Template:Short description Template:Use dmy dates Template:Use British English Template:More citations needed Template:Infobox locomotive The British Railways Standard Class 5MT Template:Whyte is one of the 12 BR standard classes of steam locomotive built by British Railways in the 1950s. It was essentially a development of the LMS Stanier Class 5 4-6-0 ("Black Five"). A total of 172 were built between 1951 and 1957.

BackgroundEdit

William Stanier's Black Five had been the most successful mixed-traffic type in Great Britain. Construction of the Black Fives had started in 1934 and continued past nationalisation to 1951. A new set of 'standard' locomotives was to be built by British Railways, based on LMS designs and incorporating modern ideas.

In particular, the Standard design incorporated features designed to make disposal of the engine after a working "turn" easier: a self-cleaning smokebox and a rocking grate removed the necessity for crews to undertake dirty and strenuous duties at the end of a long shift.<ref>Template:Cite book</ref> This was a necessary investment with the ever-increasing costs of labour following the Second World War.

The original design proposal for the class 5 locomotive had a Template:Whyte wheel arrangement,<ref>*Template:Cite journal</ref> similar in concept to the Bulleid Light Pacifics that performed impressively during the 1948 Locomotive Exchanges. However this was deemed unnecessarily large and costly for a class 5 power requirement, so the successful LMS Class 5 Template:Whyte design was used as the basis instead. The pacific design went on to be enlarged and used for the BR Standard Class 6.

Design and constructionEdit

File:Chester General 5 railway station 2115460 fecdef70.jpg
73140 with Caprotti valve gear and a big tender at Chester General in 1964.

The design work was done at the ex-LNER Doncaster Works but the bulk of the construction was done at Derby Works. The locomotive featured a BR standard boiler very similar in dimensions to the Stanier Type 3B fitted to the Black Fives, but made from manganese steel instead of nickel steel. The most obvious visible changes were a higher running plate, slightly enlarged driving wheels (from Template:Convert to Template:Convert), increased cylinder bore (from 18½ in (457 mm) to 19 in(483 mm)), a standard cab with external pipework and the regulator gland on the driver's side of the boiler below the dome. Many of these changes were to reduce maintenance or to incorporate standard components that could be shared between other standard classes.

The first of the class, 73000, was outshopped from Derby in April 1951 and 30 were in service by January 1952. There was then a gap in construction before Derby resumed building its remaining 100 engines. 42 were built at Doncaster, starting in August 1955 and finishing in May 1957, with Derby's last engine following a month later.

Thirty engines, numbers 73125 to 73154, were built with Caprotti valve gear and poppet valves.

Table of orders
Number Date Builder Tender Valve gear Notes
73000–29 1951 Derby BR1 Walschaerts 25 for LMR, 5 for ScR
73030–49 1953 Derby BR1 Walschaerts 10 for LMR, 10 for ScR
73050–52 1954 Derby BR1G Walschaerts for SR (S&DJR)
73053–64 1954 Derby BR1H Walschaerts 10 for LMR, 2 for ScR
73065–71 1954 Derby BR1C Walschaerts for LMR
73072–79 1955 Derby BR1C Walschaerts 3 for LMR, 5 for ScR
73080–89 1955 Derby BR1B Walschaerts for SR
73090–99 1955 Derby BR1C Walschaerts for LMR
73100–09 1955 Doncaster BR1B Walschaerts for ScR
73110–19 1955 Doncaster BR1F Walschaerts for SR
73120–-24 1956 Doncaster BR1B Walschaerts for ScR
73125–34 1956 Derby BR1B Caprotti Poppet valves; for WR
75135–44 1956 Derby BR1C Caprotti Poppet valves; for LMR
73145–54 1957 Derby BR1B Caprotti Poppet valves; for ScR
73155–59 1956 Doncaster BR1B Walschaerts for ER
73159-71 1957 Doncaster BR1B Walschaerts for NER

In serviceEdit

These locomotives had a trouble-free introduction in comparison to several of the other Standard classes and were used interchangeably with the pre-nationalisation class 5 engines they supplemented. They were utilised on duties varying from fast passenger trains to slow unfitted freight trains, displaying their versatility.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite book</ref><ref>Template:Cite book</ref><ref>Template:Cite book</ref>

Different regional allocations had differing tender designs, with locomotives assigned to the Southern Region having tenders with high water capacity to make up for the lack of water troughs.

Like the "Clan" class locomotives, the Standard 5s, with their high-stepped running board, were partly conceived to be more economical and serviceable replacements for the Bulleid Pacific. The Standard 5s could also run quite fast, with many drivers claiming they could easily reach just under Template:Cvt.<ref>Template:Cite book</ref> Like the Clans, which could only manage one more carriage on an express than a 'Five', it took footplate crews time to get accustomed to them. They began reaching full potential when different firing techniques to let them steam using lower quality coal were developed.<ref>Template:Cite AV media</ref> They pulled much of the traffic on the last express lines for steam in the mid and late 1960s, such as Edinburgh-Aberdeen, London- Southampton-Bournemouth- Weymouth and local express traffic in the North and Midlands around Sheffield and Leeds. They were also used on the locals between Liverpool, Manchester and Blackpool, some lasting to the very end of steam in 1968.Template:Fact

NamingEdit

File:Battledown Flyover Cornwall - Waterloo express coming under geograph-2744322-by-Ben-Brooksbank.jpg
Named Class 5MT, No. 73113 Lyonesse at Battledown flyover. The nameplate is positioned above the centre driving wheel.

In 1959, 20 of the Southern Region locomotives were named, the names being transferred from SR King Arthur class locos that were then being withdrawn.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite book</ref> These were: Template:Columns-list

WithdrawalEdit

Table of withdrawals
Year Quantity in
service at
start of year
Quantity
withdrawn
Locomotive numbers Notes
1964 172 15 73012/17/24/27/46–47/52/58/61/74/76,
73109/16/61/64.
1965 157 43 73001/03/08/15/21/23/30–32/36/38/41–42/44/49/51/54/56/62–63/68/75/77/84/90–91,
73103–04/06/11–12/22–24/47–48/52/62–63/65–68.
1966 114 38 73005/07/09/13/16/28/55/57/72/78/80–83/86–89/95/98–99,
73101–02/05/07–08/14/20–21/45/49–51/53–54/69–71.
1967 76 53 73002/04/06/11/14/18–20/22/25–26/29/37/39/43/45/48/59–60/64–66/70–71/73/79/85/92–94/96–97,
73100/10/13/15/17–19/27/29–30/37/39–41/44/46/55–56/58–60.
1968 23 23 73000/10/33–35/40/50/53/67/69,
73125–26/28/31–36/38/42–43/57.

Accidents and incidentsEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
  • On 25 August 1958, locomotive No. 73042 was hauling a sleeper car train which overran a signal and was in a head-on collision with a train formed from two electric multiple units at Template:Rws, East Sussex. Five people were killed and 40 were injured.
  • In 1958, locomotive No. 73111 was hauling a passenger train that derailed at Millbrook, Hampshire due to a faulty point motor moving a set of points under the train.<ref name=Bishop>Template:Cite book</ref>

Variations & proposed changesEdit

The main variation across the class was the valve gear, with 142 using Walschaerts valve gear and the remaining 30 using British Caprotti valve gear. There was little difference in performance between the two groups, but the Caprotti fitted engines had a reputation for being good performers at higher speeds. There was potential for more BR standard locomotives to have Caprotti valve gear fitted as it allowed for longer periods between inspections, offsetting the higher initial cost of this valve gear.

Doncaster had designed double chimneys for the class, similar to the ones used on several of the BR Standard Class 4 4-6-0. If applied, this would have improved the draughting and increased the efficiency of the locomotives. With the Modernisation Plan of 1955 and the good performance of the class from the outset, these plans were shelved permanently.

Another proposal was to produce freight locomotives based from this design in response to criticism by the Western Region on the BR Standard Class 9F. The management believed that the 9Fs were too large and powerful for most heavy freight traffic, along with being far more expensive to build and operate than the older 2-8-0 locomotives they supplemented. In response to this, the British Transport Commission drew a 2-8-0 Class 8F based on the Standard Class 5, like the LMS class 5 and 8Fs. Changes included a higher boiler pressure of 250 psi and driving wheels Template:Cvt in diameter to increase tractive effort. Preparations were made for series production to begin, but the work ceased after the Modernisation Plan was published.

PreservationEdit

File:BR Standard Class 5 Doubleheader 73156 73082 Camelot GCR Winter Gala 2023.jpg
73156 and 73082 doubleheading a train at the Great Central Railway in January 2023.

Five members of the class survive and all have steamed in preservation with examples from both builders. 73050 was purchased directly from British Railways for preservation while the other four engines were rescued from Woodham Brothers scrapyard at Barry Island. To date 73096 has been the only member of the class to operate on the main line hauling railtours but in 2018 no. 73082 was moved by rail from its home at the Bluebell Railway to the West Somerset Railway.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Number & Name Tender Attached Builder Built Withdrawn Service life Location Livery Status Image
73050 "City of Peterborough" BR1G Derby Works April 1954 June 1968 14 Years, 2 months Nene Valley Railway BR Lined Black, Early Emblem Boiler ticket expired in 2015, Under Overhaul File:BR Standard Class 5 73050.JPG
73082 "Camelot" BR1B Derby Works July 1955 June 1966 10 years, 11 months Bluebell Railway BR Lined Black, Early Emblem Operational until 2031 File:73082 Camelot on shed.jpg
73096 BR1G Derby Works Nov 1955 Nov 1967 12 years Mid Hants Railway BR Lined Green, Late Crest Purchased by and transferred to the Watercress Line, at which it was formerly a resident under private ownership, in November 2017. Boiler certificate expired in September 2011 awaiting overhaul File:Coming on duty at Alresford - geograph.org.uk - 1289301.jpg
73129 BR1B Derby Works Aug 1956 Dec 1967 11 years, 4 months Midland Railway - Butterley BR Lined Black, Early Emblem Static Display, Boiler ticket expired in 2016. One of only two engines left in Britain with Caprotti valve gear. File:Bewdley - 73129.JPG
73156 BR1B Doncaster Works Dec 1956 Nov 1967 10 Years, 11 months Great Central Railway BR Lined Black, Late Crest Recently emerged from scrapyard condition and came into full traffic in May 2018. File:BR Standard Class 5 73156 Rothley.jpg

ReferencesEdit

Template:Reflist

  • A Detailed History of BR Standard Steam Locomotives, - Vol 2 - The 4-6-0 and 2-6-0 Classes. RCTS Template:ISBN
  • Template:Bradley-StdSteamBR
  • Atkins, C.P. (1988) The BR Standard 2-8-0s. Rly Wld, 49, 222-3.
  • Cliffe, Joseph. (2012) It began with 'Turbomotive'. Backtrack, 26, 637.

External linksEdit

Template:Sister project

{{#invoke:Navbox|navbox}}