Manchester Metrolink
Template:Short description Template:About Template:Good article Template:Use dmy dates Template:Infobox Public transit
Manchester Metrolink<ref group="note">The system is branded Metrolink.Template:Sfn<ref name=leg>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name=case>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Department for Transport refers to the system as Manchester Metrolink,<ref name=statsrelease>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> an alternative unofficial name.Template:Sfn<ref name=500tram>Template:Cite news</ref> It is defined in Acts of Parliament and Byelaws as the Greater Manchester Light Rapid Transit System;<ref name=leg/><ref name=case/> and sometimes (unofficially) called Greater Manchester Metrolink.Template:Sfn</ref> is a tram/light rail system in Greater Manchester, England.<ref name=LTRASL>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The network has 99 stops along Template:Convert of standard-gauge route,<ref name="dft22">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> making it the most extensive light rail system in the United Kingdom.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Over the 2023/24 financial year 42 million passenger journeys were made on the system.<ref name="dft23"/>
Metrolink is owned by the public body Transport for Greater Manchester (TfGM) and is part of the region's Bee Network. It is operated and maintained under contract by a Keolis/Amey consortium.<ref name=saldel>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name=rgi20110802>Template:Cite news</ref>
The network consists of eight lines which radiate from Manchester city centre to termini at Altrincham, Ashton-under-Lyne, Bury, East Didsbury, Eccles, Manchester Airport, Rochdale and the Trafford Centre. It runs on a mixture of on-street track shared with other traffic; reserved track sections segregated from other traffic, and converted former railway lines.<ref name=metuk/>
Metrolink is operated by a fleet of 147 high-floor Bombardier M5000 light rail vehicles.<ref name="evolvingm5000">Template:Cite magazine</ref><ref name=":02">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Each of the nine Metrolink routes run five trams per hour in each direction; stops with more than one route running through it will have trams arriving more frequently.<ref name="Tram times"/> Services on busier lines operate as "doubles": two tram vehicles coupled together.
A light rail system for Greater Manchester emerged from the failure of the 1970s Picc-Vic tunnel scheme to obtain central government funding.<ref>Ovenden, Mark. Metrolink: The First 25 Years (2017). St. Leonards: Rails Publishing. pps. 15–17.</ref> A light-rail scheme was proposed in 1982 as the least expensive rail-based transport solution for Manchester city centre and the surrounding Greater Manchester metropolitan area.<ref>Ovenden, Mark. Metrolink: The First 25 Years.(2017). St. Leonards: Rails Publishing. pps.19–22.</ref> Government approval was granted in 1988, and the network began operating services between Bury Interchange and Template:Tram on 6 April 1992. Metrolink became the United Kingdom's first modern street-running rail system; the 1885-built Blackpool tramway being the only first-generation tram system in the UK that had survived up to Metrolink's creation.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Expansion of Metrolink has been a critical strategy of transport planners in Greater Manchester, who have overseen its development in successive projects, known as Phases 1, 2, 3a, 3b, 2CC, and Trafford Park.<ref name=catchup/><ref name="transportstrategy14">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The latest extension, the Trafford Park Line from Template:Tram to The Trafford Centre, opened on 22 March 2020.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Greater Manchester Combined Authority has proposed numerous further expansions of the network, including the addition of tram-train technology to extend Metrolink services onto local heavy-rail lines.<ref name="stalybridge">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Template:TOC limit Template:Metrolinkseries
HistoryEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
PredecessorsEdit
Manchester's first tram age began in 1877 with the first horse-drawn trams of Manchester Suburban Tramways Company. Electric traction was introduced in 1901, and the municipal Manchester Corporation Tramways expanded across the city. By 1930, Manchester's tram network had grown to Template:Convert, making it the third-largest tram system in the United Kingdom. After World War II, electric trolleybuses and motor buses began to be favoured by local authorities as a cheaper transport alternative, and by 1949 the last Manchester tram line was closed. Trolleybuses were withdrawn from service in 1966.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
OriginsEdit
Greater Manchester's railway network historically suffered from poor north–south connections because Manchester's main railway stations, Piccadilly and Victoria,Template:SfnTemplate:Sfn were built in the 1840s on peripheral locations outside Manchester city centre.Template:SfnTemplate:Sfn The central commercial district had no rail links, and over the years, several unsuccessful schemes were proposed to connect Manchester's rail termini.<ref name="MEN100">Template:Cite news</ref> In the 1960s, transport design studies were undertaken to address the problems of increasing traffic congestion.<ref name="starkie">Template:Cite book</ref> Many urban public transport schemes were evaluated for Manchester, including several types of monorail systems<ref>Template:Cite journal</ref> and metro-style systems.<ref>Template:Cite book</ref><ref name="starkie" />
While the monorail schemes were all abandoned, a scheme to create a tunnel link gained momentum. The SELNEC Passenger Transport Executive — the body formed in 1969 to improve public transport for Manchester and its surrounding municipalities – promoted the 'Picc-Vic tunnel' project. The project was a proposal to link Piccadilly and Victoria stations via a tunnel under the city centre and enable train services to run across the Manchester conurbation.Template:Sfn<ref>Template:Cite news</ref> Greater Manchester County Council (GMC) inherited the project and presented it to the United Kingdom Government in 1974,Template:Sfn but the council failed to secure the necessary funding,Template:Sfn and the project was abandoned in 1977.<ref name="inframanc">Template:Cite book (exhibition catalogue)</ref><ref>Template:Cite news</ref> The Centreline shuttle bus service provided inter-station links for many years.
The Greater Manchester Passenger Transport Executive (GMPTE), the successor to SELNEC, continued to examine possible rail link solutions. Light rail emerged in the early 1980s as a cost-effective option that could make use of existing railway lines and run through the city centre at street level, eliminating the need for costly tunnelling works.<ref name="inframanc"/> A Rail Study Group, composed of officials from British Rail, GMC and GMPTE formally endorsed the Project Light Rail scheme in 1984.Template:Sfn Initial abstract proposals, based on light rail systems in North America and continental Europe,Template:Sfn illustrated a draft Template:Convert network consisting of three lines: Altrincham–Template:Rws/Template:Rws, Bury–Template:Rws/Template:Rws and Template:Rws–Template:Tram. To promote the scheme, GMPTE held a public proof of concept demonstration in March 1987 using a Docklands Light Railway P86 train on a freight-only line adjacent to Debdale Park.Template:Sfn The Project Light Rail proposals were presented to the UK Government for taxpayer funding;Template:Sfn following route revisions in 1984 and 1987,Template:SfnTemplate:Sfn Project Light Rail was approved. Because of the central government's constraints on financial support for innovative transport projects, funding was granted by HM Treasury with the strict condition that the system be constructed in phases.Template:Sfn Additional taxpayer funding came from the European Regional Development Fund and bank lending.Template:Sfn
ConstructionEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
- Metrolink construction phases 1992–2020
- Metrolink phase1.png
Phase 1 (1992)
- Metrolink phase2.png
Phase 2 (1999–2000)
- Metrolink mediacity extensi.png
Template:Tram spur (2010)
- Metrolink phase3a.png
Phase 3a (2011–13)
- Metrolink phase3b.png
Phase 3b (2013–14)
- Metrolink 2CC.png
Second City Crossing (2015–17)
- Metrolink Trafford Line.png
Trafford Park Line (2020)
Phase 1Edit
Parliamentary authority to proceed with Phase 1 construction was obtained with two Acts of Parliament – the Greater Manchester (Light Rapid Transit System) Act 1988 and Greater Manchester (Light Rapid Transit System) (No. 2) Act 1988.Template:Sfn
The first phase of Metrolink involved the conversion of two suburban heavy rail lines to light rail operation — the Bury Line in the north (conversion started in July 1991) and the MSJ&AR line in the south (conversion started December 1991) — and the construction of a street-level tramway through the city centre to connect the two.<ref name=evo>Template:Cite news</ref> Tracks were laid down along a Template:Convert route from Victoria station, via Market Street and St Peter's Square to the G-Mex, with a Template:Convert branch from Piccadilly Gardens to Manchester Piccadilly station.Template:Sfn<ref name="LRTACC">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="TTramsCC">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> This route is now known as the First City Crossing (1CC), and it was built with network expansion in mind.Template:Sfn
A fleet of 26 AnsaldoBreda T-68 light rail vehicles was procured to operate the Template:Convert network.Template:Sfn Construction was carried out by the GMA Group (a consortium of AMEC, GM Buses, John Mowlem & Company and GEC),Template:Sfn costing £145Template:Nbspmillion (equivalent to £Template:InflationTemplate:Nbspmillion in Template:Inflation/year).Template:Inflation-fnTemplate:Sfn
Metrolink was initially scheduled to open in September 1991, but services did not begin until 1992, when the Bury Line of the Metrolink opened from Victoria station to Bury Interchange on 6 April.Template:SfnTemplate:Sfn The first street-level trams began running on 27 April between Victoria and G-Mex (renamed Template:Tram in 2010), and the Altrincham Line opened on 15 June from G-Mex to Altrincham. The branch to Piccadilly station opened on 20 July.Template:Sfn Metrolink was officially opened by Queen Elizabeth II on 17 July 1992.Template:SfnTemplate:Sfn<ref name=oldest>Template:Cite news</ref>
Phase 2Edit
In Phase 2, the Metrolink network was extended westwards to Eccles along the new Template:Convert Eccles Line, as part of the 1990s urban regeneration of Salford Quays,<ref name="Milestones">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> increasing the total Metrolink route length to Template:Convert.<ref>Template:Cite news</ref> The extension cost £160Template:Nbspmillion (equivalent to £Template:InflationTemplate:Nbspmillion in Template:Inflation/year)Template:Inflation-fnTemplate:Sfn and was funded by the GMPTA, the ERDF and private developers.Template:SfnTemplate:Sfn It was constructed 1997–99 by Altram (a consortium of Serco, Ansaldo and John Laing) and six new AnsaldoBreda T-68A trams were bought to operate services on the line, but were also used in other locations across the network.Template:SfnTemplate:Sfn<ref name=metuk>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The line was inaugurated by Prime Minister Tony Blair on 6 December 1999<ref name="LRTA9899">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> as far as Broadway tram stop as the street running section to Eccles Interchange was completed. The Broadway–Eccles section was opened on 21 July 2000, and the complete line was officially opened by Princess Anne on 9 January 2001.<ref>Template:Cite news</ref>
Phase 3Edit
The Phase 3 extension project, nicknamed the "Big Bang", was promoted by GMPTE and the Association of Greater Manchester Authorities (AGMA) in the early 2000s.<ref name=ann>Template:Cite news</ref> The project, costing £489Template:Nbspmillion (£Template:InflationTemplate:Nbspmillion in Template:Inflation/year),Template:Inflation-fn would create four new lines: the Oldham and Rochdale Line, East Manchester Line, South Manchester Line, and Airport Line.<ref name=plan2>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Phase 3 was put in doubt when central government funding was withdrawn due to increasing costs,<ref name=fury>Template:Cite news</ref><ref name=ann/><ref>Template:Cite news</ref> but after negotiations with the Department for Transport, Phase 3 was split into two parts, 3a and 3b, to secure investment.<ref>Template:Cite news</ref><ref name=planb>Template:Cite news</ref>Template:Sfn
The new Template:Convert spur off the Eccles Line to Template:Tram was funded separately by the Northwest Regional Development Agency.<ref name="evo" />Template:Sfn<ref name="metuk" /><ref name="MEN-opening">Template:Cite news</ref> As part of Phase 3, the original blue T-68 trams were also phased out and replaced with a new fleet of Bombardier M5000 trams, which entered service in December 2009.<ref>Template:Cite news</ref>
Beginning in October 2009 with the closure of the Template:Convert Oldham Loop heavy rail line, Phase 3a involved converting this line to light rail operation, including rebuilding all stations on the route and adding several new stops as well,<ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref name="reach">Template:Cite news</ref> re-opening a disused Template:Convert section of the Cheshire Lines Committee railway to use as the first part of the South Manchester Line (up to Template:Tram), and building a new Template:Convert East Manchester Line as far as Template:Tram.<ref name="metuk" /><ref name="catchup" /><ref name="planb" /><ref name="first3a">Template:Cite news</ref> When completed in 2013, Phase 3a increased Metrolink's total network length to Template:Convert.<ref name="NextRochdale">Template:Cite press release</ref><ref>Template:Cite news</ref>
Phase 3b involved the construction of a new Template:Convert Airport Line to Manchester Airport,<ref name=start3b>Template:Cite news</ref> and extending three of the Phase 3a lines: the East Manchester Line to Ashton-under-Lyne;<ref name=ashdids>Template:Cite news</ref> the South Manchester Line to East Didsbury;<ref name=EastDids>Template:Cite news</ref> and adding street-running routes through Oldham and Rochdale town centres to the Oldham and Rochdale Line.Template:SfnTemplate:Sfn<ref name=reach/><ref name=3bcon>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Construction work began in March 2011, and Phase 3b was completed in November 2014 with the Airport Line's opening.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref> Phase 3b was delayed after a failed bid to raise funding through the Greater Manchester Transport Innovation Fund and a proposed traffic congestion charge in 2008. GMPTE and AGMA instead funded Phase 3b through a combination of council tax, government grants, Metrolink fares and contributions from the Manchester Airports Group and other bodies.
Second City CrossingEdit
With increased tram traffic brought about by the expansion of the Metrolink network, it became necessary to build a new route across Manchester City Centre to alleviate congestion and improve capacity.<ref name=2cc/>Template:Sfn<ref name=mini>Template:Cite news</ref>
Known as the Second City Crossing (or 2CC), the project involved laying Template:Convert of tram tracks from St Peter's Square tram stop via Princess Street, Albert Square, Cross Street and Corporation Street to rejoin the original Metrolink line just before Victoria station. One new tram stop was built at Template:Tram.<ref name=2cc>Template:Cite news</ref> The project also involved re-ordering St Peter's Square and re-siting the Cenotaph to accommodate an enlarged tram interchange and junction.<ref>Template:Cite news</ref> The realigned tracks were to run over the site of the former St Peter's Church (demolished 1907). To protect the remaining underground burial vaults of the church, concrete slabs were put in place below street level before the tram tracks were laid.<ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref name="gmaf">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The stone cross marking the location of the former church was restored and re-instated close to its original location, in between the tracks.<ref>Template:Cite news</ref>
Construction began in 2014, and the 2CC route opened fully in February 2017.<ref>Template:Cite news</ref>
Trafford ParkEdit
The Transport & Works Act Order for the 3.4 mile (5.4 km) Trafford Park Line was granted in October 2016.<ref>"Metrolink line to the Trafford Centre will go ahead despite objections from Coronation Street and Manchester United" Template:Webarchive. Manchester Evening News. 14 October 2016.</ref><ref>"Metrolink's Trafford Park £350m Tramline Approved" Template:Webarchive. BBC News. 13 October 2016.</ref><ref>"Powers granted for Manchester Metrolink Trafford Park extension Template:Webarchive". Railway Gazette International (London). 14 October 2016.</ref> This new line includes six tram stops, including, but not limited to, a stop at Wharfside to serve Old Trafford Stadium closer and faster than Old Trafford tram stop, a stop at Imperial War Museum, also providing a closer and faster connection to IWM North from the city centre, the alternative tram option being walking from MediaCityUK, and a stop adjacent to Barton Dock Road, serving Trafford Palazzo. All six stops also opened with new dot matrix displays unique to the rest of the network. Enabling works began in January 2017,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and the first test tram ran in November 2019 between Pomona and Village.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The line finally opened on 22 March 2020.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The COVID-19 pandemic lockdown in the UK on the second day of operation overshadowed news of the new line's opening, leading to it not getting much ridership after the lockdown ended.
LinesEdit
Lines and stopsEdit
CitationClass=web
}}</ref> | |||
Colour | Route | Operating hours | Stops |
---|---|---|---|
Altrincham–
Bury via Market Street |
Mon–Sat daytimeTemplate:Efn | Template:Cslist | |
Altrincham– | Mon–Sun allTemplate:NbhdayTemplate:Efn | Template:Cslist | |
Altrincham–
Etihad Campus via Piccadilly |
Template:Indented plainlist | Template:Cslist | |
Ashton-under-Lyne–
Eccles (via MediaCityUK) |
Mon–Sun allTemplate:NbhdayTemplate:Efn | Template:Cslist | |
Etihad Campus–
MediaCityUK via Piccadilly |
Mon–Sat daytimeTemplate:Efn | Template:Cslist | |
Bury–Piccadilly | Mon–Sun allTemplate:NbhdayTemplate:Efn | Template:Cslist | |
East Didsbury–
Rochdale Town Centre via Exchange Square and Oldham |
Mon–Sun allTemplate:NbhdayTemplate:Efn | Template:Cslist | |
East Didsbury–
Shaw and Crompton via Exchange Square |
Mon–Sat daytimeTemplate:Efn | Template:Cslist | |
The Trafford Centre– | Mon–Sun allTemplate:NbhdayTemplate:Efn | Template:Cslist | |
Manchester Airport–
Victoria via Market Street |
Mon–Sun allTemplate:NbhdayTemplate:Efn | Template:Cslist |
FrequenciesEdit
Before the inauguration, GMPTE's original concept was for Metrolink's operator to provide a service every ten minutes from Bury to Piccadilly and Altrincham to Piccadilly from 06:00 to midnight, Monday to Saturday.Template:Sfn Greater Manchester Metro Limited, the system's original operator, argued for adjustments, citing the need to provide an efficient and commercially viable operation in line with vehicle running times and passenger demand.Template:Sfn Due to power limitations, this pattern was modified to a twelve-minute service throughout the day, doubling to a six-minute service in peak periods, resulting in a "ten trams per hour" service pattern on routes running from Altrincham and Bury to Manchester every six minutes.Template:Sfn Operators were required to provide this level of service at least 98% of the time or incur a financial penalty charge.Template:Sfn This twelve-minute service pattern has been adopted on the rest of the network as the system has grown.<ref name=NextRochdale/><ref name=getquays>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name=brightORL>Template:Cite press release</ref> Heavy snowfall during the winter of 2009/10 impaired Metrolink services and the operator was criticised for failing to have cold weather procedures.<ref name=firm/> This prompted a programme to improve the reliability and performance of the system in freezing conditions.<ref name=firm>Template:Cite news</ref><ref>Template:Cite news</ref> Metrolink operated icebreaker-style vehicles at night during snowfall in January 2013 to provide standard services.<ref>Template:Cite news</ref>
In January 2016, Transport for Greater Manchester agreed on a baseline Service Specification to grade bidders seeking to operate the concession from July 2017, once the Second City Crossing was in operation. In the baseline service pattern, there are no designated 'peak' periods of service operation; instead, there was an 'enhanced' service operating from start of service to 08:00 Monday to Friday, and to 18:00 Saturday; and a 'core' service running at all other times. In the 'enhanced' service pattern, trams ran with a six-minute frequency to Shaw and Crompton, Bury, Ashton-under-Lyne, Altrincham, Manchester Airport and East Didsbury; and with a 12-minute frequency to Rochdale, Eccles and MediaCityUK.
As of 2024, the core service pattern operates exactly one route to every terminus on the Metrolink network, during all operating timesTemplate:Efn, at a 12-minute frequency on all routes (15 minute frequency on Sundays), and the enhanced service pattern operates the core service plus extra services up to Bury, Altrincham, Etihad Campus, Shaw and Crompton, East Didsbury, and MediaCityUK.
All-day services (core)<ref name="Tram times" />
The following services run during all operating times, from 06:00–00:00 on Monday–Thursday, 06:00–01:00 on Friday–Saturday, and 07:00–00:00 on Sundays and bank holidays.
Six services which each run to a 12-minute frequency (24-minute after 00:00, and 15-minute on Sundays):
- Template:RouteBox Template:Tram – Template:Tram
- Template:RouteBox Template:Tram – Template:Tram (via Template:Tram outside Mon–Sat daytime hours)
- Template:RouteBox Template:Tram – Template:Tram
- Template:RouteBox Template:Tram – Template:Tram
- Template:RouteBox Template:Tram – Template:Tram
- Template:RouteBox Template:Tram – Template:Tram
This is the minimum service that the Metrolink can provide whilst bringing trams to all available stops, hence why it is called the 'core' service.
Daytime services (enhanced)<ref name="Tram times">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The following services run alongside the core service during peak times: from 07:00–20:00 on Monday–Friday and 09:00–18:30 on Saturdays, and not operational on Sundays or bank holidays.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Three extra services which each run to a 12-minute frequency (24-minute after 00:00):
- Template:RouteBox Template:Tram – Template:Tram
- Template:RouteBox Etihad Campus – Template:Tram
- Template:RouteBox Template:Tram – Template:Tram
Thus the combined frequency for some routes is every 6 minutes or less.
Other part-day services
The Altrincham – Piccadilly service operates an extended service to Etihad Campus from 20:00–00:00 on Monday–Thursdays, 20:00–01:00 Friday–Saturdays, and 07:00–00:00 (all day) Sundays and bank holidays.
One service which replaces the normal service and runs to Etihad Campus via Piccadilly and runs to a 12-minute frequency (24-minute after 00:00, and 15-minute on Sundays):
Early morning service<ref name="Tram times"/>
The early morning service used to operate from 03:00–06:00 Monday–Saturdays and 03:00–07:00 on Sundays and bank holidays.
One service which ran to a 20-minute frequency:
This was mostly to support airport shift workers and people with early flights, however, these services were removed in March 2020 due to the COVID-19 pandemic. There are currently no plans to reintroduce this service.
Services during COVID-19 pandemic<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Due to changing travel patterns as a result of the COVID-19 pandemic, advice was against all but essential travel, and thus, the Metrolink temporarily introduced a reduced timetable, and trams ran to a 20-minute frequency on the following routes only.
Gradually, in the following months, with more people returning to work and social activities, the service frequency on all routes was increased to 10 minutes during peak times and 20 minutes off-peak Monday–Saturday, and every 15 minutes on Sundays.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Normal service was reintroduced on 5 July 2021, although temporarily removed in late August 2021 due the number of staff having to self isolate.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The two enhanced service routes at the time: Altrincham–Bury direct and Shaw and Crompton–East Didsbury resumed on 31 August and 6 September 2021 respectively.
- Template:RouteBox Template:Tram – Template:Tram
- Template:RouteBox Template:Tram – Template:Tram via Template:Tram
- Template:RouteBox Template:Tram – Template:Tram
- Template:RouteBox Template:Tram – Template:Tram
- Template:RouteBox Template:Tram – Template:Tram
- Template:RouteBox Template:Tram – Template:Tram
Rolling stockEdit
Current fleetEdit
Template:As of, Metrolink operated a fleet of 147 trams.<ref name=":02"/>
Class | Image | Type | Top speed | Length metres |
Capacity | In service |
Fleet numbers |
Routes operating |
Built | Years operated | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
mph | km/h | Std | Sdg | Total | |||||||||
Bombardier M5000 | File:Coupled M5000 trams approaching Holt Town.jpg | Light Rail Vehicle (LRV) | 50 | 80 | 28.4 | 60 | 146 | 206 | 60 | 3001–3060 | Entire network | 2009–2016 | 2009–present |
14 | 3061–3074 | Entire network except Timperley–Altrincham | |||||||||||
66 | 146 | 212 | 46 | 3075–3120 | |||||||||
27 | 3121–3147 | 2018–2022 | 2021–present | ||||||||||
Total | 147 |
Because low-floor tram technology was in its infancy when Metrolink was in its planning stages, and in order to be compatible with the former British Rail stations that Metrolink inherited, the network uses high-floor trams with a platform height of Template:Convert, the same height as main line trains.<ref name="metuk" /><ref name="lrtat68">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Trams on Metrolink operate either single units, or coupled together to form double units, which regularly run on the Altrincham – Bury line and on other lines during peak hours.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Bombardier M5000Edit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
In December 2009, Metrolink took delivery of the first Bombardier M5000 tram. Built by Bombardier Transportation and Vossloh Kiepe, the initial eight M5000s were ordered to allow services to be increased.<ref name=metuk/> They are part of the Bombardier Flexity Swift range of light rail vehicles and have a design similar to the K5000 vehicle used on the Cologne Stadtbahn and Bonn Stadtbahn.<ref name=metuk/><ref name=catchup>Template:Cite news</ref><ref name=oldest/><ref name=up>Template:Cite news</ref><ref name=yellow>Template:Cite news</ref>
With the approval of the spur to MediaCityUK, a further four were ordered.<ref name=metuk/> To provide rolling stock for the phase 3 extensions and replace the existing fleet, the order was increased successively to 94.<ref name=oldest/><ref name=axed>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref> In December 2013, a further 10 M5000s were ordered to provide trams for the Trafford Park Line planned to open in 2020, while in the interim supporting a service between MediaCityUK and Manchester city centre and other capacity enhancements.<ref name=sec>Template:Cite news</ref><ref>Bombardier to Supply 10 Additional Light Rail Vehicles to Manchester Metrolink in the UK Template:Webarchive Bombardier 23 December 2013</ref> In September 2014, a further 16 were ordered; the final one of which was delivered in October 2016, bringing the fleet up to 120.<ref>More M5000s for Metrolink Template:Webarchive British Trams Online 7 July 2014</ref><ref>"Metrolink investment confirmed" Tramways & Urban Transit issue 921 September 2014 page 360</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="RTM120">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
In July 2018, a further 27 were ordered to help relieve overcrowding.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Delivered from November 2020, the final tram was delivered in October 2022.<ref name=":02" />
Ancillary vehiclesEdit
Metrolink has several ancillary vehicles used for maintenance within depots. The "Special Purpose Vehicle", later numbered 1027 with its support wagon 1028, is a bespoke diesel-powered vehicle dating from the networks construction in 1991. It is fitted with a crane, inspection platform, mobile workshop, and capacity for a driver and three passengers. It was designed to assist with vehicle recovery and track and line repairs although to the end of its service life rarely left its base at Queens Road Depot.Template:Sfn By January 2023 both 1027 & 1028 had been withdrawn from service<ref name="auto">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and offered for sale in September 2024.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
In 2020 Metrolink took delivery of a Zephir Crab 2100E, a small battery powered vehicle for use moving trams within the depot. It is based at Queens Road to replace the Special Purpose Vehicle. Trafford depot operates a smaller Zephir Crab 1500E dating from construction of the depot in 2011.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> A Unimog road-rail vehicle was added to the fleet in mid-2022 to support infrastructure inspection and maintenance activities.<ref name="auto"/>
Former fleetEdit
Manchester Metrolink has previously operated the following trams:
Class | Image | Type | Top speed | Length metres |
Capacity | Number | Fleet numbers |
Routes operated |
Built | Years operated | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
mph | km/h | Std | Sdg | Total | |||||||||
AnsaldoBreda T-68 | File:Manchester Metrolink 1001 and 1011at Manchester Victoria.jpg | Tram | 50 | 80 | 29 | 86 | 122 | 208 | 26 | 1001–1026 | Bury Line
Altrincham Line (later Eccles Line) |
1991–1992 | 1992–2014 |
AnsaldoBreda T-68A | File:Manchester Piccadilly station - Metrolink (1).JPG | 6 | 2001–2006 | Eccles Line | 1999 | 1999–2014 |
T-68/68AEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
To commence operations, a fleet of 26 T-68 trams manufactured by AnsaldoBreda in Italy was delivered in 1992.Template:SfnTemplate:Sfn To provide extra trams for the Eccles Line, six modified T-68A trams were purchased in 1999.<ref name=metuk/> The T-68A vehicles were based on the original T-68s but had modifications replacing destination rollblinds with dot matrix displays, and retractable couplers and covered bogies necessary for the high proportion of on-street running close to motor traffic.<ref name=metuk/>
Three of the earlier T-68 fleet were similarly equipped<ref name=metuk/> and were known as T-68Ms.Template:Sfn Mechanically and electrically, the T-68M vehicles were essentially a T-68 with modifications to its brakes, mirrors, and speed limiters to suit the Eccles line.Template:Sfn Initially only these vehicles were permitted to operate the Eccles line but the entire fleet except for 3 (1018, 1019, 1020) were modified between 2008 and 2012 for universal running,<ref name=metuk/> under a programme known as the T-68X Universal Running programme.Template:Sfn
The newer M5000 trams proved to be considerably more reliable than the T-68/A fleet, which averaged 5,000 miles between breakdowns, while the M5000s averaged 20,000 miles. This led to a decision in 2012 to withdraw the entire fleet from service and replace them with M5000s. The T-68 and T-68As were withdrawn between April 2012 and April 2014.<ref name=end>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
T68 1007 is owned by the Manchester Transport Museum Society, who run the Heaton Park Tramway, it remains in store at Old Trafford depot until it can be accommodated at Heaton Park. 1023 remains under the ownership of Transport for Greater Manchester and is at the Crewe Heritage Centre on display.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
San Francisco tramsEdit
In 2002, in the lead up to Manchester hosting the Commonwealth Games, a requirement to increase capacity for the event led to Metrolink investigating the purchase of redundant second-hand Boeing LRV vehicles from the Muni Metro system in San Francisco.<ref name="BoeingsForScrapOrSale!">Template:Cite news</ref> Two were procured for testing at a cost of £170 each, although transport costs added £15,000 to that figure. The trams, numbered 1226 and 1326, were shipped to the UK in January 2002, with 1326 taken to Queen's Road depot and 1226 sent to a research centre in Derby for safety evaluations. 1326 was hauled by the Special purpose vehicle on a test from Queens Road depot to Eccles and back but suffered from a number of derailments. In the end, the proposal was not taken forward as the vehicles were found to be unsuitable and not cost effective for use in the UK with both later being scrapped.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite book</ref>
InfrastructureEdit
LinesEdit
As of August 2022, Metrolink has a network length of Template:Convert and 99 stops<ref name="dft22"/> — along eight lines which radiate from a "central triangular junction at Piccadilly Gardens which forms the hub of the Metrolink system" in Zone 1.Template:Sfn
The lines are: the Airport Line (which terminates at Manchester Airport), the Altrincham Line (which terminates in Altrincham), the Bury Line (which terminates in Bury), the East Manchester Line (which terminates in Ashton-under-Lyne), the Eccles Line (which terminates in Eccles), the Oldham and Rochdale Line (which terminates in Rochdale), the South Manchester Line (which terminates in East Didsbury), and the Trafford Park Line (which terminates at the Trafford Centre).<ref name=servicemap/>
Tram stopsEdit
There are 99 tram stops on Metrolink, as of 2023.<ref name="dft22"/> Low-floor platforms commonly used for light rail throughout the world were ruled out for Metrolink because the system inherited Template:Convert high-floor platforms from British Rail on lines formerly used for heavy rail.Template:Sfn<ref name="LRTAstops">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The first stops on the Bury Line and Altrincham Line, opened in phase one, were formerly railway stations and were changed little from British Rail days, as available funding only allowed minimum upgrades to be made.<ref name="LRTAmethist1">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> When the Oldham and Rochdale Line was converted from a railway, however, all of the former railway stations were completely rebuilt.<ref name="LRTAOldham">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Some stops, such as Template:Tram, are shared between lines, and may be used as interchange stations;<ref name=servicemap/> others, such as Altrincham Interchange, or Template:Tram are transport hubs that integrate with heavy rail and bus stations.<ref name=servicemap/>
Metrolink stops are unstaffed. Each contains at least two ticket vending machines (except for Pomona, which only has one). Card readers are installed on all stop platforms for use with contactless pay-as-you-go, the TfGM 'My Get Me There' smart card, and concessionary passes. All card users are required to touch-in at these platform readers before commencing their journey and to touch-out at their final destination. Stops are provided with help/emergency call points to enable passengers to speak to control. Each stop is monitored by CCTV for public safety, and the images are continuously recorded. Route maps and general information are provided on each platform.<ref name="LRTAstops"/> Each stop has at least one high-floor platform measuring a minimum of Template:Convert wide, accessed by ramp, stairs, escalator, lift or combination thereof.<ref name=saldel/>Template:Sfn Shelters and canopies at stops were supplied by JCDecaux,Template:Sfn and ticket vending machines by Scheidt & Bachmann.Template:Sfn
Power supplyEdit
The trams are electrically powered from 750 V DC overhead lines.Template:Sfn Between 1992 and 2007, electricity for the Metrolink system was procured by the operator, based on price only.<ref name=case/> In 2007, GMPTE changed the contractual requirements to ensure that sustainable power would be factored into choosing an energy supplier, and in July 2007, Metrolink became the first light rail network in the UK with electricity supplied entirely from sustainable energy via hydropower.<ref name=case/> Now, energy for the system is generated by biomass.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
SignallingEdit
The Metrolink operated using two types of signals during Phase 1 and Phase 2, Line Of Sight signals and Two Aspect colour signals.<ref name="auto1">{{#invoke:citation/CS1|citation
|CitationClass=web }}</ref> These signals were controlled with a device called the Vehicle Recognition System (VRS) inside the cab of the tram, which sent information to the control room via a pair of coils on the un-motored centre bogie. <ref name="auto1"/> In preparation for Phase 3, a new device was introduced called the Tram Management System (TMS) as the Two Aspect colour signals would not be able to support the headway between trams (zero minutes) and the level of flexibility required for the new lines. This meant that every line would become fully Line Of Sight.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Two Aspect colour signals were removed between 2012–2022 as more lines were being converted to Line Of Sight. The only section of the Metrolink network that cannot be converted to Line Of Sight signalling is on the Altrincham Line between Timperley–Altrincham, as that section is under Network Rail control.<ref name="auto1"/> Any trams numbered 3061 or higher are not compatible and cannot run on this section of the Altrincham Line.
DepotsEdit
Metrolink has two depots, at Queens Road and Old Trafford: the Metrolink House at Queens Road in Cheetham Hill was the original headquarters of Metrolink.Template:Sfn Constructed during Phase 1 alongside the Bury Line, it served jointly as a control centre, HQ, office space, and depot for the storage, maintenance and repair of vehicles.Template:Sfn Under the original proposals, Metrolink House was intended to be much larger, with a design which would support network expansion, but this design did not obtain the necessary planning permission from Manchester City Council.Template:Sfn Consequently, Metrolink House was scaled down to a Template:Convert £8Template:Nbspmillion site with limited capacity,Template:SfnTemplate:Sfn and, in light of Phase 3a network expansion, the second depot in Old Trafford was built in 2011.Template:SfnTemplate:Sfn This second depot, adjacent to the Old Trafford tram stop, occupies the site of a former warehouse and can stable up to 96 vehicles,Template:Sfn it also has a washing plant and maintenance workshops.<ref name="LRTACS">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> On 7 May 2013 Metrolink completed the transfer of its main operational functions from Queens Road to Old Trafford, meaning its control room – known as the Network Management Centre – is housed jointly with the Customer Services team by its newer depot.<ref>Template:Cite news</ref>
Fares and ticketingEdit
Metrolink fares were initially set by the system's operator,Template:Sfn but are now set by the TfGM Committee at levels that cover both the running costs and the cost of borrowing that has part-funded the expansion of the system;Template:Sfn Metrolink receives no public subsidy.<ref name=greatbreak/>Template:Sfn Fares typically rise each January above the rate of inflation,<ref name=zone/><ref>Template:Cite news</ref> but have been frozen since the last change in 2020.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The fare tariff is based on a division of the network's stops into fare zones.Template:Sfn Persons under five years of age may travel on the Metrolink for free. Persons under 16 years of age, of pensionable age, or with disabilities qualify for concessionary fares, some of which are mandatory and others discretionary, as determined by the Greater Manchester Combined Authority.Template:Sfn The Greater Manchester Combined Authority permits reduced fares for persons under 16 years of age, and free or reduced fares on Metrolink after 9:30Template:Nbspa.m. for pensioners.Template:Sfn In normal circumstances, tickets cannot be purchased on board Metrolink vehicles and must be purchased from a ticket vending machine before boarding the vehicle.Template:Sfn
Fare evasion in 2006 was estimated at 2–6% of all users,<ref>Template:Cite journal</ref> and in 2012 at 2.5% of all users.<ref name=fare>Template:Cite news</ref> Checking tickets and passes and issuing Standard fares (similar to penalty fare) is the responsibility of Metrolink's Passenger Services Representatives (PSRs), who provide security and assistance on the network;Template:Sfn<ref name=fare/> between 1992 and 2008, Greater Manchester Police had a dedicated Metrolink unit responsible for policing the system.<ref>Template:Cite news</ref> The amount of ticket inspectors onboard trams was increased following the Bee Network's launch in September 2023, and the penalty for evading fares also increased.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Thorn EMI designed the original ticket vending machines.Template:Sfn In 2005, GMPTE announced that rail passengers travelling from within Greater Manchester into Manchester city centre could use the Metrolink service in the City Zone for free.<ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Passengers must present a valid rail ticket, correctly dated with Manchester Ctlz as the destination.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2007 TfGM rolled out new ticket vending machines, designed to accept credit/debit card payments and permit the purchase of multiple tickets in a single transaction.Template:Sfn These were replaced in 2009 with touchscreen machines, designed with the Scheidt & Bachmann Ticket XPress system.Template:Sfn
In October 2012, TfGM announced it was devising a more straightforward zonal fare system, comparable to London fare zones, and preparing to introduce 'get me there', the region's new contactless smartcard system, for use on all public transport modes in Greater Manchester, including Metrolink.<ref name=zone>Template:Cite news</ref> After years of consultation, a new system using four concentric zones was implemented on 13 January 2019.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> From 15 July 2019, a new contactless pay-as-you-go service began, allowing passengers to tap in and out on smart readers using their contactless bank cards.<ref name="contactless">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Contactless fares were originally capped to no more than the cost of the equivalent daily travelcard. In September 2021 an additional weekly cap was introduced.<ref name="weekly">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
ServicesEdit
AccessibilityEdit
Metrolink trams and stops have been designed to be accessible to disabled passengers: each stop has been provided with access ramps or lifts, tactile paving, high visibility handrails, disabled boarding points, and help points on the platforms. The trams have also been designed with large areas available for the provision of wheelchairs and pushchairs.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
However, this access was not in the original plans (which were based on tram-side extending steps and low-level platforms in the city centre) and accessibility took four years of concerted campaigning by disabled people in Greater Manchester from 1984 to 1988, and particularly the efforts of Neville Strowger (1939–2015), a disabled person working as the access officer at Manchester City Council, and a founding member of the Greater Manchester Coalition of Disabled People. The campaign was to change the design policy to create full access, including retrofitting access to the legacy train stations on the Bury line and the Altrincham line. An early milestone in the campaign was a large meeting between GMPTE officers and around 70 disabled people at County Hall on 22 November 1984, including a speech from the invited disability rights campaigner Vic Finkelstein. A further key meeting was in May 1987 with over 100 disabled people and elected Councillor Guy Harkin as Chair of GMPTA plus other officials, but the policy in 1987 that was repeated at this meeting was that access would only be possible "if the budget allows." Full access was finally agreed in the summer of 1988, and productive meetings followed with disabled people on the implementation details. This campaigning was researched in detail starting in 2019 and written up in an 8-page pamphlet in February 2020.<ref name=":0">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Mobility scooters were initially banned from Metrolink. However, in 2014 a scheme was introduced whereby scooters could be allowed on trams, provided they have a permit which can be obtained after an assessment of the scooter's size and manoeuvrability.<ref>Template:Cite news</ref>
Currently the Metrolink operator company consults with a group of disabled people, via TfGM's relationship with the independent Disability Design Reference Group, on any proposed changes to the services or infrastructure.<ref name=":0" />
"Well-behaved" dogs are allowed but must be kept on leads (with other conditions).<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Bicycle policyEdit
Metrolink does not allow full-sized bicycles on to trams but does permit the carriage of "fully covered" folding bicycles. The ban on non-folding bicycles was upheld in 2010, despite a campaign by cycling and green groups for the trams to be adapted to allow them.<ref>Template:Cite news</ref> Campaigners against the policy had argued that the ban on bicycles was anomalous, as other large objects such as ironing boards and deckchairs were allowed on the trams under current rules.<ref>Template:Cite news</ref>
Wi-FiEdit
In July 2013, the Transport for Greater Manchester Committee announced that it planned to enhance the experience of travelling on Metrolink by tapping into Manchester City Council's grant from the UK Urban Broadband Fund and using it to provide Metrolink passengers with free Wi-Fi when on board. The scheme began with a trial on a single tram – number 3054 – connected to the FreeBeeMcr broadband network with the intention of rolling it out across the whole Metrolink network by Spring 2015.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> It was rolled out fleet wide in March 2015.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> On board Wi-Fi was later suspended indefinitely in March 2020.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Corporate affairsEdit
Ownership and structureEdit
Manchester Metrolink is owned by TfGM, and is currently operated and maintained by KeolisAmey Metrolink, a joint venture between Keolis and Amey, who were awarded the contract for a period of up to ten years from 15 July 2017.
Between 1992 and 1997 Metrolink was operated and maintained as a concession by Greater Manchester Metro Limited, and between 1997 and 2007 by Serco.<ref>Template:Cite news</ref> When next tendered, a ten-year contract was awarded to the Stagecoach Group from 15 July 2007.<ref>Template:Cite press release</ref><ref>Template:Cite news</ref><ref>Stagecoach ousts Serco to run Manchester trams Rail issue 563 25 April 2007 page 6</ref><ref>Stagecoach takes on trams Rail issue 571 1 August 2007 page 15</ref> On 1 August 2011, RATP Group bought the balance of the contract from Stagecoach.<ref name=saldel/><ref name=rgi20110802 /><ref name=firm/>
In January 2017, the Keolis/Amey consortium was announced as the successful bidder for the operating and maintenance (O&M) contract to run from 15 July 2017.<ref name=Keolistakeover>Southern Rail operator to take over running of Metrolink Manchester Evening News 18 January 2017</ref><ref>KeolisAmey Metrolink Keolis</ref> Unsuccessful competing bidders were RATP, National Express and Transdev.<ref name=Keolistakeover/> KeolisAmey Metrolink's contract was later extended until July 2027.<ref>Transport for Greater Manchester extends Metrolink operator contract with KeolisAmey Metrolink until 2027 Transport for Greater Manchester 11 January 2024</ref>
Business trendsEdit
The key trends in recent years for Manchester Metrolink are (years ending 31 March):
2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Passenger revenueTemplate:Efn (£M) | 51.8 | 56.8 | 62.4 | 67.3 | 74.8 | 82.1 | 82.6 | 26.8 | 52.6 | 70.5 | 81.1 | ||
'Profit' ("Net expenditure")Template:Efn (£M) | Template:Ifsubst style="color:red">−7.13 | 0.58 | Template:Ifsubst style="color:red">−5.20 | Template:Ifsubst style="color:red">−1.96 | Template:Ifsubst style="color:red">−5.16 | Template:Ifsubst style="color:red">−2.20 | Template:Ifsubst style="color:red">-1.06 | Template:Ifsubst style="color:red">-11.72 | |||||
Number of passengersTemplate:Efn (M) | 29.2 | 31.2 | 34.3 | 37.8 | 41.2 | 43.7 | 44.3 | 10.3 | 26.0 | 36.0 | 42.0 | ||
Number of trams (at year end) | 93 | 109 | 120 | 120 | 120 | 120 | 120 | 124 | 147 | 147 | |||
Notes/sources | <ref name=statsrelease/><ref name="LRT"/> <ref name="BTO"/> |
<ref name=statsrelease/><ref name="LRT"/> <ref name="BTO"/> |
<ref name=statsrelease/><ref name="LRT"/> <ref name="Accounts"/> |
<ref name=statsrelease/><ref name="LRT"/> <ref name="Accounts"/> |
<ref name=statsrelease/><ref name="LRT"/> <ref name="Accounts"/> |
citation | CitationClass=web
}}</ref> |
citation | CitationClass=web
}}</ref> |
CitationClass=web
}}</ref> |
citation | CitationClass=web
}}</ref> |
CitationClass=web
}}</ref> |
Template:Notelist |
Activities in the financial year 2020/21 were severely reduced by the impact of the coronavirus pandemic; the shortfall in fare income was funded by a grant from the UK central government's Department for Transport.<ref name="Accounts2021"/>
Passenger numbersEdit
Detailed passenger journeys since Metrolink commenced operations in 1992 were:
Estimated passenger journeys (millions) made on Metrolink per financial year | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Year | Passenger journeys | Year | Passenger journeys | Year | Passenger journeys | Year | Passenger journeys | Year | Passenger journeys | |||||
Template:Nowrap | 8.1 | Template:Nowrap | 14.2 | Template:Nowrap | 19.8 | Template:Nowrap | 29.2 | Template:Nowrap | 10.3 | |||||
1993Template:Ndash94 | 11.3 | 2000Template:Ndash01 | 17.2 | 2007Template:Ndash08 | 20.0 | 2014Template:Ndash15 | 31.2 | 2021Template:Ndash22 | 26.0 | |||||
1994Template:Ndash95 | 12.3 | 2001Template:Ndash02 | 18.2 | 2008Template:Ndash09 | 21.1 | 2015Template:Ndash16 | 34.3 | 2022Template:Ndash23 | 36.0 | |||||
1995Template:Ndash96 | 12.6 | 2002Template:Ndash03 | 18.8 | 2009Template:Ndash10 | 19.6 | 2016Template:Ndash17 | 37.8 | 2023Template:Ndash24 | 42.0 | |||||
1996Template:Ndash97 | 13.4 | 2003Template:Ndash04 | 18.9 | 2010Template:Ndash11 | 19.2 | 2017Template:Ndash18 | 41.2 | 2024-25 | - | |||||
1997Template:Ndash98 | 13.8 | 2004Template:Ndash05 | 19.7 | 2011Template:Ndash12 | 21.8 | 2018Template:Ndash19 | 43.7 | |||||||
1998Template:Ndash99 | 13.2 | 2005Template:Ndash06 | 19.9 | 2012Template:Ndash13 | 25.0 | 2019Template:Ndash20 | 44.3 | |||||||
Estimates provided by TfGM to the Department for Transport,<ref name="dftAnnual"/> based on sales from ticket machines.<ref group="note">Estimates excludes free travel such as Concessionary Bus Pass for pensioners and tickets sold through other vendors.<ref name=stats>{{#invoke:citation/CS1|citation | CitationClass=web
}}</ref></ref> |
Metrolink revised its method for calculating passenger boardings in 2010/11, meaning figures are not directly comparable with previous years.<ref name="stats" />
A survey in 2012 revealed that 12% of people in Greater Manchester use Metrolink to travel to work, and 8% use the system every day.<ref name=greatbreak/> The system is most commonly used by 21- to 30-year-olds, and was used most markedly by residents of the Metropolitan Borough of Bury — accounting for around a third of their commuter journeys.<ref name=greatbreak>Template:Cite news</ref>
Passenger numbers were severely reduced due to the impact of the COVID-19 pandemic, decreasing 76.7% in the year 2020/21.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In the year 2021/22, passenger numbers were still significantly below the level achieved before the pandemic.<ref name="dftAnnual"/>
Passenger satisfactionEdit
A survey in 2012 revealed that passengers who used Metrolink every day for commuting rated service levels as poor and/or unreliable, with those respondents particularly frustrated by delays and disruptions.<ref name=greatbreak/> TfGM recognised that the older vehicles in its fleet – the T68/T68As — were outdated and the cause of much disruption, and agreed to replace them with M5000s by 2014.<ref name=oldest/><ref name=axed/> Among those who used Metrolink less regularly, the system scored far better in the survey.<ref name=greatbreak/> A survey in 2013 by the non-departmental government body Passenger Focus found that of the five major light rail systems in the United Kingdom – Metrolink, Sheffield Supertram, Nottingham Express Transit, Midlands Metro and Blackpool tramway – Metrolink had the lowest overall satisfaction rating in the United Kingdom. Respondents were surveyed on value for money, punctuality, seating availability, tram stops and overall satisfaction. Metrolink was below average on all criteria, and 47% believed Metrolink was value for money compared to a national average of 60%.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Subsequent surveys have shown increases in passenger satisfaction. A further survey in late 2015 by watchdog Transport Focus, found that satisfaction levels had increased; 89% of passengers surveyed said they were either 'very' or 'fairly' satisfied with their overall journey, up from 83% in 2013, but still below the national average of 92%. It also found that 58% felt the service was value for money.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The national average rating for value for money on all tram networks was 69%.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The follow-up survey in 2016 found further improvements, with 90% of respondents reporting they were either 'very' or 'fairly' satisfied with their overall journey, compared to the national average of 93%. 62% now felt the service was value for money, against a national average still of 69%, which although improved was still the lowest ranking of the six systems covered by the survey.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In early 2020, another survey was conducted, finding that 59% felt Metrolink was value for money.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Corporate identityEdit
The standard corporate identity across the Metrolink system uses a pale yellow and metallic silver colour scheme, with a logotype that consists of a diamond motif formed from a pattern of repeating circles and the Metrolink name. The logo, signage and publicity use the Pantograph sans regular typeface. Tram livery features yellow at the vehicle ends with grey sides and black doors, and a pattern of circles.
The corporate identity was created in October 2008 by Hemisphere Design & Marketing Consultants of Manchester, in collaboration with designer Peter Saville and the transport design agency Design Triangle.<ref name="hemisphere">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="MEN-design">Template:Cite news</ref><ref name=evo/> The Pantograph typeface was specially commissioned from the Dalton Maag type foundry.<ref name="daltonmaag">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The design standard was applied to the Metrolink network when the new M5000 trams were introduced to the network.<ref name="gmpte-newtrams">Template:Cite press release</ref> Hemisphere chose yellow for its high visibility and to reflect Greater Manchester's culture of confidence and optimism.Template:Sfn
When the Metrolink network first came into operation in 1992, it used a system-wide colour scheme and vehicle livery of aquamarine, black and grey, along with a stylised "M" monogram placed at an angle within a circle. This branding, along with the Metrolink brand name, was devised by Fitch RS and Design Triangle,Template:SfnTemplate:Sfn and first revealed at a press launch in June 1988.Template:SfnTemplate:Sfn Before this, during the planning stage, the system was known as "Light Rapid Transit" (LRT) and promotional material used an orange and brown identity used by Greater Manchester Transport and GM Buses.Template:SfnTemplate:Sfn
Public relationsEdit
Transport planners in Greater Manchester describe Metrolink as both "an icon of Greater Manchester",Template:Sfn and "an integral part of the landscape in Greater Manchester".<ref name=moving>Template:Cite news</ref> The Guardian describes Metrolink as "Manchester's efficient and much-loved tram system".<ref name=fury/> Under the ownership of the Guardian Media Group, the Manchester Evening News spearheaded the Get Our Metrolink Back on Track campaign in 2004–05.<ref name=oldhamsuccess>Template:Cite news</ref> Under Trinity Mirror ownership, the Manchester Evening News used the Freedom of Information Act 2000 to reveal that Metrolink received over 10,000 complaints between May 2011 and May 2012.<ref name=complaints>Template:Cite news</ref>
Metrolink has had close connections with popular culture in Manchester and has taken advantage of the city's strong associations with football culture. Metrolink has been a "Football Development Partner" with the Manchester Football Association since August 2010,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> meaning it is the association's Official Travel Partner and supports grassroots association football in Greater Manchester by selecting a "Team of the Month".<ref>Template:Cite news</ref> In 2013, then Manchester City manager Roberto Mancini and players Joe Hart, Vincent Kompany and James Milner recorded special stop announcements to be used on Metrolink's East Manchester Line on dates when Manchester City play at home at the City of Manchester Stadium (served by the Etihad Campus tram stop). The announcements were first used on 17 February 2013, for Manchester City's FA Cup fifth-round tie against Leeds United<ref>Template:Cite news</ref>
Metrolink is a sponsor of the annual Manchester Food and Drink Festival.<ref>Template:Cite news</ref>
Metrolink has also featured in television drama. On 6 December 2010, the soap opera Coronation Street featured a storyline with an explosion which caused a crash on the Metrolink system at Weatherfield. The episode was written to celebrate the soap opera's 50th anniversary.<ref>Template:Cite news</ref> Although a fictitious event, at least six calls were made to GMPTE asking if services had been affected.<ref>Template:Cite news</ref>
Future developmentsEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} Many speculative expansion proposals exist for new lines and stops, including the addition of tram-train technology.<ref name="stalybridge"/>
Pathfinder NorthEdit
As part of efforts to introduce tram-trains — vehicles that can operate on both light and heavy rail networks — the Greater Manchester Combined Authority (GMCA) proposed three options for initial pathfinder schemes to test the application in Greater Manchester. One of these schemes, Pathfinder North, was submitted for funding as part of the government's City Region Sustainable Transport Settlement (CRSTS) fund. Pathfinder North proposes a new tram-train service from Oldham on Metrolink's Oldham & Rochdale line, connecting to the local heavy rail network at Rochdale railway station, and continuing on to Heywood and Bury on an existing railway no longer in regular passenger use.<ref name="bouncingback">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="rochdale">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In July 2022 the GMCA received confirmation of initial funding to develop the pathfinder, including the purchase of up to seven new tram-train vehicles to run the service.<ref name="CRSTS">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
HS2 integrationEdit
As part of (now rejected) developments related to bringing High Speed 2 and Northern Powerhouse Rail to Manchester, High Speed Two Limited had proposed the present two-platform Piccadilly Metrolink stop at ground-level below the existing station platforms be relocated.<ref name=F1>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> A new larger four-platform stop located underground below the Manchester Piccadilly High Speed station was planned to replace it. Provision for a second ground-level Metrolink stop at the eastern end of the high speed station to service future Metrolink extensions, to be called Piccadilly Central, also formed part of the plans. At the proposed Manchester Airport High Speed station provision for a new Metrolink stop — potentially serving an extension from the existing Airport line — was also envisaged.<ref name="F2">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
See alsoEdit
- List of tram and light-rail transit systems
- Manchester Corporation Tramways
- Transport in Manchester
- List of town tramway systems in England
- List of town tramway systems in the United Kingdom
NotesEdit
ReferencesEdit
BibliographyEdit
- Template:Cite book
- Template:Cite book
- Template:Cite book
- Template:Cite book
- Template:Cite bookTemplate:Dead link
- Template:Cite bookTemplate:Dead link
- Template:Cite bookTemplate:Dead link
- Template:Cite book
- Template:Cite book
- Template:Cite book
- Template:Cite book
- Template:Cite book
- Template:Cite book
- Template:Cite book
- Worthington, Barry (2014) The Metrolink Companion. Sigma Leisure. Template:ISBN
- Template:Cite book
External linksEdit
Template:Sister project Template:Attached KML
- Template:Official website
- Official route map
- www.lrta.org/manchester, a historical account of Metrolink from the Light Rail Transit Association
Template:Manchester Metrolink tram stops Template:Transport in Greater Manchester Template:UK light rail {{#invoke:Navbox|navbox}} Template:Keolis Template:StagecoachGroup