The Korean Peninsula Energy Development Organization (KEDO) was an organization founded on March 15, 1995, by the United States, South Korea, and Japan to implement the 1994 U.S.-North Korea Agreed Framework that froze North Korea's indigenous nuclear power plant development centered at the Yongbyon Nuclear Scientific Research Center, that was suspected of being a step in a nuclear weapons program. KEDO's principal activity was to construct two light water reactor nuclear power plants in North Korea to replace North Korea's Magnox type reactors.<ref name=kedo-hostory>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The original target year for completion was 2003.

Since then, other members joined:

KEDO discussions took place at the level of a U.S. Assistant Secretary of State, South Korea's deputy foreign minister, and the head of the Asian bureau of Japan's Foreign Ministry.

The KEDO Secretariat was located in New York.<ref name=cfns-kedo>Template:Citation</ref> KEDO was shut down in 2006.

HistoryEdit

KEDO funding by country (1995 to 2005)
Country U.S. dollars (millions)
South Korea 1,455
Japan 498
United States 405
European Atomic
Energy Community
122
Australia 14
Others 18

Formal ground breaking on the site for two light water reactors (LWR) was on August 19, 1997, at Kumho, 30 km north of Sinpo.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name=ap-19970819>Template:Cite AV media</ref> The Kumho site had been previously selected for two similar sized reactors that had been promised in the 1980s by the Soviet Union, before its collapse.<ref name=bridge-hecker-2010>Template:Cite journal</ref>

Soon after the Agreed Framework<ref name=iaea-INFCIRC457>Template:Cite news</ref> was signed, U.S. Congress control changed to the Republican Party, who did not support the agreement.<ref name=sigal>Template:Citation</ref><ref>Joint resolution relating to the United States-North Korea Agreed Framework and the obligations of North Korea under that and previous agreements with respect to the denuclearization of the Korean Peninsula and dialog with the Republic of Korea Template:Webarchive, House of Representatives, 104th Congress, 1st Session, H.J. Res. 83, September 18, 1995</ref> Some Republican Senators were strongly against the agreement, regarding it as appeasement.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> KEDO's first director, Stephen Bosworth, later commented "The Agreed Framework was a political orphan within two weeks after its signature".<ref name="magazines2003">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Arranging project financing was not easy, and formal invitations to bid were not issued until 1998, by which time the delays were infuriating North Korea.<ref name="autogenerated2003">Template:Cite news</ref> Significant spending on the LWR project did not commence until 2000,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> with "First Concrete" pouring at the construction site on August 7, 2002.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Construction of both reactors was well behind the original schedule.

In the wake of the breakdown of the Agreed Framework in 2003, KEDO largely lost its function. KEDO ensured that the nuclear power plant project assets at the construction site at Kumho in North Korea and at manufacturers' facilities around the world ($1.5 billion invested to date) were preserved and maintained. The project was reported to be about 30% complete. One reactor containment building was about 50% complete and another about 15% finished. No key equipment for the reactors had been moved to the site.

In 2005, there were reports indicating that KEDO had agreed in principle to terminate the light-water reactor project. On January 9, 2006, it was announced that the project was over and the workers would be returning to their home countries. North Korea demanded compensation and has refused to return the approximately $45 million worth of equipment left behind.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Executive DirectorsEdit

|CitationClass=web }}</ref>

  • L. Desaix Anderson, 1997–2001<ref name="autogenerated2003"/>
  • Charles Kartman, 2001–2005<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref><ref name=kartman-2003>Template:Cite news</ref>

See alsoEdit

ReferencesEdit

Template:Reflist

External linksEdit

Template:Nuclear program of North Korea Template:Economy of North Korea Template:Authority control