Template:Short description Template:Use dmy dates Template:Use Australian English Template:Infobox Bus transit Template:Multiple image

Adelaide Metro is the public transport system of the Adelaide area, around the capital city of South Australia. It is an intermodal system offering an integrated network of bus, tram, and train services throughout the metropolitan area. The network has an annual patronage of 79.9 million, of which 51 million journeys are by bus, 15.6 million by train, and 9.4 million by tram.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The system has evolved heavily over the past fifteen years, and patronage increased dramatically during the 2014–15 period, a 5.5 percent increase on the 2013 figures due to electrification of frequented lines.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Adelaide Metro began in 2000 with the privatisation of existing government-operated bus routes. Services are now run by two private operators{{ safesubst:#invoke:Unsubst||date=__DATE__ |$B= Template:Fix }} and united with common ticketing systems, marketing, liveries and signage under the supervision of the state government's Department for Infrastructure and Transport. Since the 2010s, energy sustainability and eco-friendly transport has been a major focus for Adelaide Metro. Hence, the fleet has been progressively upgraded with electric trains and solar-powered buses–one of which, known as the Tindo electric bus, is 100% solar powered and the first of its kind in the world.<ref>Template:Cite news</ref><ref name=solar-bus>Template:Cite news</ref> Despite this, as of 2016, almost 80 percent of Adelaide's metropolitan buses still run on diesel fuel rather than biodiesel or batteries.<ref name="Diesel">Template:Cite news</ref>

Currently, the Adelaide Metro encompasses seven different train lines, the sole Glenelg tram line, which is the only one of Adelaide's tramways to survive the 1950s and the only one to be integrated into the current system, with extensions added in the 2010s, and over 300 bus routes. <ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

HistoryEdit

The Adelaide Metro is a brand introduced in April 2000, following the second round of tenders privatisation of formerly government-operated bus services.<ref>Template:Cite news</ref><ref>"Adelaide Metro Introduced" Australian Bus Panorama issue 16/1 August 2000 page 12</ref>

The public transport system in Adelaide has previously been known under several names. The State Transport Authority was formed in 1974, combining the metropolitan rail operations of the former South Australian Railways Commission, and the bus and tram operations of the former Municipal Tramways Trust. Adelaide removed almost all tramlines from the 1930s to 1958 leaving only the Glenelg line. This tramline was extended in 2007 by the Department of Transport, Energy & Infrastructure (DTEI), and again to the Adelaide Entertainment Centre in 2010. In July 1994, the STA was abolished and government public transport services were transferred to TransAdelaide, a publicly owned corporation.

In 1995–96, there was a partial tendering of the bus services. TransAdelaide retained three contract regions, Serco won two contract regions, and Hills Transit a joint venture between Australian Transit Enterprises and TransAdelaide, one.<ref>"Hills Transit" Australian Bus Panorama issue 11/3 October 1995 page 33</ref><ref name=Wallis&Bray2001>Template:Cite journal</ref> Services were run and marketed under each operator's name, presenting a disjointed network to the public.

The 2000 round of tenders ended TransAdelaide's direct operation of bus services, while retaining the train and tram services. Serco won the North-South, Outer North, and Outer North-East contract areas. SouthLink won the Outer South contract area. Torrens Transit won the East-West contract area. City Free services and Transitplus, a joint venture between Australian Transit Enterprises and TransAdelaide, won the Hills contract area.<ref name=Wallis&Bray2001/> The Adelaide Metro brand was applied across all transport operators, appearing to the public as a unified network, with common livery, timetable designs and a city Information Centre.

Environmental IncentivesEdit

The State Government has pledged that the Adelaide Metro would use cleaner fuels like biodiesel and natural gas in an effort to make Adelaide a carbon neutral city. In 2016, nearly 80 percent of the Adelaide Metro buses ran on diesel, which is harmful for the environment due to the presence of sulfur.<ref name="Diesel" /> In 2023, the state government announced that a feasibility study was underway to replace Adelaide Metro's ageing diesel train fleet with zero-emission technology.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

ServicesEdit

BusesEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}

The largest element of Adelaide's public transport system is a fleet of diesel and natural gas powered buses. The majority of services terminate in the Adelaide city centre, suburban railway stations or shopping centre interchanges. As contracts are revised for privatised bus operations, more cross suburban routes are added to the network. In the past, bus routes were largely focused on moving passengers from the suburbs to the CBD.

A major component of the Adelaide Metro bus service is the O-Bahn guided busway to Modbury, carrying around 9 million passengers a year. From its opening in 1986 until August 2011 it was the world's longest busway, with a length of Template:Convert. It remains the world's fastest busway with a maximum permitted speed of Template:Cvt. Away from the O-Bahn, whilst there have been dedicated bus lanes and bus-only signal phases at some traffic lights provided for a number of years, a major improvement to bus priority and reliability arrived with the delivery in July 2012 of the CBD Bus Lane project.<ref>Bus priority lane project Adelaide Metro July 2012</ref>

Adelaide Metro buses are split up geographically into six contract regions, with services operated by Torrens Connect, Torrens Transit, SouthLink and Busways. The current contracts began in July 2020 for a period of eight years, with an option to extend for two years.<ref>Adelaide Bus and Public Transport Contracts Announced Australasian Bus & Coach 10 March 2020</ref>

TrainsEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} The Adelaide suburban railway network consists of seven lines. On 31 January 2021, operations were contracted to Keolis Downer.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2023, the state government announced that rail services would return to government operation in January 2025, fulfilling an election commitment by the South Australian Labor Party.<ref name=":0">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Keolis Downer would then continue to provide maintenance, customer and security services until 2027. The handover of operations back to state government was completed on 2 February 2025.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Until 2014, the suburban network was the only one in Australia to operate solely with diesel railcars. Between 2013–2014, the full lengths of the Seaford and Tonsley lines were electrified, as well as the adjacent segment of the Belair line from Goodwood to its terminus at Adelaide.<ref name="elec">{{#invoke:citation/CS1|citation |CitationClass=web }} Government of South Australia</ref> Electric trains have run on the Seaford and Tonsley lines since 2014. Although the original plans were to electrify the remaining three lines, they were abandoned in 2012.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Gawler line was electrified in 2022.

As at March 2025, the fleet consists of 50 3000/3100 class diesel railcars and 34 three-carriage 4000 class electric multiple units.<ref>Bombardier Wins Contract to Supply 25 kV Railcars for Adelaide, Australia Template:Webarchive Bombardier 31 March 2011</ref> All the remaining 2000/2100 class train cars were retired from service in August 2015.

Adelaide's rail lines all run into Adelaide railway station in the CBD. They are:

Line Length First service Information Electrified Map
Template:Rail color box Template:Convert 1883 Adelaide to Bridgewater opened 1883, Belair to Bridgewater closed 1987. The Adelaide to Melbourne main line via Belair and Bridgewater was converted to standard gauge in 1995, leaving one broad-gauge track from Goodwood to Belair. Template:Partial Template:Rapid transit OSM map
Template:Rail color box Template:Convert 1857 Adelaide to Gawler opened 1857, Gawler to Gawler Central opened 1911. Template:Ya Template:Rapid transit OSM map
Template:Rail color box Template:Convert 1882 Woodville to Grange opened 1882. Grange to Henley Beach 1894–1957, now demolished. Services share use of the Outer Harbor line until branching at Woodville. Template:Sdash Template:Rapid transit OSM map
Template:Rail color box Template:Convert 1856 Adelaide to Port Dock opened 1856, Port Adelaide to Outer Harbor opened 1908. Template:Sdash Template:Rapid transit OSM map
Template:Rail color box 12.0 kilometres (7.5 miles) 1856 Adelaide to Port Dock opened 1856, Port Dock spur closed 1981, rebuilt 2024. Services share use of the Outer Harbor line until branching north of Alberton. Template:Sdash Not Available
Template:Rail color box Template:Convert 1913 Adelaide to Marino opened 1913, Marino to Hallett Cove opened 1915, Lonsdale to Christie Downs opened 1976, Christie Downs to Noarlunga Centre opened 1978, Noarlunga Centre to Seaford opened 2014. Template:Ya Template:Rapid transit OSM map
Template:Rail color box Template:Convert 1966 Woodlands Park to Tonsley opened 1966, Tonsley to Flinders opened 2020. Services share usage of the Seaford line until branching at Woodlands Park. Template:Ya Template:Rapid transit OSM map

Rolling stockEdit

Class Image Type Top speed
(km/h)
Builders Built Number Lines Served Notes
3000 File:Adelaide Metro Hybrid 3000 Railcar.jpg DMU 130 Comeng
Clyde Engineering
1988–1996 30 Template:Rcb
Template:Rcb
Template:Rcb
Template:Rcb
Interiors refurbished 2011 and 2021–22.

Mechanically refurbished 2018–19.

3100 File:Adelaide Metro 3100 class railcar.jpg 40
4000
(A-City)
File:Adelaide Metro 4000 Class EMU at Hallett Cove.jpg EMU 110 Bombardier
AlstomTemplate:Efn
2013–2015,
2019–2023
34 3-car sets Template:Rcb
Template:Rcb
Template:Rcb

TramsEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}

Adelaide's once extensive tram network was dismantled in the middle of the 20th century, leaving only the Glenelg tram running Template:Convert between Victoria Square in the city-centre and Moseley Square on the beachfront at Glenelg. The majority of the line is on a dedicated corridor though the western suburbs, and travels on roadway in the city from the terminus to South Terrace and along Jetty Road in Glenelg.

An extension of the line from Victoria Square down King William Street then along North Terrace opened in October 2007.<ref>Official opening for tram extension Template:Webarchive ABC News 14 October 2007</ref> A further extension along Port Road to the Adelaide Entertainment Centre opened in December 2009. The line has stops adjacent to key city points, including Rundle Mall, the Adelaide Railway Station and the City West campus of the University of South Australia.<ref>Adelaide Tramline Extension Project 2007 Template:Webarchive Department for Transport, Energy & Infrastructure</ref><ref>Tramline Extension Project – Victoria Square to City West Template:Webarchive Department of Planning, Transport & Infrastructure</ref>

A 2018 extension added stops adjacent to more key locations including the Festival Theatre, the Art Gallery, the University of Adelaide and the Adelaide Botanic Garden.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Construction this new junction, branch lines along the eastern end of North Terrace and King William Road and four new stops began in July/August 2017 and opened in October 2018.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> There is no fare charged on certain sections of the line.

The line is operated from Glengowrie depot, with 15 Bombardier Flexity Classic trams built between 2005 and 2010<ref>Flexity Class Template:Webarchive Vicsig</ref> and nine Alstom Citadis trams that were built for, but were surplus to their needs of Metro Ligero, Madrid in 2009.<ref>New European trams a massive boost to Adelaide network Template:Webarchive Rail Express 22 June 2009</ref><ref>Spanish discovery Template:Webarchive New Connections (Infrastructure SA) issue 4 2009</ref><ref>Citadis Class Template:Webarchive Vicsig</ref> The latter were modified by Yarra Trams' Preston Workshops before entering service. A further three unused former Madrid Citadis trams entered service in 2018.<ref>SA mid-year budget review: $20 million for more Adelaide trams and a new spur line Template:Webarchive ABC News 15 December 2016</ref><ref>"Here & There" Trolley Wire issue 352 February 2018 page 19</ref>

In July 2019, the government announced the provision of tram services would be contracted out.<ref name=ABC010719>Template:Cite news</ref> Torrens Connect began operating the trams in July 2020.<ref name=DPTI20Mar20>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> As part of an election commitment, the government announced in 2023 that tram services would return to public ownership by July 2025.<ref name=":0" />

InterchangesEdit

According to Adelaide Metro, interchanges "provide convenient connections between buses and trains. Many also feature Park 'n' Ride services and bike storage."<ref>{{#invoke:citation/CS1|citation |CitationClass=web

}}</ref>

TicketingEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} The Adelaide Metro ticketing system is multi-modal, meaning that one ticket can be used to transfer between trains, trams and buses, regardless of the service provider. In September 1987, the Metroticket system developed by Crouzet was introduced.<ref>Tickets please The Recorder November 1987 page 22</ref><ref>Ticket Machines Fleetline issue 151 February 1988 page 45</ref> This used magnetic strip technology. In 2010, a contract to introduce the metroCARD smartcard ticketing system was awarded to Affiliated Computer Services.<ref>Smarter ticketing on the way Template:Webarchive New Connections Infrastructure SA issue 6 2010</ref> It was rolled out in November 2012.<ref>Public transport Metrocard ticketing up and running on SA buses, trams and trains by November Template:Webarchive Adelaide Advertiser 19 September 2012</ref> The older system was phased out in 2015.

In 2021, as part of a staged upgrade to Adelaide Metro's ticketing system, contactless payments have been rolled out on all trams, allowing passengers to use debit and credit cards to pay for fares.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2022, this roll-out continued on O-Bahn bus services, and as of 2023, is now rolling out network-wide, including all remaining buses, and trains.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In 2024, Adelaide Metro released the Adelaide Metro Buy & Go App, this app allows passengers to buy tickets to be used on Buses, Tram and train leaving the Adelaide Railway Station. The app will be rolled out to all train users by late 2025.

See alsoEdit

NotesEdit

Template:Notelist

ReferencesEdit

Template:Reflist

External linksEdit

Template:Adelaide public transport

Template:Authority control