5d5a9570a3/mayor-andy-burnham-reveals-plans-for-bee-network-rail-to-boost-passenger-numbers-and-drive-greater-manchester-s-growth</ref>

HistoryEdit

The organisation traces its origins to the Transport Act 1968, when the SELNEC (South East Lancashire/North East Cheshire) Passenger Transport Executive was established to co-ordinate public transport in and around Manchester. Between 1974 and 2011, it was known as the Greater Manchester Passenger Transport Executive (GMPTE), until a reform of local government in Greater Manchester granted it more powers and prompted a corporate rebranding.<ref>All change: Greater Manchester Passenger Transport Executive becomes Transport for Greater Manchester – with a new logo of course Template:Webarchive Manchester Evening News 1 April 2011</ref> On 1 April 2011, the GMPTE became Transport for Greater Manchester (TfGM),<ref name="arrangements">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> a new regional transport body for Greater Manchester<ref name="LTP">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="CRPG">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="LEP">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> that forms part of the new Greater Manchester Combined Authority (GMCA).

GovernanceEdit

Template:See also TfGM inherited the responsibilities of the Greater Manchester Passenger Transport Executive established in 1974. At the same time the Greater Manchester Integrated Transport Authority (GMITA) was abolished, with responsibility for oversight of the executive transferred to the combined authority.<ref>Template:Cite legislation UK</ref>

The combined authority and the ten Greater Manchester districts have delegated or referred most of their transport governance functions to a joint committee, the Bee Network Committee. Each local authority appoints one of its executive members with responsibility for transport matters to sit alongside the mayor, a member of the GMCA, and up to four other councillors appointed by the mayor. These additional mayoral appointees allow the committee's political make-up to reflect the political make-up of Greater Manchester's councils as a whole.

The Bee Network Committee has four key responsibilities: Decision-making over significant operational matters across the transport network (including the ability to draw down funding for investment), monitoring the performance and financial stability of the network, developing policy to support the local transport plan, and facilitating coordination between the ten local authorities around highways maintenance and infrastructure delivery.<ref name="bee-network-terms-of-reference">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

ServicesEdit

File:Greater Manchester Railways map.svg
Rail and tram services in Greater Manchester

Manchester MetrolinkEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} The Manchester Metrolink light rail/tram system launched in 1992, entirely subsidised by TfGM without a government grant and operated by KeolisAmey.<ref>RATP buys Manchester Metrolink operator Railway Gazette International 2 August 2011</ref> It carried 43.7 million passengers in the 2018/19 financial year.<ref>Light Rail and Tram Statistics: England 2018/19 Department for Transport (Retrieved 26 July 2020)</ref> With 99 tram stops, it is the second largest local transport network in the United Kingdom after the London Underground. Further expansion of the network to places like Stockport and Bolton are envisaged.

Heavy RailEdit

Heavy Rail services are operated by Avanti West Coast, CrossCountry, East Midlands Railway, Northern, TransPennine Express and Transport for Wales.<ref>Operators Transport for Greater Manchester</ref> TfGM subsidise fares on certain local services and fund station refurbishments on an ad hoc basis.

BusesEdit

Highways and cyclingEdit

  • Greater Manchester Urban Traffic Control Unit (GMUTC) – responsibility for road management transferred to TfGM in 2009. Entails installation, maintenance and management of traffic signals, limited areas of road safety (2012), incident response and event management via a traffic control centre.
  • Cycling – promotion of the Greater Manchester Cycling Strategy and delivery of Cycle Hubs and regional cycle routes

Fares, ticketing and informationEdit

  • Bee card
  • Subsidised fares on certain services
  • System One travelcards
  • Public transport maps and timetables
  • Website
  • Route Explorer application

Bee NetworkEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} Template:See also

The Bee Network is an integrated transport network for Greater Manchester, composed of bus, tram, cycling, and walking routes. TfGM's vision is for the network to be operational by 2024, with commuter rail services joining the network by 2030.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Originally devised in 2018 as a network of active travel routes,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> the vision for the Bee Network was expanded following the Greater Manchester Combined Authority's decision to use the powers given to it under the Bus Services Act 2017 to introduce a bus franchising scheme for the city region.<ref>Template:Cite news</ref> A fleet of buses were branded and repainted yellow for this in 2024.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The active travel subset of the Bee Network was then renamed the Bee Active Network.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Greater Manchester is set to invest a further £40.7m in its walking, wheeling and cycling infrastructure as it progresses with its delivery of the largest active travel network in the country. The £23.7m has been allocated to 13 schemes in total, including a new active travel corridor along Chapel Street in Salford and a striking cycling and walking ‘helix ramp’ as part of the new Stockport Interchange.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Corporate identityEdit

File:Transport for Greater Manchester bus flag.jpg
A TfGM bus stop in 2011 following rebranding
File:BN Bus stop flag.jpg
A Bee Network bus stop flag in 2025

TfGM uses a corporate identity designed in-house. The black and white "M" logo is adapted from the GMPTE logo and was used on bus stops across Greater Manchester. After the rollout of Bee Network bus franchising, bus stop signs are replaced by a black “Bus Stop” wording against a yellow background, with the Bee Network logo appearing in the corner of the sign, while the route font remains unchanged.

See alsoEdit

Template:Portal

ReferencesEdit

Template:Reflist

External linksEdit

Template:Transport in Greater Manchester Template:UK PTEs

Template:Authority control