Template:Short description Template:Use dmy dates Template:Use British English

File:Rainhill Trials in the Illustrated London News.jpg
Later conjectural drawing of the Rainhill trials. In the foreground is Rocket and in the background are Sans Pareil (right) and Novelty.

The Rainhill trials were a competition run from 6 to 14 October 1829, to test George Stephenson's argument that locomotives would have the best motive power for the then nearly-completed Liverpool and Manchester Railway (L&MR).Template:Sfn Ten locomotives were entered, of which five were able to compete, running along a Template:Convert length of level track at Rainhill, in Lancashire (now Merseyside).

Stephenson's Rocket was the only locomotive to complete the trials, and was declared the winner. The directors of the L&MR accepted that locomotives should operate services on their new line, and George and Robert Stephenson were given the contract to produce locomotives for the railway.

BackgroundEdit

The directors of the Liverpool and Manchester Railway had originally intended to use stationary steam engines to haul trains along the railway using cables.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> They had appointed George Stephenson as their engineer of the line in 1826, and he strongly advocated for the use of steam locomotives instead.Template:Sfn As the railway was approaching completion, the directors decided to hold a competition to decide whether locomotives could be used to pull the trains; these became the Rainhill trials.Template:Sfn A prize of £500 (equal to £Template:Inflation today) was offered to the winner of the trials.Template:Sfn

Three engineers were selected as judges: John Urpeth Rastrick, a locomotive engineer of Stourbridge; Nicholas Wood, a mining engineer from Killingworth with considerable locomotive design experience; and John Kennedy, a Manchester cotton spinner and a major proponent of the railway.Template:Sfn

RulesEdit

The L&MR company set the rules for the trials. The rules went through several revisions; the final set, under which the competition was held, was:

<templatestyles src="Template:Blockquote/styles.css" />

"The weight of the Locomotive Engine, with its full complement of water in the boiler, shall be ascertained at the Weighing Machine, by eight o'clock in the morning, and the load assigned to it shall be three times the weight thereof. The water in the boiler shall be cold, and there shall be no fuel in the fireplace. As much fuel shall be weighed, and as much water shall be measured and delivered into the Tender Carriage, as the owner of the Engine may consider sufficient for the supply of the Engine for a journey of thirty-five miles. The fire in the boiler shall then be lighted, and the quantity of fuel consumed for getting up the steam shall be determined, and the time noted."{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }} <templatestyles src="Template:Blockquote/styles.css" />

"The Tender Carriage, with the fuel and water, shall be considered to be, and taken as a part of the load assigned to the Engine."{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }} <templatestyles src="Template:Blockquote/styles.css" />

"Those engines which carry their own fuel and water, shall be allowed a proportionate deduction from their load, according to the weight of the Engine."{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }} <templatestyles src="Template:Blockquote/styles.css" />

"The Engine, with the carriages attached to it, shall be run by hand up to the Starting Post, and as soon as the steam is got up to fifty pounds per square inch (Template:Convert), the engine shall set out upon its journey."{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }} <templatestyles src="Template:Blockquote/styles.css" />

"The distance the Engine shall perform each trip shall be one mile and three quarters (Template:Convert) each way, including one-eighth of a mile (Template:Convert) at each end for getting up the speed and for stopping the train; by this means the Engine, with its load, will travel one and a-half mile (Template:Convert) each way at full speed."{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }} <templatestyles src="Template:Blockquote/styles.css" />

"The Engines shall make ten trips, which will be equal to a journey of Template:Convert; Template:Convert whereof shall be performed at full speed, and the average rate of travelling shall not be less than ten miles per hour (Template:Convert)."Template:Efn{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }} <templatestyles src="Template:Blockquote/styles.css" />

"As soon as the Engine has performed this task (which will be equal to the travelling from Liverpool to Manchester), there shall be a fresh supply of fuel and water delivered to her; and, as soon as she can be got ready to set out again, she shall go up to the Starting Post, and make ten trips more, which will be equal to the journey from Manchester back again to Liverpool."{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }} <templatestyles src="Template:Blockquote/styles.css" />

"The time of performing every trip shall be accurately noted, as well as the time occupied in getting ready to set out on the second journey."<ref>Template:Cite book</ref>{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }} <templatestyles src="Template:Blockquote/styles.css" />

"The gauge of the railway to be Template:Railgauge."{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }}

EntriesEdit

Ten locomotives were officially entered for the trials, but on the day the competition began – 6 October 1829 – only five were available to run:<ref>Template:Cite book</ref>

{{#invoke:Gallery|gallery}}

CompetitionEdit

The length of the L&MR that ran past Rainhill village was straight and level for over Template:Convert, and was chosen as the site for the trials. The locomotives were to run at Kenrick's Cross, on the mile east from the Manchester side of Rainhill Bridge.<ref name=dickson/> Two or three locomotives ran each day, and several tests for each locomotive were performed over the course of six days.Template:Sfn Between 10,000 and 15,000 people turned up to watch the trials, and bands provided musical entertainment.<ref name=dickson/>

Cycloped was the first to drop out of the competition. It used a horse walking on a drive belt for power and was withdrawn after an accident caused the horse to burst through the floor of the engine.

The next locomotive to retire was Perseverance, which was damaged in transit to the competition. Burstall spent the first five days of the trials repairing his locomotive, and though it ran on the sixth day, it failed to reach the required Template:Convert speed and was withdrawn from the trial. It was granted a £25 consolation prize (equal to £Template:Inflation today).

Sans Pareil nearly completed the trials, though at first there was some doubt as to whether it would be allowed to compete as it was Template:Convert overweight. It completed eight trips before cracking a cylinder. Despite the failure it was purchased by the L&MR, where it ran for two years before being leased to the Bolton and Leigh Railway.

The last locomotive to drop out was Novelty which used advanced technology for the time, and was lighter and considerably faster than the other locomotives in the competition. It was the crowd favourite and reached a then-astonishing Template:Convert on the first day of competition.<ref name="dickson">Template:Cite book</ref> It later suffered damage to a boiler pipe which could not be fixed properly on site. Nevertheless, it ran the next day and reached Template:Convert before the repaired pipe failed and damaged the engine severely enough that it had to be withdrawn.

The Rocket was the only locomotive that completed the trials. It averaged Template:Convert and achieved a top speed of Template:Convert) hauling 13 tons, and was declared the winner of the £500 prize (equal to £Template:Inflation today). The Stephensons were given the contract to produce locomotives for the L&MR.<ref name="Wolmar, Fire and Steam, 36-37" >Wolmar, Fire and Steam, pp. 36–37</ref>

The Times carried a full report of the trials on 12 October 1829 from which the following extract are taken:

<templatestyles src="Template:Blockquote/styles.css" />

THURSDAY – THIRD DAY: Mr. Stephenson's engine, "The Rocket," weighing 4 tons 3 cwt., performed, to-day, the work required by the original conditions. The following is a correct account of the performance: The engine, with its complement of water, weighed 4 tons 5 cwt., and the load attached to it was 12 tons 15 cwt., and, with a few persons who rode, made it about 13 tons. The Journey was 1.21 mile each way, with an additional length of 220 yards at each end to stop the engine in, making in one Journey 3[?] miles. The first experiment was of 35 miles, which is exactly ten journeys, and, including all the stoppages at the ends, was performed in 3 hours and 10 minutes, being upwards of 11 miles an hour. After this a fresh supply of water was taken in, which occupied 16 minutes, when the engine again started, and ran 35 miles in 2 hours and 52 minutes, which is upwards of 12 miles an hour, including all stoppages. The speed of the engine, with its load when in full motion, was from 14 to 17 miles an hour; and had the whole distance been in one continuing direction, there is no doubt but the result would have been 16 miles an hour. The consumption of coke was very moderate, not exceeding half a ton in the whole 70 miles. At several parts of the journey the engine moved at 18 miles an hour.

SATURDAY – FIFTH DAY: In the expectation of witnessing the Novelty perform its appointed task, the attendance of company on the ground was more numerous today than it had been on several of the preceding days. Three times its own weight having been attached to the engine, the machine commenced its task, and performed it at the rate of 16 miles in the hour. Mr. Stephenson's engine, the Rocket, also exhibited today. Its tender was completely detached from it, and the engine alone shot along the road at the almost incredible rate of 32 miles in the hour. So astonishing was the celerity with which the engine, without its apparatus, darted past the spectators, that it could be compared to nothing but the rapidity with which the swallow darts through the air. Their astonishment was complete, every one exclaiming involuntarily, "The power of steam".<ref>Template:Cite news</ref>{{#if:|{{#if:|}}

}}

{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Blockquote with unknown parameter "_VALUE_"|ignoreblank=y| 1 | 2 | 3 | 4 | 5 | author | by | char | character | cite | class | content | multiline | personquoted | publication | quote | quotesource | quotetext | sign | source | style | text | title | ts }}

Additional trialsEdit

After the Rainhill trials, Rocket was tested on the Whiston Incline and was able to haul eight tons at Template:Convert and 12 tons at Template:Convert up the 1:96 gradient.Template:Sfn

Re-enactmentsEdit

Rocket 150Edit

Template:Sister project In May 1980, the Rocket 150 celebration was held to mark the 150th anniversary of the opening of the Liverpool and Manchester Railway and the trials the year before.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

A replica of Novelty was built for the event, which was also attended by replicas of Sans Pareil and Rocket (plus coach). On the first day of the Trials, the Rocket came off the rails as it was exiting the Bold Colliery sidings and buckled the rim of one of its large drive wheels. That evening, senior staff from a St Helens road transport company met a former colleague of the builder of the Rocket replica at a Liverpool hotel and agreed that, in the early hours of the following morning, they would urgently manufacture some steel parts (wedges) in their nearby workshops, to fix the bent drive wheel before the second day's parade commenced.<ref>Template:Cite magazine</ref> At the same time, British Rail agreed to put a team of staff into the sidings at Bold to straighten the bent rails. Both activities were achieved on time and the Rocket ran successfully on the following two days of the Trials, though Sans Pareil was pushed by Lion and Novelty was on a wagon hauled by LMS Stanier Class 5 4-6-0 5000. As the line was then not electrified, the Advanced Passenger Train was also pushed, but by the latest diesel, Class 56, 077.<ref>Template:Cite magazine</ref>

The 'Grand Cavalcade' on each of the three days featured up to 40 steam and diesel locomotives and other examples of modern traction,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> including:

Two Class 86 locomotives 86214 Sans Pareil<ref>Template:Cite book</ref> and 86235 Novelty<ref>Template:Cite book</ref> were painted in a variation of the Large Logo Rail Blue livery where the BR logo was replaced by the Rocket 150 motif on a yellow background.

2002 RestagingEdit

Template:Unsourced section

In a 2002 restaging of the Rainhill trials using replica engines, neither Sans Pareil (11 out of 20 runs) nor Novelty (10 out of 20 runs) completed the course. In calculating the speeds and fuel efficiencies, it was found that Rocket would still have won, as its relatively modern technology made it a much more reliable locomotive than the others. Novelty almost matched it in terms of efficiency, but its firebox design caused it to gradually slow to a halt due to a buildup of molten ash (called "clinker") cutting off the air supply. The restaged trials were run over the Llangollen Railway, Wales, and were the subject of a 2003 BBC Timewatch documentary.

For the restaging, major compromises were made for television and because of the differences in crew experience, the fuel used, the modifications made to the replicas for modern safety rules, modern materials and construction methods, and following operating experience. Comparisons were made between the engines only after calculations took into account the differences.Template:Fact

ReferencesEdit

NotesEdit

Template:Notelist

FootnotesEdit

Template:Reflist

SourcesEdit

External linksEdit

Template:Sister project

Template:Early-steam-locos